• Title/Summary/Keyword: railroad line

Search Result 652, Processing Time 0.036 seconds

Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line (수서고속철도 전차선로의 설치조건의 따른 집전상태 분석)

  • Na, Kyung-min;Park, Young;Lee, Kiwon;Cho, Yong Hyeon;Kwon, Sam-young;Park, Chulmin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.4
    • /
    • pp.727-732
    • /
    • 2017
  • This paper describes the dynamic characteristics depending on installation condition between a pantograph and an OCL (Overhead Contact Line) on a new high speed line in Korea. The current collection performance between the pantograph and the OCL was tested during train operation from Suseo to Jije stations. The current collection performance is evaluated based on the duration of an arc by using an arcing measurement system. The system consists of an optical sensor for measuring the duration of an arc and a camera for monitoring current collection performance. An arcing duration is defined as a percentage of arcing in international standards. This test aims to analyze the locations of repetitive arcing depending on installation conditions of OCLs on a new high speed line in order to use the result as reference data for correct construction and maintenance.

The study about applying concentric circle to curved line in railroad (복선철도에서 구축과 내$\cdot$외측 궤도의 동심원 선형구성의 필요성 연구)

  • Shin, Tae-Gyun;Chung, Chan-Mun;Kim, Seoung-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.157-162
    • /
    • 2003
  • The curved line in construction of railroad is inevitable. Also it needs a transition curve when the straight line connects to curved line. In this research, by establishing the reciprocal relations of inner, center and outer track, we will present the calculation method of construction-center line in normal double-track railroad which uses cubic parabolic type as a transition curve.

  • PDF

Estimation of Maximum Load Capacity at Interconnection Line of High-Speed and Conventional Line (기존선-고속선 연결선 구간에서 최대부하용량 평가)

  • Lee, Chang-Mu;Lee, Han-Min;Oh, Seo-Chan;Kim, Gil-Dong;Jang, Gil-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1069-1070
    • /
    • 2008
  • At the coupling area linking high speed line and conventional line, according to distance between trains due to speed limit of conventional line, the power load of substation supplying to this conventional line increase. At the coupling area between Kimcheon SS and Kyoungsan SS, train operation have problems caused by instantaneous voltage drop. So, this paper propose evaluation method of maximum load capacity at current normal feeding condition.

  • PDF

Single line Operation in a double line (복선구간의 단선운행 방안 시뮬레이션)

  • Joung, E.J.;Kim, J.K.;Lee, J.H.;Cho, B.K.;Kim, Y.M.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07a
    • /
    • pp.384-386
    • /
    • 1998
  • In the emergency case such as a single line operation in a double line section because of a line broken or train's mal-operation, single line equipments that can operate without a line indication are needed. The main purpose of this study is to verify and analyze the availability of the single line operation that is able to operate without the indication of up or down line, and to offer a realizably alternative method to improve this situation. In order to carry out this study, we concentrated on getting related information. And to adopt the single line operation to existing line, the technology survey of other countries signalling system and the technical analysis of the interior signalling equipment were performed. As a result of this study, the required system and effect of the single line operation system were represented.

  • PDF

A Study on the Headway for PRT System (소형궤도차량 운전시격에 관한 고찰(1))

  • Kim Jong-Ki;Kim Baek-Hyun;Lee Jun-Ho;Lee Duck-Ho;Shin Key-Soe
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.831-835
    • /
    • 2005
  • In a signal control of the railway system, the first objective is to guarantee a safety of the train operation, and the second is to increase a frequency(a capability of the transportation) of the train operation. In order to express the capability of the transportation a terminology what is called a railroad line capacity is employed. The railroad line capacity means a maximum frequency of the train operation in a possible schedule of the one way operation for one day. During the last several years an improvement in the facilities of the train operation (railroad line extension, improvement in the stations, improvement in the signal facilities) has been achieved to increase the railroad line capacity. In this paper the authors deal with the case analysis which try to shorten headway and which has an impartible relation with increasing of the railroad capacity

  • PDF

Modelling AC Electric Railway System using the PSCAD/EMTDC (PSCAD/EMTDC를 이용한 교류 전철급전시스템 모델링)

  • Lee, Han-Min;Chang, Sang-Hoon;Han, Moon-Seob;Kim, Joo-Rak;Oh, Kwang-Hae;Lee, Chang-Mu
    • Proceedings of the KIEE Conference
    • /
    • 2002.04a
    • /
    • pp.260-262
    • /
    • 2002
  • This study presents a AC electric railway system model using PSCAD/EMTDC. Ver.3.08 for circuit analysis and fault studies. This system model made by PSCAD/EMTDC is composed of feeder, contact line, rails, Scott-transformer, Auto-transformer. This model is based on four-port network which is an extension of two-port network theory. In order to verify the proposed model, each voltage of feeder-rail, contact line-rail and feeder-contact line is measured and fault studies are also simulated.

  • PDF

A Study on Developing the Training Program for the Emergency Response against Railroad Emergency Accidents (철도 비상사고 비상대응 훈련 프로르갬 개발에 관한 연구)

  • Park, Min-Kyu;Kim, Si-Gon
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.2
    • /
    • pp.33-40
    • /
    • 2009
  • The Railroad Safety Act was implemented in 2005 due to the increased concerns regarding railroad safety since the Daegu subway fire in 2003. In line with this, the Act became a standard to build the total railroad safety systems which has been overlooked compared to the quantitative growth of the railroad business. The minister of the ministry of Land, Transportation and Maritime Affairs lays down the Act for railroad Companies to conduct emergency programs in response to the emergency occurring on the railroad such as fire, explosion, derailment, etc. By enacting the Safety Act, the nation's construction of the contingency management system for railroad emergency increased", and it made the railroad company prepare the Emergency SOP by establishing 'The guideline on the Establishment of the railroad Emergency Plan' in order to support the efficiency of the Act. In line with this, I would like to analyze a matter of system development and the main function of the "railroad Emergency Training Program" for activation improvement of standardized operation procedure developed through the 'Total capitalize Safety Technology development'.

RC Circuit Parameter Estimation for DC Electric Traction Substation Using Linear Artificial Neural Network Scheme (선형인공신경망을 이용한 직류 전철변전소의 RC 회로정수 추정)

  • Bae, Chang Han;Kim, Young Guk;Park, Chan Kyoung;Kim, Yong Ki;Han, Moon Seob
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.314-323
    • /
    • 2016
  • Overhead line voltage of DC railway traction substations has rising or falling characteristics depending on the acceleration and regenerative braking of the subway train loads. The suppression of this irregular fluctuation of the line voltage gives rise to improved energy efficiency of both the railway substation and the trains. This paper presents parameter estimation schemes using the RC circuit model for an overhead line voltage at a 1500V DC electric railway traction substation. A linear artificial neural network with a back-propagation learning algorithm was trained using the measurement data for an overhead line voltage and four feeder currents. The least square estimation method was configured to implement batch processing of these measurement data. These estimation results have been presented and performance analysis has been achieved through raw data simulation.

A Study on Utilization Plans of Regional trunk rail route -Focused on the Daegu.janghang Line- (지방간선노선의 철도이용과 활성화 방안 -대구.장항선을 중심으로-)

  • Yang, Jun-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.496-504
    • /
    • 2011
  • The region trunk line railroad route undergoes an influence on a large scale in train operation systematic reorganization. This keynote of the train operation not being to the consumer and not to be is because being to the supplier. The trunk line route user of region supply change of the supplier sensitively, accepts but, the demand unit will be able to change the supply massive demanders does not become and like that to accept this back is not the railroad the mean of transportation which grudge is different a mean of transportation mainly makes use. This hits to neither the gist of GLORY promotions of the railroad public corporation which pursues the railroad use which is ordinary even in the basis of governmental policy of stock of coal small green growth and not to be is arranged. For the railroad use activation of the region trunk line route consequently and to excavate the demand hindrance element and a demand lure element the inside and the outside defines and to observe the fluctuation of use importing in existing train operation systematic fluctuation, with the user tries analyzes the instance of the overseas railroad enterprise about the process which reflects the opinion of the area and improvement under preparing boil.

  • PDF

Examination on the variation of ride comfort for korean high speed train through on-line test (시운전 시험을 통한 한국형 고속열차의 승차감 변화추세에 관한 연구)

  • Kim, Young-Guk;Mok, Jin-Yong;Kim, Seog-Won;Park, Chan-Kyeong;Kim, Ki-Hwan;Park, Tae-Won
    • Journal of Sensor Science and Technology
    • /
    • v.14 no.3
    • /
    • pp.144-149
    • /
    • 2005
  • In this paper, we introduce the variation of ride characteristics for HSR 350x(Korea High Speed Train project) through on-line test during about 3 years. The concept of term "ride comfort" is equivocal. Generally it is evaluated as the vehicle vibration. The ride comfort for HSR 350x has been assessed by statistical method according to UIC 513R. The testing results show that HSR 350x has no problems from the viewpoint of the comfort ride on the high speed line and conventional line and that 1st and 2nd suspensions play an important role in the ride characteristics for high speed train.