• Title/Summary/Keyword: range of disturbed rock zone(DRZ)

Search Result 1, Processing Time 0.019 seconds

Effect of the Drilling & Blasting Conditions on the Range of Overbreak in Tunel Excavation (터널굴착시 천공 및 발파조건이 여굴의 크기에 미치는 영향)

  • Kim, Gyung-Hun;Lim, Han-Uk
    • Journal of Industrial Technology
    • /
    • v.24 no.B
    • /
    • pp.3-17
    • /
    • 2004
  • Overbreak, underbreak and range of disturbed rock zone (DRZ) are the most important factors in evaluating the results of tunnel blasting. These factors, which depend on the discontinuities in rock mass, the blasting patterns and drilling conditions, have been studied. The range of DRZ can be estimated by relationships between vibration velocity and associated tensile stress. A new computerized rocket jumbo drill has been adopted to reduce overbreak based on the analysis of drilling accuracy. In-situ blasting tests were also performed by varying initiating systems. Overbreak can be reduce from 34.5cm to 20cm. The range of DRZ is 0.2m with stoping holes and 0.4m with wall holes respectively. In addition, some methods to reduce DRZ have been presented in this study.

  • PDF