• 제목/요약/키워드: railroad construction

검색결과 646건 처리시간 0.039초

지오그리드로 보강된 철도노반 쇄석기층의 지지력에 관한 연구 (Bearing Capacity of Geogrid-Reinforced Railroad Ballast)

  • 신은철;김두환;이규진;이상조
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 춘계학술대회 논문집
    • /
    • pp.367-374
    • /
    • 1999
  • The selection of geogrid types for the use of reinforced rail roadbed is important in the design of railways. Also, the problem of the construction damage on the geogrid during construction is raised by the field engineers. Therefore, laboratory model tests were peformed to investigate the efficiency of the bearing capacity and construction damage. As a result, it was found that the bearing capacity of the rigid geogrid reinforced railroad ballast shows 1.54 times higher than that of the flexible geogrid reinforced case. In addition, there were no noticeable damage during construction.

  • PDF

철도선로에서 배수시설의 설계 및 시공 (Planning and Construction of Drainage System in Railway)

  • 심재범;진병학
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.67-72
    • /
    • 2003
  • Drainage system in railroad has a very important role to operate the system. Drainage system should be carefully considered in design and construction due to a difficult access to the system during operation. In this paper, recent case histories were presented, which showed how an improper drainage system affects the railroad operation.

  • PDF

선형유도모터형식 경전철 전기장치 표준사양 연구 (Study on the Standard Specification of Linear Induction Motor Type Light Rail Vehicle Electrical Equipment)

  • 조홍식;이호용;조봉관;홍재성;류상환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.1181-1182
    • /
    • 2007
  • Light Rail Transit (LRT) System is an urban transit system which has approximately an intermediate transportation capacity between conventional subway and bus ($5,000{\sim}25,000$ persons per hour and per direction). It is a high-tech system which operational capacity, punctuality and mobility are remarkably improved. There are some types of LRT systems such as monorail, tramway, AGT(Automated Guideway Transit), and so on. The LRT systems have been applied and being operated in about a hundred lines around the world and many projects that apply the LRT systems in Korea are being proceeded and scheduled. For the efficient management, economical construction, and safe operation of various LRT systems, the establishment of national standard is necessary such as vehicle standardized specification, vehicle performance test standard, vehicle safety standard, construction guide, operation regulation, etc. of LRT systems. This paper presents the standard specification of electrical equipment of linear induction motor type light rail vehicle, that is LIM AGT(AGT system propelled with linear induction motor) vehicle. The LIM AGT system has been applied in Japan subway and ART(Advanced Rapid Transit) system of Canada and Yongin LRT is currently under construction.

  • PDF

선형유도모터형식 경전철 신호제어시스템 표준사양 연구 (Signalling System Standardization for Linear Induction Motor Type Light Rail Transit)

  • 조봉관;황현철;조홍식;홍재성;류상환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.1183-1184
    • /
    • 2007
  • Light Rail Transit (LRT) is optimized vehicle system for complex urban circumstance. LRT systems have many merits such as improved accuracy and safety. There are many LRT systems such as monorail, tram, automated guideway transit, linear induction motor propulsion and so on. These systems have been operated in Japan and other advanced countries. In Korea, local government has many projects to apply the advanced LRT system. But there are no standards regulation, performance test regulation and construction regulation for monorail system, linear induction motor system and tram in Korea. We expect that standardization brings economical construction and safety. The linear induction motor system has been usually applied to subway in Japan and ART(Advanced Rapid Transit) in Canada. In Korea, the linear induction motor system has been adopted for Yong-In LRT and currently under construction. This paper presents signalling system and TCMS(train control and monitoring system) of linear induction motor system.

  • PDF

철도 신호제어 시스템의 AHP 기법 적용을 통한 성능평가 대상설비 항목 개선 및 안전성 확보에 관한 연구 (On the Improvement of Facility to Performance Evaluation and Security of Safety through the Application of AHP Method in Railroad Signal Control System)

  • 황선우;김주욱;김영민;김형철;이수환
    • 대한안전경영과학회지
    • /
    • 제23권1호
    • /
    • pp.71-79
    • /
    • 2021
  • The railroad facilities are intended for long-term operation as the initial acquisition costs necessary for infrastructure construction are high. Therefore, regular maintenance of railroad facilities is essential, and furthermore, system reliability through systematic performance evaluation is required. In this study, the signal control system of railroad electrical equipment was selected as the subject of research and the performance evaluation target facility selection study was conducted using AHP. The results of the study can contribute to the reliability of the signal control system as well as to the reliability of the railroad system, which is a higher system.

철도교량 F.C.M(Free Cantilever Method) 공법 시공사례 연구 (The Application Of F.C.M(Free Cantilever Method) Case Study Of The Railway Bridge)

  • 권순섭;김경연;최동기;정인철;신상철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.562-567
    • /
    • 2005
  • F.C.M applied from Jin Jung Li to Yang Su Li(660m) in Puk Han River Bridge(1,414m) construction part is a construction method on the double-track construction which is the third section part of work, called Chung Ang Railroad Line(Deok-So${\sim}$Won-Ju). This method is the beginning application on Railroad Bridge. After completing upper slab structure, there are several following works such as setting up ballast, sleepers and laying long rails. So it is important to consider the properties of Railroad Bridge while designing the length of bridge and its single span. After the physical process study the shrinkage and creep of concrete, bending up by prestressing in general PSM bridge, relaxation of tendons as time goes by after post-tension, the conclusion of such a study is applied to the Puk-Han River Bridge in this construction field.

  • PDF

Experimental study to determine the optimal tensile force of non-open cut tunnels using concrete modular roof method

  • Jung, Hyuk-Sang;Kim, Jin-Hwan;Yoon, Hwan-Hee;Sagong, Myung;Lee, Hyoung-Hoon
    • Geomechanics and Engineering
    • /
    • 제29권3호
    • /
    • pp.229-236
    • /
    • 2022
  • In this study, a model experiment and field experiment was conducted to introduce the optimal tensile force when constructing a non-open cut tunnel according to the ground conditions of sandy soil. CMR (Concrete Modular Roof) method is economical because of the high precision and excellent durability, and corrosion resistance, and the inserted parts can be used as the main structure of a tunnel. In addition the CMR method has a stable advantage in interconnection because the concrete beam is press-fitted compared to the NTR (New Tubular Roof) method, and the need for quality control can be minimized. The ground conditions were corrected by adjusting the relative density of sandy soil during the construction of non-open cut tunnels, and after introducing various tensile forces, the surface settlement according to excavation was measured, and the optimal tensile force was derived. As a result of the experiment, the amount of settlement according to the relative density was found to be minor. Furthermore, analysis of each tensile force based on loose ground conditions resulted in an average decrease of approximately 22% in maximum settlement when the force was increased by 0.8 kN per segment. Considering these results, it is indicated that more than 2.0 kN tensile force per segment is recommended for settlement of the upper ground.

철도 비상사고 비상대응 훈련 프로르갬 개발에 관한 연구 (A Study on Developing the Training Program for the Emergency Response against Railroad Emergency Accidents)

  • 박민규;김시곤
    • 대한안전경영과학회지
    • /
    • 제11권2호
    • /
    • pp.33-40
    • /
    • 2009
  • The Railroad Safety Act was implemented in 2005 due to the increased concerns regarding railroad safety since the Daegu subway fire in 2003. In line with this, the Act became a standard to build the total railroad safety systems which has been overlooked compared to the quantitative growth of the railroad business. The minister of the ministry of Land, Transportation and Maritime Affairs lays down the Act for railroad Companies to conduct emergency programs in response to the emergency occurring on the railroad such as fire, explosion, derailment, etc. By enacting the Safety Act, the nation's construction of the contingency management system for railroad emergency increased", and it made the railroad company prepare the Emergency SOP by establishing 'The guideline on the Establishment of the railroad Emergency Plan' in order to support the efficiency of the Act. In line with this, I would like to analyze a matter of system development and the main function of the "railroad Emergency Training Program" for activation improvement of standardized operation procedure developed through the 'Total capitalize Safety Technology development'.

대피선 최소화를 고려한 광역철도 급행화 방안 연구 (Study of the Metropolitan Rapid Transport System to Minimize Sidetrack Construction)

  • 김무선;김정태;김태식;박성수;홍재성;조용현;민재홍
    • 한국철도학회논문집
    • /
    • 제16권5호
    • /
    • pp.402-409
    • /
    • 2013
  • 현재 운영되고 있는 광역도시철도 시스템에서는 표정속도의 저하에 따라 평균 출퇴근 시간도 계속 증가하고 있으며 이는 도시철도 이용률의 저하와 타 교통수단 대비 졍쟁력 저하로 이어지게 된다. 따라서 열차의 표정속도를 대폭 향상시킬 수 있는 광역도시철도의 효율적인 급행화 방안이 요구되고 있다. 이번 연구에서는 가감속도와 최고속도 성능을 향상시킨 고성능 전동차 투입을 고려하여 급행과 완행으로 분리 투입시 획득 할 수 있는 시간 단축 효과와 경제성을 기준으로, 광역철도간 급행화 방안들을 제안 및 그 결과를 비교 분석하였다. 또한 대피선 설치를 최소화 할 수 있는 최적의 급행화 방안을 분석결과로 제안하였다.

철도지하횡단공사시 현장계측을 통한 지반거동 분석 (The Analysis of Ground Behavior on the Crossing Construction Under Railroad Using Field Measurement)

  • 엄기영;신민호;김지훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.546-551
    • /
    • 2001
  • We analysed the affection to subgrade that railway underground crossing construction make with studying displacement of subgrade of each construction methods and processing of Front jacking method and Pipe roof method with already-measured data(during the construction) and additionally-measured field test data in railway underground crossing construction. We measured vertical and horizontal displacement at two construction places of front jacking method and pipe roof method each, and we analysed the results of the measurement at each stage of construction to applied to the excution of construction.

  • PDF