• 제목/요약/키워드: pumping time

Search Result 305, Processing Time 0.022 seconds

Design of the Condenser and Automation of a Solar Powered Water Pump (태양열 물펌프의 운전 자동화 설계)

  • Kim Y. B.;Son J. G.;Lee S. K.;Kim S. T.;Lee Y. K.
    • Journal of Animal Environmental Science
    • /
    • v.10 no.3
    • /
    • pp.141-154
    • /
    • 2004
  • The solar powered water pump is very ideal equipment because solar power is more intensive when the water is more needed in summer and it is very helpful in the rural area, in which the electrical power is not available. The average so]ar radiation energy is 3.488 kWh/($m^2{\cdot}day$) in Korea. In this study, the automatic control logic and system of the water pump driven by the radiation energy were studied, designed, assembled, tested and analyzed for realizing the solar powered water pump. The experimental system was operated automatically and the cycle was continued. The average quantity of the water pumped per cycle was about 5,320 cc. The cycle time was about 4.9 minutes. The thermal efficiency of the system was about $0.030\%$. The pressure level of the n-pentane vapour in flash tank was 150$\%$450 hPa(gauge) which was set by the computer program for the control of the vapour supply. The pressure in the condenser and air tank during cycles was maintained as about 600 hPa and 1,200 hPa respectively. The water could be pumped by the amount of 128kg/($m^2{\cdot}day$) with the efficiency of $0.1\%$ and the pumping head of 10 m for the average solar energy in Korea.

  • PDF

The Consideration about Heavy Metal Contamination of Room and Worker in a Workshop (공작실에서 실내 및 작업종사자의 중금속 오염도에 관한 고찰)

  • Kim Jeong-Ho;Kim Gha-Jung;Kim Sung-Ki;Bea Suk-Hwan
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.17 no.2
    • /
    • pp.87-94
    • /
    • 2005
  • Purpose : Heavy metal use when producing the block from the workshop. At this time, production of heavy metal dust and fume gives risk in human. This like heavy metal to improve seriousness through measurement and analysis. And by the quest in solution is purpose of this thesis. Materials and Methods : Organization is Inductively Coupled Plasma Atomic Emission Spectrometer, and the object is Deajeon city 4 workshops in university hospital radiation oncology (Bismuth, Lead, Tin and cadmium). Method is the ppb the pumping it does at unit, comparison analysis. And the Calculation heavy metal standard level in air through heavy metal standard level in body and blood, so Heavy metal temporary standard set. Results : Subterranean existence room air quality the administration laws appointed Lead and Cadmium's exposure recommend that it is $3{\mu}g/m^3\;and\;2{\mu}g/m^3$. And Bismuth and Tin decides $7{\mu}g/m^3\;and\;6{\mu}g/m^3$ through standard level in air heavy metal and standard level in body and blood. Heavy metal measurement level of workshops in 4 university hospital Daejeon city compares with work existence and nonexistence. On work nonexistence almost measurement level is below the recommend level. But work existence case express high level. Also consequently in composition ratio of the block is continuous with the detection ratio. Conclusion : Worker's heavy metal contamination imbrued serious for solution founds basic part. In hospital may operation on local air exhauster and periodical efficiency check, protector offer, et al. And worker have a correct understanding part of heavy metal contamination, and have continuous interest, health control. Finally, learned society sphere administer to establishment standard level and periodical measurement. And it founds basic solution plan of periodical special health checkup.

  • PDF

Development of Neural Network Based Cycle Length Design Model Minimizing Delay for Traffic Responsive Control (실시간 신호제어를 위한 신경망 적용 지체최소화 주기길이 설계모형 개발)

  • Lee, Jung-Youn;Kim, Jin-Tae;Chang, Myung-Soon
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.3 s.74
    • /
    • pp.145-157
    • /
    • 2004
  • The cycle length design model of the Korean traffic responsive signal control systems is devised to vary a cycle length as a response to changes in traffic demand in real time by utilizing parameters specified by a system operator and such field information as degrees of saturation of through phases. Since no explicit guideline is provided to a system operator, the system tends to include ambiguity in terms of the system optimization. In addition, the cycle lengths produced by the existing model have yet been verified if they are comparable to the ones minimizing delay. This paper presents the studies conducted (1) to find shortcomings embedded in the existing model by comparing the cycle lengths produced by the model against the ones minimizing delay and (2) to propose a new direction to design a cycle length minimizing delay and excluding such operator oriented parameters. It was found from the study that the cycle lengths from the existing model fail to minimize delay and promote intersection operational conditions to be unsatisfied when traffic volume is low, due to the feature of the changed target operational volume-to-capacity ratio embedded in the model. The 64 different neural network based cycle length design models were developed based on simulation data surrogating field data. The CORSIM optimal cycle lengths minimizing delay were found through the COST software developed for the study. COST searches for the CORSIM optimal cycle length minimizing delay with a heuristic searching method, a hybrid genetic algorithm. Among 64 models, the best one producing cycle lengths close enough to the optimal was selected through statistical tests. It was found from the verification test that the best model designs a cycle length as similar pattern to the ones minimizing delay. The cycle lengths from the proposed model are comparable to the ones from TRANSYT-7F.

Production of $[^{18}F]F_2$ Gas for Electrophilic Substitution Reaction (친전자성 치환반응을 위한 $[^{18}F]F_2$ Gas의 생산 연구)

  • Moon, Byung-Seok;Kim, Jae-Hong;Lee, Kyo-Chul;An, Gwang-Il;Cheon, Gi-Jeong;Chun, Kwon-Soo
    • Nuclear Medicine and Molecular Imaging
    • /
    • v.40 no.4
    • /
    • pp.228-232
    • /
    • 2006
  • Purpose: electrophilic $^{18}F(T_{1/2}=110\;min)$ radionuclide in the form of $[^{18}F]F_2$ gas is of great significance for labeling radiopharmaceuticals for positron omission tomography (PET). However, its production In high yield and with high specific radioactivity is still a challenge to overcome several problems on targetry. The aim of the present study was to develop a method suitable for the routine production of $[^{18}F]F_2$ for the electrophilic substitution reaction. Materials and Methods: The target was designed water-cooled aluminum target chamber system with a conical bore shape. Production of the elemental fluorine was carried out via the $^{18}O(p,n)^{18}F$ reaction using a two-step irradiation protocol. In the first irradiation, the target filled with highly enriched $^{18}O_2$ was irradiated with protons for $^{18}F$ production, which were adsorbed on the inner surface of target body. In the second irradiation, the mixed gas ($1%[^{19}F]F_2/Ar$) was leaded into the target chamber, fellowing a short irradiation of proton for isotopic exchange between the carrier-fluorine and the radiofluorine absorbed in the target chamber. Optimization of production was performed as the function of irradiation time, the beam current and $^{18}O_2$ loading pressure. Results: Production runs was performed under the following optimum conditions: The 1st irradiation for the nuclear reaction (15.0 bar of 97% enriched $^{18}O_2$, 13.2 MeV protons, 30 ${\mu}A$, 60-90 min irradiation), the recovery of enriched oxygen via cryogenic pumping; The 2nd irradiation for the recovery of absorbed radiofluorine (12.0 bar of 1% $[^{19}F]fluorine/argon$ gas, 13.2 MeV protons, 30 ${\mu}A$, 20-30 min irradiation) the recovery of $[^{18}F]fluorine$ for synthesis. The yield of $[^{18}F]fluorine$ at EOB (end of bombardment) was achieved around $34{\pm}6.0$ GBq (n>10). Conclusion: The production of $^{18}F$ electrophilic agent via $^{18}O(p,n)^{18}F$ reaction was much under investigation. Especially, an aluminum gas target was very advantageous for routine production of $[^{18}F]fluorine$. These results suggest the possibility to use $[^{18}F]F_2$ gas as a electrophilic substitution agent.

Examination for Efficiency of Groundwater Artificial Recharge in Alluvial Aquifer Near Nakdong River of Changweon Area, Korea (창원지역 낙동강 하천수와 주변 충적층을 이용한 지하수 인공함양의 효율성 평가)

  • Moon, Sang-Ho;Ha, Kyoochul;Kim, Yongcheol;Koh, Dong-Chan;Yoon, Heesung
    • Economic and Environmental Geology
    • /
    • v.47 no.6
    • /
    • pp.611-623
    • /
    • 2014
  • The alluvial aquifer, widely developed near the four major rivers such as Nakdong River, can be used effectively for groundwater artificial recharge and is expected to be the future water resources in Korea. This study is aimed at examining the impact of repeatedly injected river water into the riverside alluvial aquifer on injection rate or efficiency in its system at Changweon area. For this, injection tests were performed two times, first on June 19 and second on September 25 through October 9, 2013, and the mixing ratios of river water to groundwater were used as the tool to compare the efficiency of injection. The mixing ratios were evaluated by using electrical conductivities of injected river water (average $EC=303{\mu}S/cm$) and groundwater ($EC{\fallingdotseq}6,000{\mu}S/cm$) measured at 20 m depth of four observation wells installed 10 m apart from each injection well. The result shows the remarkable differences on two respects. First, in some observation well, detection time for incipient injection effect during $2^{nd}$ injection test was shown to be much slower than that of $1^{st}$ injection test. Second, the hourly increasing rate of mixing ratios in $2^{nd}$ test was revealed to be reduced much more than that of $1^{st}$ test. This means that the efficiency of injection was badly deteriorated by only 1,210 minute injection work. Therefore, injection water needs to be adequately treated beforehand and repeated pumping work and/or resting phase is needed afterwards. To a certain extent, the improvement of water quality in saline aquifer was verified in this system by injection tests.