• Title/Summary/Keyword: railway tunnels

Search Result 220, Processing Time 0.021 seconds

Precast Full Span Construction of Continuous PSC Box Girder Bridge for High Speed Railway (고속철도 PSC 박스거더 연속고의 프리캐스트 경간 일괄 가설)

  • Park Jeong Wha;Kim Kwang Soo;Sim Chungwook;Yoon Chul-Soo
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1168-1173
    • /
    • 2004
  • Bridges and tunnels mainly compose the structural system of Kyung-bu high-speed railway in Korea and the prestressed concrete box girder bridges are applied for the most part of bridge structures. Precast full span construction method was practiced in the construction of many prestressed concrete box girder bridges in Kyung-bu high speed railway for the high quality, great construction speed, low construction cost and construction safety. However, there have been no application of this method in continuous bridges until now. Therefore, a new advanced precast full span construction method is developed using pre-tensioning for precast and post-tensioning in alternating the simple span into a continuous bridge system. since the high-speed railway trains can cause dynamic problems in a continuous bridge. This study shows the structural behavior and the construction process of the new advance method.

  • PDF

A study on the rescue design of passengers for railway tunnel fire accidents by using simulation program (터널 화재발생시 시뮬레이션 프로그램을 통한 승객대피계획)

  • Kwon, Soon-Sub;Lee, Jong-Sun;Lee, Kwan-Ho;Kwon, Woo-Sung
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1770-1773
    • /
    • 2007
  • Fire accident in tunnel is one of the most critical railway accidents, together with overturning of train by derailment and train crash. Tunnel structures contribute to minimize the cost and time of transport, but in case of railway fire accident occurring bring serious damages of human life caused by narrowness of shelter, poisonous smoke and high temperature raised at the inside of tunnel. For that reason, at the beginning of plan of tunnel, the optimum design for rescue of passengers is needed. For the detail and most suitable design for rescue of passengers, many tunnel designer substituted simulation program for mock examination by its high cost and effort. In this study, simulation program techniques, such as Fluent and Simulex, are applied for verifying the rescue design of passengers reduced the risk when fire accident occurred at tunnel utilizing of case study for planned railway tunnels shows 1,245m length in Iksan-Sili area.

  • PDF

Construction of Continuous Bridges in Hi8h-Speed Railway using Precast Span Method (프리캐스트 스팬 공법을 적용한 고속철도 연속교 시공)

  • 김성일;김성호;이원표;윤철수
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.401-407
    • /
    • 2001
  • Out of 412km long Kyung-bu high-speed railway, 302km was designed in tile form of either bridges or tunnels. Most of bridges were designed to be prestressed concrete box girder type. The precast span method was selected because of good quality of bridge section secured by factory manufacturing, fast construction speed, low construction cost with mechanized construction and the safety fur field workers. The precast span method has been mainly utilized in bridges consisted of repeated simple spans. However, we applied the precast span method to continuous bridge for high-speed railway Since it was the first attempt to apply ate precast span method to a continuous bridge for high-speed railway, many design and construction details were studied and implemented in the construction. Design and construction processes of a continuous bridge construction using tile precast span mettled are briefly described in this paper.

  • PDF

Aerodynamic analysis for train operation without the effect of the passenger ear-discomfort in tunnel of new Seoul-Chunchon line (경춘선 1급 신설터널에서 열차승객의 이명감 없이 주행 가능한 열차속도에 대한 연구)

  • 김동현
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.495-502
    • /
    • 2000
  • For the tunnel design of the first class on new Seoul-Chunchon railway, we investigated for train speeds to run through tunnels without ear-discomfort of passenger in cabin by application of numerical analysis. Also we analyzed the effect of the wind speed induced by train in tunnel that is very harmful to the workers on railroad and the effect of the air-pressure fluctuations which get the fatigue to the tunnel lining and the car body.

  • PDF

Study on Asymmetric Settlement Trough induced by the 2nd Tunneling of Twin Shield Tunnels in Clay (점토지반 병설쉴드터널에서 후행터널 굴착에 의한 비대칭 침하형상 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.10
    • /
    • pp.55-63
    • /
    • 2021
  • The construction of shield tunnels is being expanded from the small-bore tunnels such as power, telecommunications, water supply, and sewerage pipes to the large bore tunnels such as road and railway tunnels with the advancement of the shield TBM (Tunnel Boring Machine) manufacturing technology. Accordingly, the construction of twin shield tunnels is increasing. Peck (1969) reported that the surface settlement trough is well described by a Gaussian distribution on a single shield tunnel. Hereafter, many studies about the surface settlement trough were performed by the field measurement, laboratory model test, and numerical analysis. This study confirmed that the additional surface settlement trough induced by the 2nd tunneling were well described by using each Gaussian curve for the right and left sides of the settlement trough.

Development of Tunnel-Environment Monitoring System and Its Installation I -Monitoring System and Measurement in Subway Tunnel- (터널 환경측정 시스템 개발 및 측정 I -개발 시스템 및 지하철터널 측정-)

  • Park, Won-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8608-8615
    • /
    • 2015
  • We developed a system that can collect and transmit real-time environmental data such as temperature, humidity, wind direction, and wind speed, and equipment performing aging tests on fire detectors. This system was installed in three representative sites of railway tunnels in South Korea such as Gumjung, Solan, Seoul Subway Line 4 tunnels. The systems showed a stable performance and collected environmental data for over a year. We analyzed environmental data collected by two of our developed systems installed in the running tunnels of Gwacheon Line of Seoul Subway Line 4. The developed system was capable of safely analyzing tunnel environments for 24 h straight using a wireless communication network, and has potential for use in a variety of fields other than tunnels.

The impact of EPB pressure on surface settlement and face displacement in intersection of triple tunnels at Mashhad metro

  • Eskandari, Fatemeh;Goharrizi, Kamran Goshtasbi;Hooti, Amir
    • Geomechanics and Engineering
    • /
    • v.15 no.2
    • /
    • pp.769-774
    • /
    • 2018
  • The growth of cities requires the construction of new tunnels close to the existing ones. Prediction and control of ground movement around the tunnel are important especially in urban area. The ground respond due to EPB (Earth Pressure Balance) pressure are investigated using the finite element method by ABAQUS in intersection of the triplet tunnels (Line 2, 3 and 4) of Mashhad Urban Railway in Iran. Special attention is paid to the effect of EPB pressure on the tunnel face displacement. The results of the analysis show that in EPB tunneling, surface settlement and face displacement is related to EPB pressure. Moreover, it is found that tunnel construction sequence is a great effect in face displacement value. For this study, this value in Line 4 where is excavated after line 3, is smaller than that line. In addition, the trend of the displacement curves are changed with the depth for all lines where is located in above and below, close to and above the centerline tunnel face for Line 2, 3 and 4, respectively. It is concluded that: (i) the surface settlement decreases with increasing EPB pressure on the tunnel face; (ii) at a constant EPB pressure, the tunnel face displacement values increase with depth. In addition, this is depended on the tunneling sequence; (iii) the trend of the displacement curves change with the depth.

Stress and strain state in the segmental linings during mechanized tunnelling

  • Do, Ngoc-Anh;Oreste, Pierpaolo;Dias, Daniel;Antonello, Croce;Djeran-Maigre, Irini;Livio, Locatelli
    • Geomechanics and Engineering
    • /
    • v.7 no.1
    • /
    • pp.75-85
    • /
    • 2014
  • The application of the mechanized tunnelling has been extended in recent years. There are at present different approaches that are used in the design of segmental tunnel linings supported in mechanized tunnels. Even though segmental lining is utilized for mechanized tunnels, its behaviour is still quite unclear under in situ stress and there is a lack of data regarding the distribution of stresses inside segmental linings. So far no single effective calculation method exists for segmental lining design. The lack of clear solutions makes the use of segmental lining to be more expensive due to the adoption of greater safety factors. Therefore, a particular attention must be given in order to obtain data from monitored tunnels which permits to validate design methods. In this study, strain measurements, which were conducted during the construction of twin tunnels in the Bologna-Florence railway line, have been presented. The behaviour of segmental lining during the excavation and the influence of a new tunnel excavation on an existing tunnel have been shown through the measured data. The data are then compared with the results obtained with Einstein and Schwartz's method and Duddeck and Erdmann's method, which permits to highlight the fact that the two analytical methods underestimate structural forces induced in the segmental lining and then must be used with caution.

Deformation characteristics of tunnel bottom after construction under geological conditions of long-term deformation

  • Kim, Nag-Young;Park, Du-Hee;Jung, Hyuk-Sang;Kim, Myoung-Il
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.171-178
    • /
    • 2020
  • Mountainous areas cover more than 70% of Korea. With the rapid increase in tunnel construction, tunnel-collapse incidents and excessive deformation are occurring more frequently. In addition, longer tunnel structures are being constructed, and geologically weaker ground conditions are increasingly being encountered during the construction process. Tunnels constructed under weak ground conditions exhibit long-term deformation behavior that leads to tunnel instability. This study analyzes the behavior of the bottom region of tunnels under geological conditions of long-term deformation. Long-term deformation causes various types of damage, such as cracks and ridges in the packing part of tunnels, as well as cracks and upheavals in the pavement of tunnels. We observed rapid tunnel over-displacement due to the squeezing of a fault rupture zone after the inflow of a large amount of groundwater. Excessive increments in the support member strength resulted in damage to the support and tunnel bottom. In addition, upward infiltration pressure on the tunnel road was found to cause severe pavement damage. Furthermore, smectite (a highly expandable mineral), chlorite, illite, and hematite, were also observed. Soil samples and rock samples containing clay minerals were found to have greater expansibility than general soil samples. Considering these findings, countermeasures against the deformation of tunnel bottoms are required.

Deformation analyses during subway shield excavation considering stiffness influences of underground structures

  • Zhang, Zhi-guo;Zhao, Qi-hua;Zhang, Meng-xi
    • Geomechanics and Engineering
    • /
    • v.11 no.1
    • /
    • pp.117-139
    • /
    • 2016
  • Previous studies for soil movements induced by tunneling have primarily focused on the free soil displacements. However, the stiffness of existing structures is expected to alter tunneling-induced ground movements, the sheltering influences for underground structures should be included. Furthermore, minimal attention has been given to the settings for the shield machine's operation parameters during the process of tunnels crossing above and below existing tunnels. Based on the Shanghai railway project, the soil movements induced by an earth pressure balance (EPB) shield considering the sheltering effects of existing tunnels are presented by the simplified theoretical method, the three-dimensional finite element (3D FE) simulation method, and the in-situ monitoring method. The deformation prediction of existing tunnels during complex traversing process is also presented. In addition, the deformation controlling safety measurements are carried out simultaneously to obtain the settings for the shield propulsion parameters, including earth pressure for cutting open, synchronized grouting, propulsion speed, and cutter head torque. It appears that the sheltering effects of underground structures have a great influence on ground movements caused by tunneling. The error obtained by the previous simplified methods based on the free soil displacements cannot be dismissed when encountering many existing structures.