• Title/Summary/Keyword: railway test line

Search Result 389, Processing Time 0.031 seconds

A Study on Deicing Current Estimation Technique and Configuration Process for Deicing System in the Conventional Line (기존선 해빙시스템을 위한 해빙전류 예측기법 및 구성 절차에 관한 연구)

  • Kwon, Sam-Young;Park, Young;Jung, Ho-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.237-243
    • /
    • 2006
  • Deicing system is to melt frost or ice freezed in catenary line when the temperature is lower than $0^{\circ}C$ in winter. The principle of deicing system is to melt frost or ice by Joule heat of catenary impedance. The performance of deicing is dependant of deicing current determined by the length of deicing section, deicing impedance and current division ratio of catenary line and messenger line. So, we present technique for estimating deicing current and process for determination of deicing section in the conventional line. Deicing impedance is estimated using Carson-Pollaczek equation, and current division ratio of catenary line and messenger line is estimated using voltage drop, and deicing current is estimated using power system data of deicing system. For the determination of the final deicing section, we verified estimated value comparing with experiment value of deicing impedance and current division ratio of catenary line and messenger line using low voltage experiment. Finally, we verified the validity of estimation technique and process using a simulated test data of real deicing system operation in the Chungju Substation, Chungbuk line.

A Evaluation of Maintenance History for K-AGT (한국형 경량전철시스템의 유지보수 이력에 대한 평가)

  • Lee, Ho-Yong;Ryu, Sang-Hwan;Cho, Hong-Shik;Cho, Bong-Kwan;Jang, Yul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1014-1023
    • /
    • 2008
  • The K-AGT test line is managed similarly to revenue operation and operated automatically 120km per day, total 90,000km from August 2004 to December 2007. To enhance reliability of developed system, maintenance information system based on RCM is applied. The maintenance program applied in test line is based on RCM which prevent a fault before it happens and a fault made in test line is analysed by reliability growth test. Vehicle system, power supply system, signalling system, track and infrastructure are built in test line and it is reviewed enhancing system performance and changing designs to commercialize through reliability growth analysis method.

  • PDF

Status and Characteristics of High Speed Railway Noise (고속철도소음 현황과 특성)

  • 이재원;박준철
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.14 no.11
    • /
    • pp.1161-1165
    • /
    • 2004
  • Railway noise Is one of the main causes of environmental impact. Whenever a new railway line is planned or a housing project near an existing railway is proposed, an estimate of the relevant noise levels is usually required. For this, it is necessary to quantify those parameters that affect the railway noise. Therefore we investigated the noise level which 107 high speed trains generated passing through the block of test railway track between Chunan and Chungwon. This paper shows the status and characteristics of the high speed rallway noise and an accurate prediction of the high speed railway noise.

Characteristics of High Speed Railway Noise (고속철도소음 특성)

  • 강대준;이덕길;장성기;서충열;박준철;김용찬;홍준기
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.935-941
    • /
    • 2002
  • Railway noise is one of the main causes of environmental impact. Whenever a new railway line is planned or a housing project near an existing railway is proposed, an estimate of the relevant levels is usually required. For this, it is necessary to quantify those parameters that affect the railway noise. Therefore we investigated the noise and vibration level which 107 high speed trains generated passing through the block of test railway track between Chunan and Chungwon. This paper presents the status and characteristics of the high speed railway noise and an accurate prediction of the high speed railway noise.

  • PDF

Radio coverage prediction of RF-CBTC system under transmission power 10mW/MHz at K-AGT test line (경전철시험선에서 송신전력 10mW/MHz에 대한 열차제어용 무선시스템의 전파도달범위 예측)

  • Cho, Bong-Kwan;Jung, Jae-Il
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.589-595
    • /
    • 2007
  • Korea Railroad Research Institute has developed the driverless rubber-tired K-AGT (Korean-Automated Guideway Transit) system from 1999 to 2005 and has done its performance and reliability tests on the test line at Gyeongsan-city. Radio Frequency Communication-Based Train Control system of K-AGT, which employed Advanced Automated Train Control scheme, detects train position using the radio propagation delay between wayside and vehicle radio equipment. In this paper, we investigate whether the transmission power of radio system can be reduced to the permitted level announced by the Ministry of Information and Communication for license-free ISM(Industrial Scientific Medical) frequency bands. We first determine radio propagation model, using the measured data at test line, and perform simulation for radio coverage prediction. From the simulation results, we identify that the radio system operated with reduced power can provide good link quality in total test line.

Experimental Study for Establishing Rail Grinding Period in the Urban Railway (도시철도 레일연마주기 산정을 위한 시험적 연구)

  • Sung, Deok-Yong;Go, Dong-Chun;Park, Yong-Gul;Kong, Sun-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.4
    • /
    • pp.447-454
    • /
    • 2010
  • The defects of rail head induced by fatigue and deterioration are mainly classified by two types ; one occurred on the surface of rail head the another occurred on the inner rail head. This study performed the surface irregularity measurement of rail head according to the passing tonnage in the urban railway. Also, we carried out microscopic structure test, chemical component test and micro-hardness test for the specimen which is the used rail on metro line by accumulated passing tonnage. As a result of this study, for new rail, it should be performed initial grinding in order to remove 0.3mm of de-carbonized layer. The preventive-cyclic grinding for preventing RCF defects is proposed two options : grinding by the whole line and grinding by specified sections.

Static load test of the bogie and vibration performance test, dynamic characteristics analysis of the bulk cement car (벌크시멘트화차의 대차 하중시험과 진동성능시험 및 동특성 해석 연구)

  • 홍재성;함영삼;백영남
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.3
    • /
    • pp.186-193
    • /
    • 2003
  • The object of this study is to ensure the stability of bulk cement cars conducting vibration performance test, dynamic characteristic analysis and static load test of bogie frame. In case of static load test, bogie static load test facility was used. In case of dynamic characteristic analysis, Vampire Software was used. In case of vibration performance test, real bulk cement cars were used in kyeung-bu line. In the results of static load test of bogie frame for bulk cement car, all structures satisfied allowable stress criteria of materials. The vibration performance test and dynamic characteristic analysis results satisfied allowable standards.

Aerodynamic effects of subgrade-tunnel transition on high-speed railway by wind tunnel tests

  • Zhang, Jingyu;Zhang, Mingjin;Li, Yongle;Fang, Chen
    • Wind and Structures
    • /
    • v.28 no.4
    • /
    • pp.203-213
    • /
    • 2019
  • The topography and geomorphology are complex and changeable in western China, so the railway transition section is common. To investigate the aerodynamic effect of the subgrade-tunnel transition section, including a cutting-tunnel transition section, an embankment-tunnel transition section and two typical scenarios for rail infrastructures, is selected as research objects. In this paper, models of standard cutting, embankment and CRH2 high-speed train with the scale of 1:20 were established in wind tunnel tests. The wind speed profiles above the railway and the aerodynamic forces of the vehicles at different positions along the railway were measured by using Cobra probe and dynamometric balance respectively. The test results show: The influence range of cutting-tunnel transition section is larger than that of the embankment-tunnel transition section, and the maximum impact height exceeds 320mm (corresponding to 6.4m in full scale). The wind speed profile at the railway junction is greatly affected by the tunnel. Under the condition of the double track, the side force coefficient on the leeward side is negative. For embankment-tunnel transition section, the lift force coefficient of the vehicle is positive which is unsafe for operation when the vehicle is at the railway line junction.

Durability Evaluation and Train Test of Air Spring for Electric Railway (전동차용 공기스프링 내구성평가 및 실차시험)

  • 김완두;우창수;이학주;정승일;김석원;김영구;최경진;이동형
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.468-475
    • /
    • 2000
  • An air spring was accepted for rail vehicle secondary suspension to reduce and absorb tile vibration and the noise. The air spring for the electric railway was developed with domestic technology, which consisted of a cord reinforced rubber bellows, a upper plate, a lower plate and a stopper rubber spring The fatigue test was conducted in laboratory by using servo hydraulic fatigue testing system to verify the durability. And to guarantee the adaptation of this air spring, the ride comfort and the air pressure variation were measured in train test on Boondang line.

  • PDF

A Experimental study on the Bridge Response of AGT System by Guiderail Prominence (AGT 시스템 안내레일 요철에 의한 교량 응답에 관한 실험적 연구)

  • Kang, Sung-Won;Han, Sang-Chul;Lee, An-Ho;Jung, In-Keun
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.453-457
    • /
    • 2007
  • AGT system is a kind of light railway train. AGT system use of concrete track and rubber tire, so it can be reduce the noise and vibration, compare to the normal train system. And, the dynamic responses of normal bridge are influenced by the dynamic characteristics of bridge, the speed of vehicle and the surface roughness of railway. But the AGT system bridge is influenced not only the above facts but also the guiderail unevenness, because, AGT vehicle steered by guiderail. So, in this study, optimized service condition is suggested for the design and operation of AGT system, by the means of experimental study. The experiments are executed for PSC bridge with length of 30m, at the AGT test line in Kyongsan. The test results are compared and investigated according to the prominence. In the test result, the guiderail prominence influenced on the dynamic response of bridge. It shows a increase as compared with no guiderail prominence in the dynamic response value acceleration, displacement, stain.

  • PDF