• 제목/요약/키워드: public IT project

검색결과 1,181건 처리시간 0.028초

인천만국공원 내 근대건축물 복원사업연구 (A Study about Restoration to the Original State Modern Building in Incheon Public Garden(Jayu Park))

  • 손장원
    • 한국디지털건축인테리어학회논문집
    • /
    • 제7권1호
    • /
    • pp.21-28
    • /
    • 2007
  • Incheon City move onward re-modeling about Jayu Park(public park) in Incheon city. The building restoration must equip all data which are necessary to a restoration and it must be advanced and, currently the project which is advanced is not like that. The place objective which evaluates the restoration possibility of the modern time building where this dissertation is included consequently in project contents it is letting. The evaluation result data is not secured not to be, the restoration is impossible. Also simplicity reappearance of the building where the function disappears without being true feelings characteristic is there is not a possibility of having a construction value. The modern time building restoration which Incheon City it propels consequently it is right to be discontinued.

  • PDF

NetMiner를 활용한 도시재생사업 참여주체의 시기별 소셜 네트워크 변화 특성 분석 : 순천시 원도심 도시재생선도지역을 중심으로 (Analysis of Social Network Change Characteristics of Participants in Urban Regeneration Project Using NetMiner : Focused on the Urban Regeneration Leading Area in Suncheon-City)

  • 김어진;구자훈
    • 한국IT서비스학회지
    • /
    • 제19권1호
    • /
    • pp.1-16
    • /
    • 2020
  • Suncheon City Regeneration Project is known as the concept of cultural residents. Through the previous projects, the residents' capabilities have been improved, and the projects have been carried out according to their strategies. For this reason, participants in urban regeneration projects are important. The purpose of this study is to actually identify the 'rescue center' and 'direct relationship' with the analysis utilizing the characteristics of social networks NetMiner solution of the participants, who led the project, Suncheon. Surveys and interviews were conducted for participants, and the characteristics of social networks were analyzed in time series to quantify and visualize the results. As a result of the analysis, social networks were changed among the participants before and after the urban regeneration project. Initially, loose networks were denser over time, and initially networks formed only around participants were expanded over time. Network analysis has revealed that the system is strengthening with urban regeneration projects in the form of public and public-private cooperation. This highlights the need for a city-centered urban regeneration strategy centered on people and shows that a dense network of participants can be a success factor.

A Study on Institutional Types of Residents Support Project for the Vitalization of Locating Locally Unwanted Land Uses in the Metropolitan Area

  • Choi, Jae-sil;Kim, Jeong-lae
    • International journal of advanced smart convergence
    • /
    • 제5권2호
    • /
    • pp.47-52
    • /
    • 2016
  • In this study there was the analysis of government incentives and resident support of public crematoriums, typically identified in Korea as a locally unwanted land use (LULUs), in the metropolitan area. The study looked at what government programs would be potential incentives for allowing the crematoriums to exist in metropolitan communities. Such programs were diverse, with projects focused on: enhancing resident welfare, increasing resident income, funeral facilities and management consignment, community oriented programs, education, funding, and others. Among them, it was found that residents were most in support of programs for enhancing resident welfare and increasing income among residents. In order to resolve the complexities of community support for LULUs and government incentives to shift public perception of cremation, three main policies are proposed. First, it would be necessary to compliment additional project support policies which provide medical services, resident prefered projects, and improvement of substandard housing. Second, it would be important to establish ordinances concretely identifying residential support projects based on community needs assessment. Lastly, it would be of the government's best interest to build policies for resident supported projects that reflect local conditions and the residents' demands for allowing non-preferred facilities to be built, and then to analyze the economic feasibility of these demands.

Paris Rive Gauche Project: (Re)developping the City on the City

  • Ernek, Benoit
    • 토지주택연구
    • /
    • 제5권3호
    • /
    • pp.123-129
    • /
    • 2014
  • Paris hasn't experienced such excitement since the huge changes brought about by Baron Haussmann in the 19th century. Paris Rive Gauche project, started in 1991, is the largest urban project in city ever since, it represents about 1% of Paris territory. It takes place on a workshops, factories and warehouses area that prospered along the Seine river and the railways in the 19th century. Originally planned as a business quarter, Paris Rive Gauche, developed by SEMAPA for the City of Paris, fosters urban diversity through housing, offices, public facilities, shops, creating a stimulating neighbourhood where 18,000 residents, 30,000 students as well as 60,000 employees will soon croth paths. This project's main principles are urban and social diversity, deployment of public facilites, the development of new university campus inside the city, promotion of industrial patrimony and connecting the old 13th distict to the river and the opposite side. Half of the project is going to be built on a concrete slab that covers the railway tracks which is one of the major performances of this long-term project. This concrete slab represents the new level of the City, about 6 to 8 meters above the railway tracks. We distinguish three families of buildings on the cover : Classic buildings; Bridges buildings and Connection buildings, these last guarantee the linkage between old and new level of the City.

친환경양식어업육성 민간보조사업비 집행효율 증대 방안 (A Study on the Efficiency of Execution of the Private Subsidy for Environmentally Friendly Aquaculture)

  • 김국주
    • 수산경영론집
    • /
    • 제51권1호
    • /
    • pp.53-66
    • /
    • 2020
  • The Ministry of Maritime Affairs and Fisheries is supporting the "Environmentally Friendly Fisheries Promotion and Private Assistance Project" to increase production of eco-friendly, high-value-added foods. Private-backed operators selected for the project will have an economic opportunity to build, expand or refurbish eco-friendly fishing grounds. To facilitate this, the scope of project support was expanded after 2015 and an opportunity was prepared for private subsidy projects to grow to a new level in terms of quality and quantity by switching to a public offering project. However, starting in 2017, demand from the private sector will plunge and selected projects will be delayed or the project implementation rate will be lowered. It was a time for subsidy-related laws and systems to be reinforced but private subsidy projects do not temporarily shrink simply due to the increased administrative burden on private subsidy operators on subsidy management. It plans to review the correlation between laws and systems related to the construction of fish farms and suggest ways to enhance the efficiency of implementation so that economic advantages, the biggest advantage of the private subsidy project, can be recovered within the current legal system.

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권4호
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

스마트시티 민관합동사업의 타당성분석 구성요소 도출 (Derivation of Components for Feasibility Study of Smart City Public and Private Partnership Projects)

  • 현길용;김승권;이상훈;현창택
    • 한국건설관리학회논문집
    • /
    • 제24권2호
    • /
    • pp.98-110
    • /
    • 2023
  • 스마트시티 민관합동사업은 민관합동으로 토지 및 자본을 투자하여 도시기반시설을 건설하고, 이를 바탕으로 다양한 도시서비스를 제공하여 지속가능한 도시를 조성하고 운영하고자 하는 사업이다. 이러한 사업의 성공은 사업에 영향을 미치는 다양한 요인을 얼마나 정확하게 분석하고 예측하는가에 따라 달려있다고 볼 수 있다. 그러나 다양한 물리적, 사회적 요인들로 인해 사업의 성공 가능성을 사전에 예측하는 것은 매우 어려운 것이 현실이다. 이러한 문제점들을 해결하고 성공적인 사업을 수행하기 위해서는 사업에 영향을 미치는 다양한 요인을 도출하고 적절한 타당성분석을 통하여 대응할 필요가 있다. 따라서 본 연구에서는 선행연구와 발주현황 분석을 통해 타당성분석 예비 구성요소를 도출하고, 델파이 분석을 통하여 5단계의 프로세스와 10개의 프로세스 항목, 19개의 분석항목, 54개의 세부 분석항목 등 타당성분석 구성요소를 제시하였다. 이를 통해 향후 사업추진 시 발생 가능한 다양한 유형의 리스크에 대응하고 사업을 활성화하는 데 기여할 수 있을 것으로 기대한다.

공기업에서의 BPR 실행 성공요인에 관한 단계적 모형 (The Phased Model of Success Factors in BPR Implementation for Public Corporations)

  • 김상훈;김창렬;최점기
    • 한국IT서비스학회지
    • /
    • 제4권2호
    • /
    • pp.1-22
    • /
    • 2005
  • The object of this study is to elicit major success factors along with the phases of implementing the BPR in case of public corporations. To obtain the goal of this research, (1) this study reviews and integrates the major previous BPR studies and shows critical success factors of implementing BPR projects coincided with the characteristics of the public organizations. (2) This study has analyzed and arranged the details of BPR projects of public corporations in South Korea through the literature survey, the questionnaire and the interview. (3) This study classifies 40 critical success factors which were identified in existing studies into ones belonging to 3 phases of BPR projects implementation: Introduction Phase, Execution Phase and Stabilization Phase. (4) This study has tested the relation between critical success factors on each stage of BPR projects implementation and the performance variables. It has proven that there is the statistically significant correlation between the success factors and the performance. The findings of this study are thought not only to be useful as a practical guideline in carrying out BPR project Implementation but also to provide significant basis for constructing the theoretical framework of effective BPR project implementation strategy.

공공분야 전자상거래 시범사업의 정보기술.감리 관점의 사례분석 연구 (A Case Study on IT Audit Issue for e-Business Pilot Project in Public Fields)

  • 이재두
    • 정보처리학회논문지D
    • /
    • 제14D권3호
    • /
    • pp.329-338
    • /
    • 2007
  • '06년부터 시행된 ITA법에 따라 감리의 역할과 관심이 증가하고 있는 가운데 이를 통해 사업품질을 향상할 수 있는 방안에 대해서도 관심이 커지고 있다. 이런 관점으로 본 연구는 공공부문에서 전자상거래를 추진할 때 정보기술과 관련된 시행착오를 줄이고 정보화 사업의 효율성 및 효과성을 제고를 할 수 있는 시사점을 찾고자 한다. 이를 위해 공공 부문에서 전자상거래와 관련된 사업을 대상으로 정보기술의 적용 결과를 분석한다. 연구사례는 정보기술 감리 관점에서 질적 내용분석의 연구방법으로 살펴보고 정리한다. 연구결과는 중점검토분야 및 개선사항을 적절히 활용함으로써 기존의 특정 요소기술이나 업무모델을 위주로 한 연구보다 실질적인 정책적 함의를 더 제공할 수 있으리라 기대한다. 그리고 공공 분야에서 전자상거래관련 정보화 사업을 추진할 때 정보기술의 품질 향상을 위한 참조뿐만 아니라 정책추진을 하는데도 도움을 줄 것으로 기대한다.

공익사업시행(公益事業施行)으로 인한 어업(漁業)의 간접피해(間接被害) 보상액(補償額) 산출방법(算出方法)에 관(關)한 연구(硏究) (A Study on Calculation Method of Compensation for Indirect Damage of Fishery by Undertaking Public Project)

  • 김기대;김병호
    • 수산경영론집
    • /
    • 제37권1호
    • /
    • pp.25-44
    • /
    • 2006
  • Under the provision of Article 63 of the Enforcement Regulation of the Act on Acquisition and Compensation of Land and Others for Public Project that is recently enacted and implemented (hereinafter referred to as the 'Lend Compensation Act') the compensation is required to make 'When the Actual Damage Amount' is confirmed for the damage in fishery affairs that is outside of the public project area. The compensation for fishery business on the indirect damage area has been excluded from the advance compensation subject to conflict with the existing laws on fishery business compensation with the controversy in method, procedure, time and others to confirm the actual damage amount, and it lacks the standard of calculation for detailed compensation on partial damages outside of business implementation area, which caused the ceaseless conflicts and straggles between the project implementation party and the victimized fishermen regarding the calculation method of damages, standard, compensation period and others. In particular, from the numerous problems in damage compensation in fishery on the indirect damage area, the most recent problem emerged is the issue on application method of damage period in calculating the damage compensation amount that the struggle has been deepened with the differences between the project implementation party and the victimized fishermen without the stipulation on the compensation, that caused the difficulties in carrying out the public project and other serious social problems. In this study, the reasonable application method for the damage period and the calculation plan of the damage amount for calculating the damages on fishery industry outside of the public project implementation zone that is not fully specified under the Land Compensation Act, and the indirect damage area is not influenced for the notification of project recognition, and the compensation to undertake with the damage in the fishery industry in project implementation area to have the nature of damage compensation, the right to engage in fishery industry has the perpetual nature of rights, the fishery damage compensation system of Japan also recognizes the perpetual right on fishery industry to calculate the compensation amount, and the compensation for damage amount has been exercised for the period of actual damage occurrence period regardless of remaining effective period for most of fishery permit and license for fishery compensation outside of the project implementation area following the recent various public projects as well as the development process of theory on fishery loss compensation that the calculation of damage amount on the fishery industry outside of the project implementation zone would be prudent to compensate by calculating the applicable damages during the period of actual damages, and by doing so, the 'just compensation' guaranteed under the Constitution may be materialized. Therefore, the calculation of the damages from the implementation of the public project shall consider the actual period of damages and the degree of damage from the public project to calculate by the income capitalization method, however, considering the equitable consideration with the compensation following the cancellation, it shall not exceed the compensation following the termination of the applicable fishery businesses. Furthermore, the calculation method of partial damage amount on the fishery business following the project implementation shall apply, depending on the period of damage occurrence, by (1) the case of calculating the future damage amount at the present time, and (2) calculating the damage from the past to the present time as well as the damage to be incurred later, by selecting the calculation method for damages following the damage occurrence type.

  • PDF