Proceedings of the Korean Society for Rock Mechanics Conference
/
2008.10a
/
pp.33-41
/
2008
The longest tunnel has been halted at Daekwanryung by the failure of the host country of the Winter Olympiad in 2014, but modern High-Power TBM will come to Korea to excavate these long tunnels to establish the better horizontal connection between the western and eastern countries to improve the strong powerful logistic strategy of Korean peninsula. Train operation provides a key function of air movements in a long underground tunnel, and heat generation from transit vehicles may account of the most heat release to the ventilation and emergency systems. This paper indicates the optimal fire suppress services and safety provision for the long railway tunnel which is designed twin tunnel with length 22km in Gangwon province of Korea. The design of the fire-fighting systems and emergency were prepared by the operation of the famous long-railway tunnels as well as the severe lessons from the real fires in domestic and overseas experiences. Designers should concentrate the optimal solution for passenger's safety at the emergency state when tunnel fires, train crush accidents, derailment, and etc. The optimal fire-extinguishing facilities for long railway tunnels are presented for better safety of the comfortable operation in this hard rock tunnel of eastern mountains side of Korea. Since year 1900, hard rock tunnel construction has been launched for railway tunnels in Korea, tunnels have been built for various purposes not only for infrastructure tunnels including roadway, railway, subway, and but also for water and power supply, for deposit food, waste, and oils etc. Most favorable railway tunnel system was discussed in details; twin tunnels, distance of cross passage, ventilation systems, for the comfortable train operations in the future.
Park, Byung-Eun;Lee, Jong-Ill;Nam, Myong-Sik;Kim, Dong-Gi;Kim, Sun-Hong
Proceedings of the KSR Conference
/
2005.05a
/
pp.633-639
/
2005
We studied three dimension numerical analysis in the case that a train stops in tunnels by fire. And the 'Fluent 6.1' which is CFD(Computational Fluid Dynamics) program was used in this study. We compare the smog diffusion in single/double track ordinary railway tunnels with that in double track high speed railway tunnels in this study.
Kim Dong Gi;Park Byung Eun;Rha Sang Ju;Park Jong Kwaun
Proceedings of the KSR Conference
/
2004.10a
/
pp.880-885
/
2004
When a fire takes place, the escape tunnel which could prevent passengers and the crew from disasters would be most important facility among railway tunnel facilities for prevention of disaster. A shorter space between the escape tunnels is much better for safety because of short escape time. The establishment of short space escape tunnels(driftways) in the single track parallel tunnel is much easier. The establishment of long space escape tunnels(inclined shafts, vertical shafts) in the double track is much more advantageous economically. We, therefore, compared the movement time of smog originated from fire with the escape time of the crew and passengers for setting up the best space between the escape tunnels in the double track tunnel. We could calculate the best space between the escape tunnels in the double track tunnel properly by computer simulation.
The efficiency and performance of electric facilities in electric railway tunnels are quite important factors for operation and maintenance of railway since most of maintenance works for railways are doing during the night. Specially, in the railways like Gyeong-Chun Line passing through many mountains, many parts of railways are constructed with tunnels. So, this paper proposes the efficient electrical installation design scheme for railway tunnel considering the system performance, economics, and the reliability of power supply to tunnel electric facilities. Finally, the proposed design scheme is implemented to the tunnel design for Gyeong-Chun Line (Electric Railway).
Purpose: The objective of this study was to improve smart monitoring and monitoring management technology in long tunnels by investigating and analyzing the normal operation rates of monitoring hardware in the long tunnels of high-speed and urban railways. Method: This study evaluated, analyzed, and compared the normal operation rate of 6-8 types of monitoring hardware for each long tunnel, targeting three high-speed railway lines with a long tunnel (i.e., Suseo-Pyeongtaek Line, Gyeongbu Line, and Honam Line) and two urban railway groups with a long tunnel (i.e., Seoul Metro Lines 5, 6, and 7, and 9). Result: The rank of the normal operation rate of monitoring hardware was in the order of Suseo-Pyeongtaek High-Speed Railway (92.1%), Seoul Metro Lines 5, 6, and 7 (85.8%), Seoul Metro Line 9 (85.2%), Gyeongbu High-speed Railway (80.5%), and Honam High-speed Railway (46.7%). Conclusion: The mean normal operation rate of the monitoring hardware in the three high-speed railway long tunnels was 83.4%, and that of the two urban railway long tunnels was 85.5%, indicating that the deviation between them was small. The mean normal operation rate of the monitoring hardware in the long tunnels of the five high-speed and urban railway lines was 84.2%.
Park, Byung-Eun;Lee, Jong-Ill;Kim, Sung-Yong;Kim, Dong-Gi;Kim, Si-Kyeok
Proceedings of the KSR Conference
/
2004.06a
/
pp.165-170
/
2004
As industry develop rapidly, a possibility of railway-disasters (fire), are growing in consideration of speedy railway and increasing long tunnels. In Korea, KTX consists $46\%$ of tunnels constructed since early 1990, prescribed prevention disasters standard, taking into account that the train accident occurred. On this provision which refers other country's a high-speed railway fire safety regulation and is synthetically reflected topographical circumstance and tunnel size in Korea, in order to minimizing valuable casuality and securing safety operation of train from rapid evacuation and rescue a passenger from accident in tunnel.
Journal of the Korea institute for structural maintenance and inspection
/
v.14
no.3
/
pp.196-200
/
2010
The number of railway tunnels has been increasing rapidly. Although fires in long railway tunnels are rare, the consequences can be devastating. Prior to this study, there were no adequate time-temperature curves for the fire safety assessment of Korean railway tunnels. We studied a standard foreign time-temperature curve for which the heat rate is based on the traffic and the types of vehicles. We then proposed a hydrocarbon curve as a fire design model for railway tunnels in Korea. We examined the implications of this proposed model on railway tunnel structures using numerical analysis.
The power plant is a major infrastructure composed of essential machinery such as Turbine Generators (TG), Heat Recovery Steam Generators (HRSG), etc. Particularly, Combined Heat & Power Plants (CHP) are highly efficient power plants that simultaneously produce heat and electricity. Recently, cases have emerged where railway tunnels are being constructed beneath such power plants due to the underground development of urban rail transportation. Therefore, there is a pressing need to assess the impact of vibrations induced by blasting excavation during the construction of railway tunnels beneath the power plant, as well as the vibrations during railway operation, on the major machinery foundations and structures within the power plant. In this study, criteria for evaluating the vibration impact on key vibration-sensitive structures are summarized, and evaluation standards based on international criteria are established. Based on this, the study examines the vibration impact during the blasting excavation method of NATM tunnels beneath the operational power plant. Furthermore, subsequent railway operation, specifically focusing on the impact of train vibrations on Turbine foundations, Pump foundations, and District Heating pipelines using 3D dynamic numerical analysis. The results indicate that vibration values corresponding to up to 97.3% of the evaluation criteria are derived based on the numerical analysis. However, considering the significance of power plant-related structures, additional measures to reduce vibrations are proposed, including further test blasting, alteration of blasting patterns, reducing the charge per delay, or decreasing advance.
Kim, Dong-Jin;Moon, Dae-Seop;Moon, Seong-Am;Hwang, Young-Ha
Journal of the Korean Society for Railway
/
v.10
no.1
s.38
/
pp.16-21
/
2007
Along with the opening of the high speed railroad in 2004, the number of long tunnels constructed is increasing and will be continued. In this respect, the fro inside the tunnels is a main cause of drastic damages to both facilities and lives of passengers on board, especially more severe consequences are expected if the fire occurs on a train in urban area. Even though, the threat to human lives due to the increasing number of tong tunnels and increasing train operation times inside such tunnels is getting bigger, the studies to measure safety of the tunnel and to enhance the safety of passengers have not been carried out enough in Korea. Therefore, in this paper, we will use the probabilistic method to predict the average number of deaths of passengers in case of fire on a train iii tunnel, and show the potential risk to passengers which can be a guide for safer design of tunnels to be constructed.
Transactions of the Korean Society of Mechanical Engineers B
/
v.21
no.10
/
pp.1294-1302
/
1997
For the purpose of investigating the impulsive noise at the exit of high-speed railway tunnel and the pressure transients inside the tunnel, experiments were carried out using a shock tube with an open end. A great deal of experimental data were obtained and explored to analyze the peak pressures and maximum pressure gradients in the pressure waves. The effects of the distance and cross-sectional area ratio between two-continuous tunnels on the characteristics of the pressure waves were investigated. The peak pressure inside the second tunnel decreases for the distance and cross-sectional area ratio between two tunnels to increase. Also the peak pressure and maximum pressure gradient of the pressure wave inside the second tunnel increase as the maximum pressure gradient of initial compression wave increases.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.