This paper describes the development of integrated simulator with GUI(Graphic User Interface) for traction power supply system. This simulator consists of a lot of calculation modules such as TPS, train time schedule, line constant, and power supply system analysis. Each module has input and output structure respectively. The algorithms of all modules have confirmed the validity to comparison with field test that is performed on both high speed railway line and conventional line.
This paper describes the result of carbody and vibration test for freight car. The purpose of the test is to evaluate an safety which carbody structure shall be considered fully sufficient rigidity so as to load a freight car under maximum load and operating condition on line track. The test carbody is constructed by RS korea co., LTD. in accordance with KNR specification. The test cases of the carbody is tested the vertical load and compressive load to verify the strength and stiffness. The vibration test is tested for analysis and evaluation of vibration, to allow for the fact that mechanical vibration in railway vehicles have specific characteristics.
DC urban railway power system consists of DC power network and AC power network. The DC power network supplies electric power to railway vehicles and the AC power network supplies electric power to station electric equipment. Recently, because of power consumption reduction and peak load shaving, intelligent measurement of regenerative energy and renewable energy adapted on DC urban railway is required. For this reason, DC smart metering system for DC power network shall be developed. Therefore, in this paper, DC voltage sensor, current sensor, and DC smart meter were developed and evaluated by performance test. DC voltage sensor was developed for measuring standard voltage range of DC urban railway, and DC current sensor was developed as hall effect split core type in order to install in existing system. DC smart meter possesses function of general intelligent electric power meter, such as measuring electricity and wireless communication etc. And, DC voltage sensor showed average 0.17% of measuring error for 2,000V/50mA, and current sensor showed average 0.21% of measuring error for ${\pm}2,000V/{\pm}4V$ in performance test. Also DC smart meter showed maximum 0.92% of measuring error for output of voltage sensor and current sensor. In similar environment for real DC power network, measuring error rate was under 0.5%. In conclusion, accuracy of DC smart metering system was confirmed by performance test, and more detailed performance will be verified by further real operation DC urban railway line test.
Korean High Speed Train (KHST) has been tested on high speed line in JungBu site since it was developed in 2002. The data acquisition system was developed to accomplish successfully this on-line test for proving the dynamic Performance of KHST. This system was consist of the personal computers based on National Instrument PXI modules and the test programs based on Labview 6i. This paper shows that this system is efficient to acquire the test data through the multi-channels connected the accelerometers which located in long distance places and flexible to change and add channels for data acquisition. The dynamic analysis of an on-line test is very complicate because the environmental conditions, as examples radius of curve, inclination of the track, tunnels, bridges, and so forth, and running conditions, as examples driving, braking, the number of working motors, and so forth, have an effect on the results. Therefor, the analysis method is important and this paper proposes the efficient procedure graphically, showing the proposed method simplify the accelerations of 5th bogie frame acquired during the on-line test for KHST.
본 연구는 철도전용 통합무선망 개발을 위한 LTE 통신 방식의 적용타당성 연구를 목적으로 하며, 호남선 일로역에서 대불역 사이 약 12km 구간에 걸쳐 철도전용 통합무선망을 구축하여 실증 분석하였다. 한국의 철도 안전 무선통신은 노선 별로 방식이 상이하여 각 철도 종사자간 협업이 어려워 다양한 문제점이 발생하고 있으며 무선통신 시스템간 통화 단절 및 상용 무선망과의 주파수 간섭 및 혼신에 따른 사고 발생 위험이 상존하고 있다. 본 연구는 이러한 문제를 해결하기 위한 방법으로 대두되고 있는 철도전용 통합무선망에 4세대 통신방식인 LTE를 적용하는 것이 타당한지를 살펴보았다. 열차 선로라는 기지국 설치 위치의 제약이 있었음에도 모든 시험 항목에서 기존 유럽의 GSM-R의 성능 기준을 상회하는 결과를 보였다.
Recently in worldwide and Korea domestically, the LRT vehicles are introduced as reputable urban transit system, in a view of energy saving, punctuality and eco-friendly as well as transport efficiency. At first time in Korea, the Busan metro Line 4 was applied with AGT system which is a kind of LRT using the Rubber tired AGT vehicle and developed from 1999 to 2004 in charge of Korean government. Busan selected the AGT system for Metro Line 4 as the solution of traffic jam and networking the intercity. At present, Busan Metro Line 4 has been running since opened at March 30, 2011. The vehicle of Busan metro line 4 is aiming the maximization of LRT vehicle advantage that is the lightness of vehicle size and vehicle weight. So, it did size downed and weight downed by lightened the weight of car frame and bogies and by the compactness of electrical on-board equipments. The study carried out the structure analysis to verify and safety and performance of car body and bogie frame of Busan Metro Line 4 vehicles. In this study, it was analyzed the stress of main load and verified the fatigue strength. And measured the dynamic stress sending to body structure and bogie frame while running on main line and analyzed the fatigue stress. As a result, it verified the safety and life cycle of car body and bogie frame.
본 연구에서는 교통카드자료를 기반으로 한 김경민 외[1]의 승객경로추적 방법을 이용하여 서울지하철 9호선 2단계 개통에 따른 급행열차 선택에 대한 변화를 분석하였다. 분석결과 2단계 개통 전과 비교하였을 때, 1단계 구간 기존 승객들의 급행열차 선택 비율은 변하지 않음을 확인하였다. 개통 전 후로 나누어 각각에 대한 다항로짓모형을 개발하였고 개통 전 후 모형의 전이성을 확인하였다. 하지만, 급행열차에 대한 선택이 높은 장거리 승객의 증가로 인해 2단계 개통 후 급행열차의 혼잡도가 약 6.7% 상승하였고 일반열차와의 혼잡도 차이는 증가하였다.
This paper describes the result of endurance test on the Sangju test track. The purpose of the test is to prove the endurance of the Korean EMU for the commercial operation. Test conditions are more severe than actual operation on the commercial line. As of October, test result is good without severe problems. After 100,000km of test operation, the EMU will be delivered to operation cooperation for th commercial operation.
For the Korean high speed railway rolling stock, which is developed through the G7 research project, various tests such as components test, prototype train test, on-line test have been carried out for years. In order to obtain the system stability, mutual interface between each part (rolling stock, track, bridge, electricity and signal) should be verified. For this reason, track performance according to the speed increase of HSR has been monitored in field. Especially, through the analyses of accumulated data, structural and running stability of HSR has been evaluated. With this viewpoint, this paper presents the track performance test method and the test results corresponding to 350km/h speed increase of HSR.
The purpose of interlocking system was to prevent the route for a train being set up and its protecting signal cleared if there was already another, conflicting route set up and the protecting signal for that route cleared. This paper proposed Interlocking Inspection System(IIS) consisting of interlocking simulator and field simulator to operate interlocking test of computer based Electronic Interlocking System(EIS) in this paper. Interlocking simulator consists of Design Edit System(DES), Logical Database Management Tool(LDMT) and real-time confirming system, field simulator is a equipment to simulate a control object of EIS and constitutes configuration operated in 19 inch standard rack. As a result of test to prove capacity of this IIS, the efficiency was shown as excellent. Therefore by using inspection system, we obtain every advantages. It has the functions for test data generation and automatic test execution based on personal computer. Time and cost for test work can be reduced more efficiently by using this developed inspection system
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.