• Title/Summary/Keyword: railway signaling systems

Search Result 115, Processing Time 0.024 seconds

A Study on the System-level Test and Evaluation for the CBTC System (CBTC 시스템에 대한 시스템 수준의 시험평가 방안 연구)

  • Lee, Young-Hoon;Lee, Jae-Chon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.12
    • /
    • pp.115-121
    • /
    • 2008
  • The communication-based train control (CBTC) technology is a kind of railway signaling technologies and is to control the train operation through communication. A project adopting the CBTC technology is in progress and its object is to develop interoperable and interchangeable subsystems. Thus the purpose of this paper is on how to develop the required subsystems and integrate them successfully without sufficient design information at the system level. Accordingly this project shall require the integration and test at the system level. In order to do so, a top-level system specification shall be needed, which is not available in the current phase of the project. The main objective of the test and evaluation activities is to see whether the developed system meets the system specification. In this paper, we describe how the test and evaluation can be carried out based on the subsystems design specifications, considering the system architecture and the operation concept of the existing system as well.

Analysis of EMI Between Overlapped Railway Signalling Systems and Its Countermeasure (철도신호시스템 중첩운영으로 인한 전자파장해현상 분석 및 대책)

  • Kho, Young-Hwan;Yoon, Sun-Ho;Choi, Kyu-Hyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.6
    • /
    • pp.1116-1122
    • /
    • 2009
  • ATS(Automatic Train Stop) system makes train stop when it runs over the speed limit and ensure the safe operation of train. Seoul Metro line 2 in Korea, which started its passenger service in 1982, has adopted ATS system for its signaling system. The ATS system has only a train stop function at the time of emergency, and Seoul Metro is planning to replaced them with ATC(Automatic Train Control)/ATO(Automatic Train Operation) system which can provide the dedicated speed control for headway reduction and automatic operation of train. Until all the ATS system is replaced with the new ATC system, both systems are to operate simultaneously at the same metro line. In this situation, ATS system sometimes reveals improper operation: train stops suddenly without any obstacles in front of it. These emergency stops cause interruption of passenger service, and abnormal abrasion of wheels and rail. This paper makes it clear that these interruptions are caused by EMI phenomena between ATS on-board device and ATC wayside device : Signal current flowing in AF track circuit of ATC is turn out to be a EMI source that prevent normal operation of the ATS on-board device. Although the two systems have different frequency-ranges (ATS system has frequency range between $78{\sim}130$[kHz] and ATC system has frequency range between $9.5{\sim}16.5$[kHz]), it turned out that EMI phenomena appears between the both systems. This is investigated by measuring the output signal from ATS on-board device passing over ATC wayside device. The FFT(Fast Fourier Transform) analysis of the signal reveals that AF track circuit signal is transmitted to the ATS on-board device and induce noise causing improper operation. The countermeasures to the EMI phenomena are examined in three ways; blocking EMI transmission, enforcement of EMS (Electromagnetic Susceptibility) of ATS on-board device, and blocking the EMI source. It is suggested that the practical solution be blocking EMI source temporarily, that is breaking AF track circuit signal when the trains with ATS on-board device pass over it. To this purpose, TODS(Train Occupation Detection System) is developed, and has made a success in preventing the EMI problem of Seoul Metro line 2.

Effect Analysis of Classical Line TI-21 type Audio Frequency Track Circuit from KTX Sancheon Return Current Harmonics (KTX산천 귀선전류고조파가 일반선 TI-21형 AF궤도회로에 미치는 영향분석)

  • Choi, Jae Sik;Kim, Hie Sik;Park, Ju Hun;Kim, Bun Gon
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.1
    • /
    • pp.38-45
    • /
    • 2016
  • The power transformation system of High Speed rolling stocks like KTX-Sancheon has shown excellent control capacities in the areas of riding comfortability, switching efficiency, safety and energy consumption due to technical developments in power-electronics, high speed & large scale integrated semiconductors and microprocessors. However, harmonics from IGBT, a high speed switching device used in the Convertor & Invertor equipment of rolling stocks have given rise to various problems in transformer substations, signaling systems, data transmission systems and facility monitoring systems. Especially, TI21 non-insulated track circuits have malfunctioned due to the influence of returning current harmonics which were generated at around of integer times of the number of power transformation equipment in the frequency domain. This paper, measures and analyzes various schemes to analyze the traveling path of the returning current harmonics generated due to the relationship between the rolling stocks and track circuits on site. Ultimately, theseschemes will be used to design high speed rolling stocks, AF track circuits and a common grounding network.

System Improvement Research for Commercial Propulsion about Government R&D Product(In Case of LRT) (국가 R&D 성과품 상용화 추진을 위한 제도개선방안 연구 (경량전철을 중심으로))

  • Hong, Jai-Sung;Park, Kwang-Bok;Rhy, Sang-Whan;Lee, An-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.322-330
    • /
    • 2009
  • Traffic congestions in local cities have been getting worse since 1990s, so many local governments have considered the introduction of an LRT system. So far, there is no city operating the LRT due to social environments, financial reasons, feasibility and so on. But still many cities have examined LRT or started the construction. Until now, more than 30 cities are constructing LRT or planning the introduction of LRT and it becomes 96 routes, approximately 700km. With the support of MLTM, KRRI has developed automatic LRT system with rubber-wheels, K-AGT as a result of "LRT system technology development project" from 1999 to 2005 by investing 50.32 billion wons(the public 37, the private 13.32) and finished running durability test of 100,000km at Kyeong-san test line. Currently, two trains, coupled two cars respectively have running and signaling tested. K-AGT was appointed to supply for an extension line at Busan Subway Line 3(Minam-Anpyeong section) with 17 trains(six-unit car) 102 cars. However, except for Minam-Anpyeong section, other cities such as Uijeongbu, Yongin, Daegu(Line 3) and Kwangmyeong decided to use the foreign systems, not to use the product, a result of national R&D project. This results in a huge waste of foreign currency and it is expected to require much additional cost for maintenance. If local governments use the products of national R&D projects, many national benefits such as reducing imports and protecting home industries could be expected, therefore in this paper, some plans to encourage to use products of national R&D projects were dealt with.

  • PDF

Characteristics of Curved Track Behaviors according to Traveling Tilting Train (틸팅차량 주행에 따른 기존선 곡선 궤도의 거동 특성)

  • Park, Yong-Gul;Choi, Jung-Youl;Sung, Deok-Yong;Chun, Dae-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.692-700
    • /
    • 2007
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the curve section, which is vulnerable to accelerated train speed. The analysis of tilting train test running the part of Chungbuk line and Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the movement behavior of each part of track while tilting train, high speed train and traditional train (Mugunghwa and freight train) were running the existing line, wheel load, lateral wheel load, rail bending stress, vertical and lateral displacement of rail and vertical displacement of sleeper were compared and analyzed so as to evaluate the expected impact by tilting train for improving the train speed.