• 제목/요약/키워드: reliability cost evaluation

검색결과 271건 처리시간 0.031초

Evaluation of the Interruption Cost of Distribution Power Systems Considering the Failure Source and the Composite Customer Interruption Cost

  • Park, Sang-Bong;Nam, Kee-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan
    • KIEE International Transactions on Power Engineering
    • /
    • 제3A권3호
    • /
    • pp.124-129
    • /
    • 2003
  • As the power industry moves towards open competition, there has been a call for methodology to evaluate power system reliability by using composite interruption cost. This paper presents algorithms to evaluate the interruption cost of distribution power systems by taking into consideration the failure source and the composite customer interruption cost. From the consumer's standpoint, the composite customer interruption cost is considered as the most valuable index to estimate the reliability of a power distribution system. This paper presents new algorithms that take into account the load by customer type and failure probability by distribution facilities while calculating the amount of unserved energy by customer type. Finally, evaluation results of unserved energy and system interruption cost based on composite customer interruption cost are shown in detail.

기대생애주기비용에 기초한 고속철도교량의 신뢰성-최적설계 방안 (Reliability-Optimal Design Method of High-Speed Railway Bridges Based upon Expected Life-Cycle Cost)

  • 이우상;방명석;한성호;이진옥
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제14권4호
    • /
    • pp.102-110
    • /
    • 2010
  • 신뢰성평가는 고속철도교량에 포함된 불확실성의 영향을 고려하여 정량적 구조안전성을 검토하기 위한 효율적인 방안이며, 신뢰성평가에 기초한 기대생애주기비용은 고속철도교량의 합리적인 안전수준 및 설계기준을 제공할 것이다. 따라서 이 연구에서는 수치해석과 신뢰성평가 결과를 바탕으로 고속철도교량의 기대생애주기비용 및 최적설계 방안을 결정하고자 한다. 이를 위해, 고속철도교량의 표준설계를 기준으로 다양한 설계방안을 설정한 후, 각각의 설계방안에 대해 수치해석을 수행하였으며, 설계강도 한계상태방정식에 따른 신뢰성평가는 수치해석결과를 토대로 외적 불확실성의 영향을 고려하여 수행하였다. 고속철도교량의 기대생애주기비용은 각각의 설계방안에 따른 신뢰성평가 결과를 바탕으로 산정 하였다. 또한 최적설계 방안은 산정된 기대생애주기비용을 이용하여 결정하였다. 아울러, 최적설계 방안의 신뢰성평가 결과 및 기대생애주기비용에 대해 내적 불확실성의 영향을 고려하여 검토하였다. 이 연구결과는 고속철도교량의 체계적인 안전성 평가 및 최적 구조설계를 위한 기초자료로 활용될 것으로 기대된다.

최적 공급신뢰도 레벨 결정을 위한 정전비용의 평가 (Evaluation of Interruption Cost for Determination of Optimal Reliability Level)

  • 최상봉;김대경;정성환;김호용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.204-206
    • /
    • 2001
  • This paper presents methodology to evaluate interruption cost for determination of optimal reliability level. Recently, the power interruption cost is considered one of the useful index to determine optimal reliability level. Accordingly, in this paper reports estimation results of customer interruption cost to determine optimal reliability level by the economic macro method based on the 5 years from 1995 to 1999 and various kinds of customers in Korea.

  • PDF

신뢰도와 고조파를 고려한 배전시스템의 평가 및 계획 (Evaluation and Planning of Distribution System Considering Reliability and Harmonics)

  • 이범;김용하;최상규
    • 에너지공학
    • /
    • 제14권3호
    • /
    • pp.167-172
    • /
    • 2005
  • 본 연구에서는 가치에 기반을 두고 배전시스템을 계획할 수 있는 방법을 제시하였다. 우선, 신뢰도를 평가하기 위하여 VBDRA를 도입하였으며, 고조파를 평가하기 위하여 한계가격기법을 도입하였다. 그리고, 신뢰도비용, 고조파비용, 건설비용을 사용하여 가장 경제적인 대체안을 결정을 할 수 있도록 하였다. 제안한 방법을 실제시스템에 적용하여 그 유용성을 입증하였다.

해상풍력단지의 내부 계통망 구성을 위한 신뢰도 평가에 관한 연구 (A Study on Reliability Evaluation for Constructing Inner Grid of Offshore Wind Farm)

  • 배인수;신제석;김진오
    • 조명전기설비학회논문지
    • /
    • 제27권11호
    • /
    • pp.89-95
    • /
    • 2013
  • In resent years, Offshore Wind Farm (OWF) is being actively developed. Typically, OWF has a better wind resource than onshore one, but also have a very high investment cost and maintenance cost. Furthermore, due to a difficulty of geographical access, OWF can be affected by the failure for a longer time. As the result, OWF has a higher loss cost. Therefore, a reliability evaluation should be performed more carefully at OWF planning stage. In this paper, a methodology for the reliability evaluation on inner grid is suggested. Inner grid connects wind turbines via submarine cables and transfers power to offshore substation. According to location of the faulted cable under layouts of inner grid, the transfer ability of inner grid is influenced. In order to indicate the transfer ability of inner grid, several indices are introduced such as PNDR, EEND and EENDC. To demonstrate the methodology described in this paper, diversity case studies were performed.

마이크로 그리드에서 분산전원의 최적 운영 방안 (Optimal Operation of Dispersed Generation in MicroGrid Systems)

  • 김규호;이상봉;김수남;이상근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.486_487
    • /
    • 2009
  • This paper presents a method for optimal operation to improve reliability of MicroGrid systems considering load types and interruption cost. The objective functions such as power losses cost, operation cost of dispersed generations, power purchasing cost, and interruption cost are minimized for reliability improvement and efficient operation. The several indices for reliability evaluation are improved by renewable energy sources installation.

  • PDF

SRGM을 이용한 소프트웨어 신뢰도 평가에 관한 연구 (A Study on Software Reliability Evaluation Using SRGM)

  • 신경애
    • 한국컴퓨터산업학회논문지
    • /
    • 제4권4호
    • /
    • pp.553-560
    • /
    • 2003
  • 현재까지 연구된 SRGM을 이용하여 정해진 시각에 수집된 테스트 데이터를 가지고 예상되는 소프트웨어 고장이나 잔존 에러수를 추정할 수 있다. 그러므로 소프트웨어 신뢰성 달성 정도 및 운용 단계에서 소프트웨어 신뢰도를 예측할 수 있다. 그러나 어느 모델을 선택하는가에 따라 신뢰도 평가는 달라질 수 있다. 그러므로 본 연구에서는 에러제거 비용을 고려한 SRGM으로서 테스트 비용을 에러 검출 및 에러제거 비용까지도 고려한 SRGM을 제시하고자 한다. 또한 이를 이용하여 소프트웨어에 있는 잔존 에러수와 릴리즈 이후 신뢰도 값과 최적 릴리즈 시기를 추정하여 보다 더 정확한 신뢰성 평가를 할 수 있다.

  • PDF

가치산정법에 의한 전력품질비용 산정 및 단일화지수의 개발 (Evaluation of Power Quality Cost Based on Value-Based Methodology and Development of Unified Index)

  • 이범;김경민
    • 전기학회논문지
    • /
    • 제60권7호
    • /
    • pp.1293-1298
    • /
    • 2011
  • This paper presents an Unified Index which can evaluate a performance of a distribution system based on value-based methodology. Reliability cost and voltage sags cost are calculated for each load point using Reliability Sector Customer Damage Function(SCDF). Aging cost is calculated for each load point using Aging SCDF. Power loss cost and operation cost are calculated for the system. By summation of each cost of load point and system, power quality cost can be obtained. Finally, this paper developed an unified index which can show the performance of a distribution system. Presented method has been applied to a real system, the usefulness of the method has been verified.

GUI를 이용한 복합전력계통의 신뢰도해석 및 확률론적 발전비산정 프로그램 개발 (Development of a Program for Reliability and Probabilistic Production Cost Evaluation of Composite Power Systems using GUI)

  • 문승필;김홍식;차준민;노대석;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.243-245
    • /
    • 2001
  • The reliability and probabilistic generation production cost evaluation of composite power systems are important for power system operation and expansion planning. This paper present a computer program which can evaluate the reliability and probabilistic generation production cost of composite power system using GUI(Graphic User Interface). In this computer program, Monte Carlo simulation methods and CMELDC(CoMposite power system Effective Load Duration Curve) were used.

  • PDF

분산전원의 영향과 정전비용을 고려한 신뢰도 향상 (Reliability Improvement Considering Effect of Dispersed Generator and Interruption Cost in Distribution Systems)

  • 김규호;송경빈
    • 조명전기설비학회논문지
    • /
    • 제20권10호
    • /
    • pp.172-177
    • /
    • 2006
  • 본 연구에서는 배전계통의 부하지점의 부하형태에 따른 정전비용의 영향을 고려하여 분산전원을 설치함으로써 운영비용 및 정전비용을 최소화하는 방안을 제안하였다. 가정용, 산업용, 상업용, 사무용 및 농업용 등 부하형태를 실제 계통과 유사하게 고려함으로써 정확한 신뢰도 지수와 운영비용을 구할 수 있고, 이를 통해 총 운영비용 최소화에 더욱 접근할 수 있다. 특히 정전시 각 부하지점에 설치된 분산전원에 의해 전력이 공급되어 전력구입 비용과 정전비용의 경우 효과적으로 감소됨을 알 수 있었으며, 정전빈도와 정전시간이 감소되어 전력 공급률이 향상되어 신뢰도 지수가 좋아졌음을 알 수 있었다.