Journal of the Korea Institute of Building Construction
/
v.13
no.3
/
pp.263-271
/
2013
Change orders have been widespread in both the private and public construction sectors. In particular, in the case of G2B (Government to Business) contracts, adjustment of contract price and/or schedule extension is a frequent occurrence due to change orders. To uncover the causes of change orders and suggest an appropriate strategy, this study analyzed 296 cases of change orders in military facility construction projects from 2008 to 2010. The analysis revealed that the major causes of change orders are users' additional requirements (28.38%), a change of finishing materials (23.99%), and change of footing type (17.57%), in that order. Building on the results of this analysis, the authors suggest plans for practical improvements. Specific recommendations include 1) reflect user requirements at the early stage, 2) minimize the use of additional budget due to change orders, and 3) reduce the process and time for contract amendment, among others. The results of this study may provide significant implications to those involved in military construction projects, particularly project owners (i.e., the Ministry of Defense) and contractors.
Xinyi Song;Wei Liang;Carlos A. Arboleda;Shouqing Wang;Feniosky Pena-Mora
International conference on construction engineering and project management
/
2011.02a
/
pp.474-479
/
2011
With Beijing's success in bidding for the 2008 Olympic Games, the increasing demand for infrastructure development and reduced public sector funding capacity has created a significant funding gap which calls for alternative project delivery methods such as Public-Private Partnership (PPP). Although the exploration of infrastructure projects using PPP model have been practiced since the late 80s, the $560 million National Stadium which served as the main venue for the Olympic Games is the first stadium project in China to be delivered under PPP operation. The project is generally considered successful despite the concession transfer in 2009 with concern of better serving the public interest. Compared to other infrastructure projects such as transportation, waste management and water management, the development of major sports facilities for mega-sports events with PPP has its own unique features and is subject to different major risks. This research identifies and analyzes critical risks in the implementation of PPP in major sports facility development through case study of the National Stadium project. A questionnaire survey and several interviews are conducted to solicit expert opinions from experienced practitioners. The purpose is to provide additional insights in risk management strategies and opportunities in China's PPP implementations in major sports facilities for policy makers and private sectors involved with investment decisions in future similar infrastructure development.
Korean Journal of Construction Engineering and Management
/
v.24
no.5
/
pp.44-51
/
2023
Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.
This study suggests a safety management model for construction management (CM) suitable to domestic conditions so that inefficiency resulted from the operation of construction projects by public and private institutes according to different systems can be eliminated for the securing of systematic and efficient safety management. Based on the suggested safety management model, this study also develops a safety management information system that can efficiently and consistently manage and maintain a large quantity of information, and give necessary supports in a speedy way in the managing of construction projects.
Korean Journal of Construction Engineering and Management
/
v.17
no.5
/
pp.22-34
/
2016
The Project Delivery System (PDS) is used in mixed way without clear classification from tendering system and the standard itself that can be selected is set with project budget or estimated cost only. Essentially, the PDS should consider and reflect project characteristics and types, internal and external factors for the purpose of improving the lives of citizens and their welfare. However, the current status is not operated flexibly due to the given budget, period and uniform laws and regulations. In order to solve this problem, this study suggests a Decision Support Model to select the optimal PDS for public construction projects. The current problem of the PDS for public construction projects were identified and the application of a decision support model was proposed. Subsequently a decision-making model was suggested for each PDS using the identified factors and linear discriminant function of discriminant analysis. An additional questionnaire survey and actual practical case analysis were carried out to verify the effectiveness and applicability of the model to actual work. It can be used by adjusting the decision support model and detailed factors according to the specific characteristics of public organization, ability of person in charge and project type.
Proceedings of the Korean Society of Computer Information Conference
/
2016.07a
/
pp.265-267
/
2016
건설사업의 원가절감은 사용자 요구에 부합되는 기능과 품질을 확보하면서 가장 경제적인 방법으로 시설물을 구축하는 것으로 건설환경 변화에 따른 경쟁력 향상을 위해서는 체계적인 원가관리를 통한 원가절감이 필요하다. 국토교통부 소속 산하기관에서는 공공건설사업의 수행에 따라 설계의 경제성 등 검토, 공정관리 및 사업관리 등을 통해 공사비 절감에 대한 많은 노력을 기울이고 있다. 현재 설계단계에서 설계VE 결과정보는 공공발주기관 간에 상호 공유하고 있으나, 시공단계에서의 원가절감사례 정보에 대한 공유는 아직까지 부족한 실정이다. 공공건설사업의 수행시 유사 건설사업에 대한 원가절감사례 정보를 참조 활용할 수 있도록 단계별 정보시스템 구축 및 원가절감 사례 정보서비스 방안을 제시하였다. 향후 공공건설사업의 기획, 설계, 시공, 유지관리 등 생애주기별 원가절감사례 정보의 분석 및 서비스를 통해 보다 합리적인 의사결정과 공공건설사업의 투자 효율성을 제고할 수 있으리라 기대된다.
Journal of the Korea Institute of Building Construction
/
v.8
no.1
/
pp.97-102
/
2008
The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.
Lam, Patrick T.I.;Chan, Albert P.C.;Akintoye, Akintola;Javed, Arshad Ali
Journal of Construction Engineering and Project Management
/
v.1
no.2
/
pp.43-48
/
2011
In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.
The Hong Kong Housing Authority (HKHA) develops and implements a public housing programme to meet the housing needs of people who cannot afford private rental housing. The HKHA has an existing stock of about 740,000 public rental flats (PRH). According to the 2014 Policy Address, the Government aims to provide an average of about 20,000 PRH units and about 8,000 Home Ownership Scheme (HOS) units per year. We care for the environment. In developing new housing estates, we conduct thorough environmental studies such as microclimate studies and air ventilation assessment, and use passive design to harness the natural characteristics of our sites. We employ environment-friendly design and construction methods, using modular flat design, pre-cast and pre-fabricated construction techniques as well as recycled, green construction materials. We conduct Carbon Emission Estimation for all our projects, conserve the use of natural resources and reduce wastes throughout the life cycle of buildings. We care for people. We adopt the principles of Universal Design and Barrier Free Access for the convenience and welfare of people of all ages and abilities. We carry out Community Engagement to collect stakeholders' views and aspirations, and incorporate them in the design of our projects. We also carry out surveys of residents' views after the occupation of new estates to gauge our success and identify areas for improvement.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2000.06a
/
pp.940-948
/
2000
Noise and vibration generated at construction sites become serious issues because of bigger construction projects and growing use of heavy equipment. Especially in downtown construction, noise and vibration easily exceed the legal standards that can suffer the most of surrounding residents. The number of complaints by the residents who are exposed to the noise increases as their consciousness grows. However, the Korean regulations for the construction noise and vibration only present the overall limits for target areas and times zones, and this make it difficult to take effective measures. Also in rural area, disputes between construction sites and residents arise, but the dispute resolution or taking measures are difficult because clear standards concerning cause-and-effect, estimation of effective levels, calculation of damages, and future precautions and examples lack. This paper describes legal standards regarding the noise and vibration and presents judging standards for the physical damages. This paper also introduces example public complaints that happened at Daewoo construction sites to describe the problems in the existing law and further to enable smooth construction progresses by emphasizing the seriousness of public complaints.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.