Incheon City move onward re-modeling about Jayu Park(public park) in Incheon city. The building restoration must equip all data which are necessary to a restoration and it must be advanced and, currently the project which is advanced is not like that. The place objective which evaluates the restoration possibility of the modern time building where this dissertation is included consequently in project contents it is letting. The evaluation result data is not secured not to be, the restoration is impossible. Also simplicity reappearance of the building where the function disappears without being true feelings characteristic is there is not a possibility of having a construction value. The modern time building restoration which Incheon City it propels consequently it is right to be discontinued.
Suncheon City Regeneration Project is known as the concept of cultural residents. Through the previous projects, the residents' capabilities have been improved, and the projects have been carried out according to their strategies. For this reason, participants in urban regeneration projects are important. The purpose of this study is to actually identify the 'rescue center' and 'direct relationship' with the analysis utilizing the characteristics of social networks NetMiner solution of the participants, who led the project, Suncheon. Surveys and interviews were conducted for participants, and the characteristics of social networks were analyzed in time series to quantify and visualize the results. As a result of the analysis, social networks were changed among the participants before and after the urban regeneration project. Initially, loose networks were denser over time, and initially networks formed only around participants were expanded over time. Network analysis has revealed that the system is strengthening with urban regeneration projects in the form of public and public-private cooperation. This highlights the need for a city-centered urban regeneration strategy centered on people and shows that a dense network of participants can be a success factor.
International journal of advanced smart convergence
/
제5권2호
/
pp.47-52
/
2016
In this study there was the analysis of government incentives and resident support of public crematoriums, typically identified in Korea as a locally unwanted land use (LULUs), in the metropolitan area. The study looked at what government programs would be potential incentives for allowing the crematoriums to exist in metropolitan communities. Such programs were diverse, with projects focused on: enhancing resident welfare, increasing resident income, funeral facilities and management consignment, community oriented programs, education, funding, and others. Among them, it was found that residents were most in support of programs for enhancing resident welfare and increasing income among residents. In order to resolve the complexities of community support for LULUs and government incentives to shift public perception of cremation, three main policies are proposed. First, it would be necessary to compliment additional project support policies which provide medical services, resident prefered projects, and improvement of substandard housing. Second, it would be important to establish ordinances concretely identifying residential support projects based on community needs assessment. Lastly, it would be of the government's best interest to build policies for resident supported projects that reflect local conditions and the residents' demands for allowing non-preferred facilities to be built, and then to analyze the economic feasibility of these demands.
Paris hasn't experienced such excitement since the huge changes brought about by Baron Haussmann in the 19th century. Paris Rive Gauche project, started in 1991, is the largest urban project in city ever since, it represents about 1% of Paris territory. It takes place on a workshops, factories and warehouses area that prospered along the Seine river and the railways in the 19th century. Originally planned as a business quarter, Paris Rive Gauche, developed by SEMAPA for the City of Paris, fosters urban diversity through housing, offices, public facilities, shops, creating a stimulating neighbourhood where 18,000 residents, 30,000 students as well as 60,000 employees will soon croth paths. This project's main principles are urban and social diversity, deployment of public facilites, the development of new university campus inside the city, promotion of industrial patrimony and connecting the old 13th distict to the river and the opposite side. Half of the project is going to be built on a concrete slab that covers the railway tracks which is one of the major performances of this long-term project. This concrete slab represents the new level of the City, about 6 to 8 meters above the railway tracks. We distinguish three families of buildings on the cover : Classic buildings; Bridges buildings and Connection buildings, these last guarantee the linkage between old and new level of the City.
The Ministry of Maritime Affairs and Fisheries is supporting the "Environmentally Friendly Fisheries Promotion and Private Assistance Project" to increase production of eco-friendly, high-value-added foods. Private-backed operators selected for the project will have an economic opportunity to build, expand or refurbish eco-friendly fishing grounds. To facilitate this, the scope of project support was expanded after 2015 and an opportunity was prepared for private subsidy projects to grow to a new level in terms of quality and quantity by switching to a public offering project. However, starting in 2017, demand from the private sector will plunge and selected projects will be delayed or the project implementation rate will be lowered. It was a time for subsidy-related laws and systems to be reinforced but private subsidy projects do not temporarily shrink simply due to the increased administrative burden on private subsidy operators on subsidy management. It plans to review the correlation between laws and systems related to the construction of fish farms and suggest ways to enhance the efficiency of implementation so that economic advantages, the biggest advantage of the private subsidy project, can be recovered within the current legal system.
Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
Journal of Construction Engineering and Project Management
/
제4권4호
/
pp.47-59
/
2014
Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.
스마트시티 민관합동사업은 민관합동으로 토지 및 자본을 투자하여 도시기반시설을 건설하고, 이를 바탕으로 다양한 도시서비스를 제공하여 지속가능한 도시를 조성하고 운영하고자 하는 사업이다. 이러한 사업의 성공은 사업에 영향을 미치는 다양한 요인을 얼마나 정확하게 분석하고 예측하는가에 따라 달려있다고 볼 수 있다. 그러나 다양한 물리적, 사회적 요인들로 인해 사업의 성공 가능성을 사전에 예측하는 것은 매우 어려운 것이 현실이다. 이러한 문제점들을 해결하고 성공적인 사업을 수행하기 위해서는 사업에 영향을 미치는 다양한 요인을 도출하고 적절한 타당성분석을 통하여 대응할 필요가 있다. 따라서 본 연구에서는 선행연구와 발주현황 분석을 통해 타당성분석 예비 구성요소를 도출하고, 델파이 분석을 통하여 5단계의 프로세스와 10개의 프로세스 항목, 19개의 분석항목, 54개의 세부 분석항목 등 타당성분석 구성요소를 제시하였다. 이를 통해 향후 사업추진 시 발생 가능한 다양한 유형의 리스크에 대응하고 사업을 활성화하는 데 기여할 수 있을 것으로 기대한다.
The object of this study is to elicit major success factors along with the phases of implementing the BPR in case of public corporations. To obtain the goal of this research, (1) this study reviews and integrates the major previous BPR studies and shows critical success factors of implementing BPR projects coincided with the characteristics of the public organizations. (2) This study has analyzed and arranged the details of BPR projects of public corporations in South Korea through the literature survey, the questionnaire and the interview. (3) This study classifies 40 critical success factors which were identified in existing studies into ones belonging to 3 phases of BPR projects implementation: Introduction Phase, Execution Phase and Stabilization Phase. (4) This study has tested the relation between critical success factors on each stage of BPR projects implementation and the performance variables. It has proven that there is the statistically significant correlation between the success factors and the performance. The findings of this study are thought not only to be useful as a practical guideline in carrying out BPR project Implementation but also to provide significant basis for constructing the theoretical framework of effective BPR project implementation strategy.
'06년부터 시행된 ITA법에 따라 감리의 역할과 관심이 증가하고 있는 가운데 이를 통해 사업품질을 향상할 수 있는 방안에 대해서도 관심이 커지고 있다. 이런 관점으로 본 연구는 공공부문에서 전자상거래를 추진할 때 정보기술과 관련된 시행착오를 줄이고 정보화 사업의 효율성 및 효과성을 제고를 할 수 있는 시사점을 찾고자 한다. 이를 위해 공공 부문에서 전자상거래와 관련된 사업을 대상으로 정보기술의 적용 결과를 분석한다. 연구사례는 정보기술 감리 관점에서 질적 내용분석의 연구방법으로 살펴보고 정리한다. 연구결과는 중점검토분야 및 개선사항을 적절히 활용함으로써 기존의 특정 요소기술이나 업무모델을 위주로 한 연구보다 실질적인 정책적 함의를 더 제공할 수 있으리라 기대한다. 그리고 공공 분야에서 전자상거래관련 정보화 사업을 추진할 때 정보기술의 품질 향상을 위한 참조뿐만 아니라 정책추진을 하는데도 도움을 줄 것으로 기대한다.
Under the provision of Article 63 of the Enforcement Regulation of the Act on Acquisition and Compensation of Land and Others for Public Project that is recently enacted and implemented (hereinafter referred to as the 'Lend Compensation Act') the compensation is required to make 'When the Actual Damage Amount' is confirmed for the damage in fishery affairs that is outside of the public project area. The compensation for fishery business on the indirect damage area has been excluded from the advance compensation subject to conflict with the existing laws on fishery business compensation with the controversy in method, procedure, time and others to confirm the actual damage amount, and it lacks the standard of calculation for detailed compensation on partial damages outside of business implementation area, which caused the ceaseless conflicts and straggles between the project implementation party and the victimized fishermen regarding the calculation method of damages, standard, compensation period and others. In particular, from the numerous problems in damage compensation in fishery on the indirect damage area, the most recent problem emerged is the issue on application method of damage period in calculating the damage compensation amount that the struggle has been deepened with the differences between the project implementation party and the victimized fishermen without the stipulation on the compensation, that caused the difficulties in carrying out the public project and other serious social problems. In this study, the reasonable application method for the damage period and the calculation plan of the damage amount for calculating the damages on fishery industry outside of the public project implementation zone that is not fully specified under the Land Compensation Act, and the indirect damage area is not influenced for the notification of project recognition, and the compensation to undertake with the damage in the fishery industry in project implementation area to have the nature of damage compensation, the right to engage in fishery industry has the perpetual nature of rights, the fishery damage compensation system of Japan also recognizes the perpetual right on fishery industry to calculate the compensation amount, and the compensation for damage amount has been exercised for the period of actual damage occurrence period regardless of remaining effective period for most of fishery permit and license for fishery compensation outside of the project implementation area following the recent various public projects as well as the development process of theory on fishery loss compensation that the calculation of damage amount on the fishery industry outside of the project implementation zone would be prudent to compensate by calculating the applicable damages during the period of actual damages, and by doing so, the 'just compensation' guaranteed under the Constitution may be materialized. Therefore, the calculation of the damages from the implementation of the public project shall consider the actual period of damages and the degree of damage from the public project to calculate by the income capitalization method, however, considering the equitable consideration with the compensation following the cancellation, it shall not exceed the compensation following the termination of the applicable fishery businesses. Furthermore, the calculation method of partial damage amount on the fishery business following the project implementation shall apply, depending on the period of damage occurrence, by (1) the case of calculating the future damage amount at the present time, and (2) calculating the damage from the past to the present time as well as the damage to be incurred later, by selecting the calculation method for damages following the damage occurrence type.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.