• Title/Summary/Keyword: recession time

Search Result 134, Processing Time 0.026 seconds

Taxonomic Strudy of the Combitid Fish, Cobitis Iutheri Rendahl and C. striata Ikeda (Cobitidae) from Korea (한국산 점줄종개(Cobitis lutheri) 와 줄종개(C.striata)의 분류학적 연구)

  • 김익수;이금영
    • Animal Systematics, Evolution and Diversity
    • /
    • v.4 no.2
    • /
    • pp.91-102
    • /
    • 1988
  • Both Cobitis lutheri Rendahl and C.striata Ikeda previously regarded as the subspecies of C.taenia are revised here and raised to the species rank based on the distinct color pattern on their body sides in relation to the shpae of lamina circularis and suborbital spine, and distinct distributional patter. C. lutheri was similar to C. striata in chromosome number and karyotype, but chromosomal polymorphism as Robert sonian event was confirmed only in the population of C.lutheri studies. Both, C. kutheri and C..striata have disjunct ranges : the former in western Korea and east-northern China Mainland, the latter in the Smjin River of korea and west-southern Japan. hybridization between C. lutheri and C. striata by secondary contact appeared in the limited zone of the Dongjin River, Chllabuk-do province, korea, but the evidence for habitat segregation between them suggests the possibility that natural hybridization occurs between the two species and introgression results. We consider that the two species were produced as ecological equivalent species in the different branch stream of the Paleo-Hwangho River , The time of recession of sea level during the gracial period.

  • PDF

LEARNING FROM THE SOUTH KOREAN RISK MANAGEMENT PLAN FOR THE SHIPBUILDING INDUSTRY DURING THE DIFFICULT 2004-2005 YEARS

  • Seng-Kiong Ting;Mengqiong Wang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.990-994
    • /
    • 2009
  • With the world in financial recession, the general trend of global trade is declining. As a result, the world leading shipbuilding industries are confronted with an even more difficult task of mitigating various risks associated with the industries. How well the three shipbuilding industries, Japan, Korea and China, can adapt and manage the risks will be crucial. As the youngest of the top three, the Chinese industry faces greater risks. As it happens to share many factors with that of South Korea in 2004-2005, it is necessary to review and evaluate the risk management plan used by South Korea. This paper presents an evaluation of the risk management plan for shipbuilding industry in South Korea during 2004-2005, considering the financial and political environments at that time. This will help us to structure a plan of risk management for the future.

  • PDF

SINGAPORE CONTRACTORS' ATTITUDES TOWARDS ENVIRONMENTAL SUSTAINABILITY

  • B.T.H. Lim;B. L. Oo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.537-543
    • /
    • 2009
  • Noting the changes within the Singapore construction industry, fuelled by the government's 'green' initiatives in tandem with the prolonged effect of the 1997-2005 recession, this paper investigates Singapore contractors' attitudes towards environmental sustainability. Data were collected from 34 interviews with senior management of large and medium-sized general building contractors and the firms' archival records. The results show that the majority of the contractors embrace positive attitudes towards environmental sustainability. The respective contractors explicitly express their environmental drives by incorporating keywords such as 'quality', 'sustainability' and 'environmental and social benefits' into their firms' mission statements. The results also show that three environmental-related measures implemented by all contractors are: (i) stricter housekeeping procedures in construction sites; (ii) stricter wastage rates for construction materials; and (iii) greater focus on Just-In-Time delivery to minimise materials deterioration due to inappropriate site storage.

  • PDF

Studies on the Derivation of the Instantaneous Unit Hydrograph for Small Watersheds of Main River Systems in Korea (한국주요빙계의 소유역에 대한 순간단위권 유도에 관한 연구 (I))

  • 이순혁
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.19 no.1
    • /
    • pp.4296-4311
    • /
    • 1977
  • This study was conducted to derive an Instantaneous Unit Hydrograph for the accurate and reliable unitgraph which can be used to the estimation and control of flood for the development of agricultural water resources and rational design of hydraulic structures. Eight small watersheds were selected as studying basins from Han, Geum, Nakdong, Yeongsan and Inchon River systems which may be considered as a main river systems in Korea. The area of small watersheds are within the range of 85 to 470$\textrm{km}^2$. It is to derive an accurate Instantaneous Unit Hydrograph under the condition of having a short duration of heavy rain and uniform rainfall intensity with the basic and reliable data of rainfall records, pluviographs, records of river stages and of the main river systems mentioned above. Investigation was carried out for the relations between measurable unitgraph and watershed characteristics such as watershed area, A, river length L, and centroid distance of the watershed area, Lca. Especially, this study laid emphasis on the derivation and application of Instantaneous Unit Hydrograph (IUH) by applying Nash's conceptual model and by using an electronic computer. I U H by Nash's conceptual model and I U H by flood routing which can be applied to the ungaged small watersheds were derived and compared with each other to the observed unitgraph. 1 U H for each small watersheds can be solved by using an electronic computer. The results summarized for these studies are as follows; 1. Distribution of uniform rainfall intensity appears in the analysis for the temporal rainfall pattern of selected heavy rainfall event. 2. Mean value of recession constants, Kl, is 0.931 in all watersheds observed. 3. Time to peak discharge, Tp, occurs at the position of 0.02 Tb, base length of hlrdrograph with an indication of lower value than that in larger watersheds. 4. Peak discharge, Qp, in relation to the watershed area, A, and effective rainfall, R, is found to be {{{{ { Q}_{ p} = { 0.895} over { { A}^{0.145 } } }}}} AR having high significance of correlation coefficient, 0.927, between peak discharge, Qp, and effective rainfall, R. Design chart for the peak discharge (refer to Fig. 15) with watershed area and effective rainfall was established by the author. 5. The mean slopes of main streams within the range of 1.46 meters per kilometer to 13.6 meter per kilometer. These indicate higher slopes in the small watersheds than those in larger watersheds. Lengths of main streams are within the range of 9.4 kilometer to 41.75 kilometer, which can be regarded as a short distance. It is remarkable thing that the time of flood concentration was more rapid in the small watersheds than that in the other larger watersheds. 6. Length of main stream, L, in relation to the watershed area, A, is found to be L=2.044A0.48 having a high significance of correlation coefficient, 0.968. 7. Watershed lag, Lg, in hrs in relation to the watershed area, A, and length of main stream, L, was derived as Lg=3.228 A0.904 L-1.293 with a high significance. On the other hand, It was found that watershed lag, Lg, could also be expressed as {{{{Lg=0.247 { ( { LLca} over { SQRT { S} } )}^{ 0.604} }}}} in connection with the product of main stream length and the centroid length of the basin of the watershed area, LLca which could be expressed as a measure of the shape and the size of the watershed with the slopes except watershed area, A. But the latter showed a lower correlation than that of the former in the significance test. Therefore, it can be concluded that watershed lag, Lg, is more closely related with the such watersheds characteristics as watershed area and length of main stream in the small watersheds. Empirical formula for the peak discharge per unit area, qp, ㎥/sec/$\textrm{km}^2$, was derived as qp=10-0.389-0.0424Lg with a high significance, r=0.91. This indicates that the peak discharge per unit area of the unitgraph is in inverse proportion to the watershed lag time. 8. The base length of the unitgraph, Tb, in connection with the watershed lag, Lg, was extra.essed as {{{{ { T}_{ b} =1.14+0.564( { Lg} over {24 } )}}}} which has defined with a high significance. 9. For the derivation of IUH by applying linear conceptual model, the storage constant, K, with the length of main stream, L, and slopes, S, was adopted as {{{{K=0.1197( {L } over { SQRT {S } } )}}}} with a highly significant correlation coefficient, 0.90. Gamma function argument, N, derived with such watershed characteristics as watershed area, A, river length, L, centroid distance of the basin of the watershed area, Lca, and slopes, S, was found to be N=49.2 A1.481L-2.202 Lca-1.297 S-0.112 with a high significance having the F value, 4.83, through analysis of variance. 10. According to the linear conceptual model, Formular established in relation to the time distribution, Peak discharge and time to peak discharge for instantaneous Unit Hydrograph when unit effective rainfall of unitgraph and dimension of watershed area are applied as 10mm, and $\textrm{km}^2$ respectively are as follows; Time distribution of IUH {{{{u(0, t)= { 2.78A} over {K GAMMA (N) } { e}^{-t/k } { (t.K)}^{N-1 } }}}} (㎥/sec) Peak discharge of IUH {{{{ {u(0, t) }_{max } = { 2.78A} over {K GAMMA (N) } { e}^{-(N-1) } { (N-1)}^{N-1 } }}}} (㎥/sec) Time to peak discharge of IUH tp=(N-1)K (hrs) 11. Through mathematical analysis in the recession curve of Hydrograph, It was confirmed that empirical formula of Gamma function argument, N, had connection with recession constant, Kl, peak discharge, QP, and time to peak discharge, tp, as {{{{{ K'} over { { t}_{ p} } = { 1} over {N-1 } - { ln { t} over { { t}_{p } } } over {ln { Q} over { { Q}_{p } } } }}}} where {{{{K'= { 1} over { { lnK}_{1 } } }}}} 12. Linking the two, empirical formulars for storage constant, K, and Gamma function argument, N, into closer relations with each other, derivation of unit hydrograph for the ungaged small watersheds can be established by having formulars for the time distribution and peak discharge of IUH as follows. Time distribution of IUH u(0, t)=23.2 A L-1S1/2 F(N, K, t) (㎥/sec) where {{{{F(N, K, t)= { { e}^{-t/k } { (t/K)}^{N-1 } } over { GAMMA (N) } }}}} Peak discharge of IUH) u(0, t)max=23.2 A L-1S1/2 F(N) (㎥/sec) where {{{{F(N)= { { e}^{-(N-1) } { (N-1)}^{N-1 } } over { GAMMA (N) } }}}} 13. The base length of the Time-Area Diagram for the IUH was given by {{{{C=0.778 { ( { LLca} over { SQRT { S} } )}^{0.423 } }}}} with correlation coefficient, 0.85, which has an indication of the relations to the length of main stream, L, centroid distance of the basin of the watershed area, Lca, and slopes, S. 14. Relative errors in the peak discharge of the IUH by using linear conceptual model and IUH by routing showed to be 2.5 and 16.9 percent respectively to the peak of observed unitgraph. Therefore, it confirmed that the accuracy of IUH using linear conceptual model was approaching more closely to the observed unitgraph than that of the flood routing in the small watersheds.

  • PDF

Population Pharmacokinetics of Clarithromycin in Healthy Adult Korean (클라리스로마이신의 건강한 한국 성인에 대한 집단 약물동태)

  • 권광일;김호순;손수정
    • YAKHAK HOEJI
    • /
    • v.46 no.1
    • /
    • pp.63-68
    • /
    • 2002
  • The purpose of this study was to estimate the population pharmacokinetics of clarithromycin in healthy adult Korean and to investigate the factors influencing the pharmacokinetics of clarithromycin. The population pharmacokinetic parameters of clarithromycin were calculated with the data from healthy adult Koreans. A total of 798 plasma concentrations obtained from 78 subjects after administration of a single oral dose of 250 mg or 500 mg were used for the modeling. The concentration-time data were fitted to a one-compartment open model assuming a first-order absorption and elimination with no lag time. The correlations between various factors [such as sex, age, height, weight, sect creatinine (Scr) and dose and pharmacokinetic parameters were estimated with stepwise linear recession analyses. The selected covariates were incorporated in the population model of NONMEM, and the importance of each covariate was investigated by means of backwards elimination. The apparent clearance (CL/F) was significantly correlated to Scr and sex, and the apparent volume of distribution (Vd/F) was significantly correlated to Scr and height in a nonlinear relationship. The population values of Ka was 1.8 h $r_{-1}$, CL/F was 37.71 L/hr, Vd/F was 200 L and t/ sub 1/2 / was 3.68 hrs for a male Korean with 170 m height and 1.0 mg/dL Scr.

Verification of ERP Standard Time Using TOC Technique and Improvement of MES Routing Point (TOC 기법을 적용한 ERP 표준시간 검증 및 MES 공정실적개선)

  • Kim, Sung-Min;Ahn, Jaekyoung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.22-33
    • /
    • 2018
  • Recently domestic manufacturing companies have been experiencing worsening profitability and stunted growth due to the long-term economic recession and the rapid rise of developing countries such as China and Southeast Asia. These difficulties force many companies to concentrate their core competencies on new value creation and innovation in order to gain momentum for new growth. Enterprise Resource Planning (ERP) has been considered as one of viable solutions. Among the various modules in ERP, shop floor control function in the production management module is rather limited. In order to overcome this problem, Manufacturing Execution System (MES) has been used as a subsystem which has a strong information gathering power and flexibility. Both systems interact closely with each other. In particular, ERP requires fast, accurate shop floor information at MES. This paper describes how to synchronize relevant information between ERP and MES with theory of constraints (TOC). The processing time information transmitted from the MES workplace is received at the ERP workplace. In the process, the received processing time is causing information distortion in ERP, when the information gathering standard of MES is different from the ERP information interpretation standard. The Drum-Buffer-Rope theory of TOC was applied to resolve this problem, therefore, information synchronization between both systems was made. As a precondition, the standard time of the upper ERP system was rearranged according to the capacity constraints resource. As a result, standard time restructuring has affected changes in labor costs. Standard labor costs have come close to actual ones, and information synchronization of MES transmission data has improved the reliability of standard product costs, such that it enabled various company-wide restructuring actions to be much more effective.

Comparative Study on the Runoff Process of Granite Drainage Basins in Korea and Mongolia

  • Tanaka, Yukiya;Matsukura, Yukinori
    • The Korean Journal of Quaternary Research
    • /
    • v.17 no.2
    • /
    • pp.79-84
    • /
    • 2003
  • This study revealed the differences in runoff processes of granite drainage basins in Korea and Mongolia by hydrological measurements in the field. The experimental drainage basins are chosen in Korea (K-basin) and Mongolia (M-basin). Occurrence of intermittent flow in K-basin possibly implies that very quick discharge dominates. The very high runoff coefficient implies that most of effective rainfall quickly discharge by throughflow or pipeflow. The Hortonian overlandflow is thought to almost not occur because of high infiltration capacity originated by coarse grain sized soils of K- basin. Very little baseflow and high runoff coefficient also suggest that rainfall almost does not infiltrate into bedrocks in K-basin. Flood runoff coefficient in M-basin shows less than 1 %. This means that most of rainfall infiltrates or evaporates in M-basin. Runoff characteristics of constant and gradually increasing discharge imply that most of rainfall infiltrates into joint planes of bedrock and flow out from spring very slowly. The hydrograph peaks are sharp and their recession limbs steep. Very short time flood with less than 1-hour lag time in M-basin means that overland flow occurs only associating with rainfall intensity of more than 10 mm/hr. When peak lag time shows less than 1 hour for the size of drainage area of 1 to 10 km2, Hortonian overland flow causes peak discharge (Jones, 1997). The results of electric conductivity suggest that residence time in soils or weathered mantles of M-basin is longer than that of K-basin. Qucik discharge caused by throughflow and pipeflow occurs dominantly in K-basin, whereas baseflow more dominantly occur than quick discharge in M-basin. Quick discharge caused by Hortonian overlandflow only associating with rainfall intensity of more than 10 mm/hr in M-basin.

  • PDF

Characteristics of the Rainfall-Runoff and Groundwater Level Change at Milbot Bog located in Mt.Cheonseong (천성산 밀밭늪의 강우 유출 및 지하수위 변동 특성)

  • Jung, Yu-Gyeong;Lee, Sang-Won;Lee, Heon-Ho
    • Journal of Korean Society of Forest Science
    • /
    • v.99 no.4
    • /
    • pp.559-567
    • /
    • 2010
  • This study was conducted to investigate the hydrological characteristics of groundwater level change and rainfall hydrological runoff processes caused by tunnel construction at Milbot bog located in Mt. Cheonseong. Data were collected from July 2004 to May 2008. The results were summarized as follows: The occurrence time of the direct runoff caused by unit rainfall at the Milbot bog were tended to be slower than those at general mountainous basin. Also, runoff did not sensitively respond to amount of rainfall at the most of the long and short term hydrograph. The annual runoff rates from 2004 to 2008 were 0.26, 0.13, 0.16, 0.25 and 0.27, respectively, slightly increased after 2005 regardless of the tunnel construction. Thus, the function of Milbot bog will be weakened, and it supposed to be changed to land in the future because of increasing annual runoff. The annual runoff rate for 4 years was 0.19, which is greatly lower than that of general mountainous basin. The recession coefficient of the direct runoff in short term hydrograph was ranged to 0.89~0.97, which is much larger than that of the general mountainous basin, 0.2~0.8. The recession coefficient of base flow ranged from 0.93 to 0.99, which are similar to general mountainous watershed's values. Groundwater level of Milbot bog increased or decreased in proportion to rainfall intensity, and in the descending time after the groundwater level was reached at peak point, it tends to be decreased very slowly. Also, groundwater level increased or decreased maintaining relatively high value after precedent rainfall. Groundwater level was highest during summer with heavy rainfall, but was lowest during winter. Average groundwater levels decreased annually from 2004 to 2008, -8.48 cm, -14.60 cm, -20.46 cm, -20.11 cm, -28.59 cm, respectively. Therefore, it seems that the Milbot bog is becoming dry and losing its function as a bog.

Time-Series Prediction of Baltic Dry Index (BDI) Using an Application of Recurrent Neural Networks (Recurrent Neural Networks를 활용한 Baltic Dry Index (BDI) 예측)

  • Han, Min-Soo;Yu, Song-Jin
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2017.11a
    • /
    • pp.50-53
    • /
    • 2017
  • Not only growth of importance to understanding economic trends, but also the prediction to overcome the uncertainty is coming up for long-term maritime recession. This paper discussed about the prediction of BDI with artificial neural networks (ANN). ANN is one of emerging applications that can be the finest solution to the knotty problems that may not easy to achieve by humankind. Proposed a prediction by implementing neural networks that have recurrent architecture which are a Recurrent Neural Network (RNN) and Long Short-Term Memory (LSTM). And for the reason of comparison, trained Multi Layer Perceptron (MLP) from 2009.04.01 to 2017.07.31. Also made a comparison with conventional statistics, prediction tools; ARIMA. As a result, recurrent net, especially RNN outperformed and also could discover the applicability of LSTM to specific time-series (BDI).

  • PDF

Social Media Analytics to Understand the Construction Industry Sentiments

  • Shrestha, K. Joseph;Mani, Nirajan;Kisi, Krishna P.;Abdelaty, Ahmed
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.712-720
    • /
    • 2022
  • The use of social media to disseminate news and interact with project stakeholders is increasing over time in the construction industry. Such social media data can be analyzed to get useful insights of the industry such as demands of new housing construction and satisfaction of construction workers. However, there has been a limited attempts to analyze social media data related to the construction industry. The objective of this study is to collect and analyze construction related tweets to understand the overall sentiments of individuals and organizations about the construction industry. The study collected 87,244 tweets from April 6, 2020, to April 13, 2020, which had hashtags relevant to the construction industry. The tweets were then analyzed to evaluate its sentiments polarity (positive or negative) and sentiment intensity or scores (-1 to +1). Descriptive statistics were produced for the tweets and the sentiment scores were visualized in a scatterplot to show the trend of the sentiment scores over time. The results shows that the overall sentiment score of all the tweets was slightly positive (0.0365). Negative tweets were retweeted and marked as favorite by more users on average than the positive ones. More specifically, the tweets with negative sentiments were retweeted by 2,802 users on average compared to the tweets with positive sentiments (247 average retweet count). This study can potentially be expanded in the future to produce a real time indicator of the construction market industry such as the increased availability of construction jobs, improved wage rates, and recession.

  • PDF