• Title/Summary/Keyword: projects

Search Result 9,512, Processing Time 0.031 seconds

A Framework for developing the automated management system of environmental complaints in construction projects

  • Hong, Juwon;Kang, Hyuna;Hong, Taehoon;An, Jongbaek;Jung, Seunghoon
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.417-422
    • /
    • 2020
  • Vast quantities of environmental pollutants from construction projects are causing significant damage to nearby local communities and thus generate environmental complaints. The construction company, responsible for compensating and resolving environmental complaints, suffers economic damages due to additional expenditures and schedule delays in construction projects. Meanwhile, the construction industry can stagnate from a broader perspective. Therefore, this study aimed to propose a framework for developing an automated management system which consists of two models for environmental complaints in construction projects: (i) the prediction model: a model for predicting environmental complaints based on factors related to environmental complaints; and (ii) the prevention model: a model for providing construction companies with the optimal prevention measure to effectively prevent environmental complaints according to the results of the prediction model. In addition, the algorithm for integrating the developed models into the management system in construction projects was proposed. Eventually, the application of the management system to construction projects can ensure the profitability of construction companies and mitigate damage from environmental pollutants to the nearby local community.

  • PDF

QUANTIFICATION MODEL FOR APPLYING CONSTRUCTION MANAGEMENT PRACTICES IN CONSIDERATION OF PROJECT CHARACTERISTIC FACTORS

  • Hee Sung Cha;Jin Lee Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.624-627
    • /
    • 2013
  • No single project is identical to one another in the construction industry. Furthermore, many construction projects are suffering from tighter budget, shortened schedule and higher client satisfaction level. To overcome these, project managers and engineers are willing to apply various best management practices to their projects. However, it is non-trivial to select the most appropriate practices for their projects. In many cases, it is much more important to find the appropriateness of the management practices than just to use the practices. Although many researchers are focusing on the development of new management practices, there is little research on matching between the circumstances of projects and the developed management practices. The objective of this study is to provide a structured process to suggest the best management practices for individual construction projects by developing a computerized system where an individual project is matched with the most optimal management practices to increase the value of the project. At this stage of writing, the authors have developed a computerized system to effectively find out the best suitable management practices for individual projects. By maximizing the usages of this system, it would facilitate the application of the best management practices in the industry.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

LESSONS LEARNT IN THE IMPLEMENTATION OF DEVELOPMENT PROJECTS IN SOUTH AFRICA

  • Wellington Didibhuku Thwala
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.364-367
    • /
    • 2011
  • The levels of unemployment and poverty are extremely high and two of South Africa's most pressing problems. There is also a widely acknowledged need for housing and municipal infrastructure (water supply, sewerage, streets, storm water drainage, and electricity, refuse collection). From a theoretical perspective supported by experience elsewhere in Africa, there are reasons for considering that properly formulated employment creation programmes based on the use of labour-intensive methods could be established to construct and maintain the required physical infrastructure, thus creating employment, skills and institutional capacities. Over the past 30 years several projects have been initiated in South Africa to counter unemployment and poverty. Given the socio-economic conditions and political objectives (regarding development, employment creation and alleviation of poverty), it is anticipated that future large-scale construction projects will be proposed by the public sector (National, Provincial and Local Government). The paper will first examine the main tenets of the implementation of development projects through the use of labour-intensive construction and a description of progress elsewhere in Africa and their potential contribution which public works programmes could make to alleviate the poverty and unemployment problems. The research will then analyse the successes and challenges that have been experienced in South Africa in relation to the implementation of development projects over the past 30 years. The paper closes with recommendations and lessons for the future.

  • PDF

A Study on Development of Standard Technology for Post-Evaluation of Stream Project I (하천사업의 표준화된 사후 평가 기법 개발 연구 I)

  • Jang, Chorok;Song, Juil;Jang, Moon Yup;Kim, Han Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.542-550
    • /
    • 2020
  • A stream serve the functions of different water utilization, flood control, and the environment, and contributes to the development of national life and culture. On the other hand, it is difficult to efficiently evaluate various projects, such as effectiveness verification and comparison between projects, because the evaluation procedures and evaluation techniques of projects are not uniform and different for each institution. Therefore, a standardization technology was developed for a post-assessment of stream projects that can recognize stream problems and comprehensively evaluate stream-related projects. To this end, various projects, such as project evaluation techniques, national R&D projects, and social welfare projects, were compared and analyzed, and the standardization stages of the project were first suggested. In addition, based on the standardization stage, the evaluation indices for each stage were derived to develop an evaluation table that can evaluate stream-related projects comprehensively. Finally, it is possible to prevent the repeated use of failure factors in the planned projects.

How to Reflect Sustainable Development in Overseas Investment including Equator Principles (해외투자(海外投資)와 지속가능발전 원칙 - 적도원칙(赤道原則)(Equator Principles)을 중심으로 -)

  • Park, Whon-Il
    • 한국무역상무학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.45-72
    • /
    • 2006
  • The Equator Principles are a set of voluntary environmental and social guidelines for ethical project finance. These principles commit banks and other signatories to not finance projects that fail to meet these guidelines. The principles were conceived in 2002 on an initiative of the International Finance Corporation and launched in 2003. Since then, dozens of major banks have adopted the Principles, and with these banks among them accounting for more than three quarters of all project loan market volume the Principles have become the de facto standard for all banks and investors on how to deal with potential social and environmental effects of projects to be financed. While regarding the Principles an important initiative, NGOs have criticised the Principles for not producing real changes in financing activities and for allowing projects to go through that should have been screened out by the Principles, such as the Sakhalin-II oil and gas project in Russia. In early 2006, a process of revision of the principles was begun. The Equator Principles state that endorsing banks will only provide loans directly to projects under the following circumstances: - The risk of the project is categorized in accordance with internal guidelines based upon the environmental and social screening criteria of the International Finance Corporation (IFC). - For all medium or high risk projects (Category A and B projects), sponsors complete an Environmental Assessment, the preparation of which must meet certain requirements and satisfactorily address key environmental and social issues. - The Environmental Assessment report addresses baseline environmental and social conditions, requirements under host country laws and regulations, applicable international treaties and agreements, sustainable development and use of renewable natural resources, protection of human health, cultural properties, and biodiversity, including endangered species and sensitive ecosystems, use of dangerous substances, major hazards, occupational health and safety, fire prevention and life safety, socio-economic impacts, land acquisition and land use, involuntary resettlement, impacts on indigenous peoples and communities, cumulative impacts of existing projects, the proposed project, and anticipated future projects, participation of affected parties in the design, review and implementation of the project, consideration of feasible environmentally and socially preferable alternatives, efficient production, delivery and use of energy, pollution prevention and waste minimization, pollution controls (liquid effluents and air emissions) and solid and chemical waste management. - Based on the Environmental Assessment, Equator banks then make agreements with their clients on how they mitigate, monitor and manage those risks through an 'Environmental Management Plan'. Compliance with the plan is required in the covenant. If the borrower doesn't comply with the agreed terms, the bank will take corrective action, which if unsuccessful, could ultimately result in the bank canceling the loan and demanding immediate repayment. - For risky projects, the borrower consults with stakeholders (NGO's and project affected groups) and provides them with information on the risks of the project. - If necessary, an expert is consulted. The Principles only apply to projects over 50 million US dollars, which, according to the Equator Principles website, represent 97% of the total market. In early 2006, the financial institutions behind the Principles launched stakeholder consultations and negotiations aimed at revising the principles. The draft revised principles were met with criticism from NGO stakeholders, who in a joint position paper argued that the draft fails by ignoring the most serious critiques of the principles: a lack of consistent and rigorous implementation.

  • PDF

Establishment of governance through development of LH cooperation project with local government: Focusing on Jeju Area (지방자치단체·LH 협력사업 도출을 통한 거버넌스 구축방안 : 제주특별자치도를 대상으로)

  • Lee, Mi-hong;Seong, Jang-Hwan;Song, Youngil
    • Land and Housing Review
    • /
    • v.8 no.4
    • /
    • pp.285-294
    • /
    • 2017
  • Recently, as the paradigm of regional development has been transformed into characterization, decentralization and cooperation, small and medium scale development is in the spotlight. In particular, as the transfer of planning authority to local governments accelerates, LH is in the process of seeking to transform itself into a system that is in line with local government demand. The purpose of this study is to elaborate the regional pending projects that meet the demand of the region. The Jeju Special Self-Governing Province is the area where land and housing prices have increased more than three times recently, which is the area of interest in recent years due to the various demand for development projects. Another objective is to establish a local government based on LH's system, it is aimed to derive a collaboration method with local government, province corporation and local researchers. The criteria for deriving the cooperation projects between the local government and LH are basically the ones that can be carried out by LH and future-oriented projects. The process of deriving has undergone the process of statutory planning, unscrupulous plan analysis, and consultation of experts' advisory committees. In order to derive the regional cooperation project, four criteria such as local uniqueness, future possibility, business promotion efficiency, and local cooperation project were set. Major projects of the Jeju Special Self-Governing Province are improvement of the surrounding traffic system, construction of the hinterland due to the construction of the second airport, and establishment of Cruise Port(Jeju Port, Seogwipo Port). The role of each entity in the implementation of regional cooperation projects is as follows. Local government should request subsidies for the projects in case of lack of budget support and secure them through competition with other regions. In addition, it should be responsible for the operation and management of the facility once it has been supported and completed smoothly. The Ministry of Land, Infrastructure and Transport affects each region through approval and subsidy of the development plan. After the development project is completed, it evaluates the development project through monitoring and plays a role of continuously improving the system. As a business operator, the provincial corporation will carry out small-scale projects including non-physical projects such as community participation. In the case of LH regional headquarters, the general manager of the region will establish a comprehensive business plan, secure development availability, and carry out large-scale growth promotion projects.

A Study on Dental Hygienists' Needs for Specialized Education in Health Promotion Projects (보건분야 치과위생사들의 건강증진사업을 위한 전문교육 필요도 조사)

  • Hwang, Yoon-Sook
    • Journal of Korean society of Dental Hygiene
    • /
    • v.7 no.4
    • /
    • pp.611-625
    • /
    • 2007
  • The purpose of this study was to analyze dental hygienists' opinions on health promotion projects in public health and their needs for specialized education in the projects, so that it could help prepare specialized education program required for health promotion projects in the future. To meet the goals, total 364 dental hygienists working in public health were asked to join a questionnaire survey via e-mail in September 2007 for data analysis. As a result, this analysis came to the following conclusions: First, it was found that 29.9% of total respondents took in charge of health promotion projects, and 26.9% respondents considered it very necessary to be responsible for the health promotion projects(56.0% considered it necessary). Almost half respondents considered nonsmoking assistance most desirable task(48.4%) and foremost demanded(50.5%) out of all current health promotion projects, 39.8% respondents answered that they could carry on health promotion task, if assigned, after completing occupational training course. Second, it was found that 39.3% respondents acquired other licenses and qualifications than certificate of registered dental hygienist, and their medical licenses or qualifications included certificate of nursing assistant(18.7%) and certificate of social worker(11.8%) by category. Third, in terms of opinions on possible ways to facilitate health promotion projects, it was found that over half respondents considered it recommended to step up specialized education(56.9%) and prepare legal basis and administrative system(53.6%). Notably, 90.7% respondents considered it necessary to step up specialized education in health promotion. Fourth, in terms of opinions on participation in health promotion projects, it was found that almost half respondents(49.7%) considered it necessary and very positive for extending dental hygienists' works in the future. Moreover, in terms of reasons for sum positive answers, it was found that many respondents considered it helpful for appointment(41.8%) and contributing to capability development and job satisfaction(44.5%). In terms of opinions that sud, participation would be unnecessary, 29.7% respondents thought that nothing would be changed in their dental health projects even with reduced number of public health dentists, and 31.3% respondents thought that dental hygienists are professional manpower responsible only for dental health works. Finally, in terms of on-the-job training(OJT) related to health promotion, it was found that 92.9% respondents desired for OJT. In terms of experiences in OJT, 79.9% respondents answered that they never joined OJT course. In other words, only 20.1% respondents joined OJT courses for health promotion task, such as nonsmoking assistance(8.8%), health promotion FMTP training(2.2%), exercises(1.4%) and nutrition(0.6%).

  • PDF

A Study on the Improvement of Efficient Execution System for Cadastral Resurvey Project (지적재조사사업의 효율적인 추진체계 개선에 관한 연구)

  • Kim, Jae Myeong;Choi, Yun Soo;Yoon, Ha Su;Kim, Young Dan
    • Spatial Information Research
    • /
    • v.21 no.4
    • /
    • pp.47-62
    • /
    • 2013
  • Recently there are growing arguments about the needs to improve Cadastral Resurvey Projects more efficiently and rationally since the projects have realistically started. This study aims to analysis some problems of the projects and finds out the solutions. With this purpose, we have surveyed some literatures related to the demonstration projects, and then have examined some similar domestic urban development projects and international Cadastral Resurvey Projects in order to apply their appropriate tools to the present or future projects. Generally the execution process of Cadastral Resurvey Projects has four steps and this study arranges the main problems in each steps. In the result it suggests that some improvements should change as the followings. (1) It is more effective to take planning-based approach than project-based one. (2) The project boundary needs to be decided with the rectangular patterns not the irregular ones for the efficient project. (3) The adjusting the current baseline of agreement should be reconsidered because too high baseline may make the project difficult to progress. (4) Not only systematical public relations to promote the projects but also a variety of incentives to induce the public participations is very important to solve the problems of involvement. (5) Institutional tools for collaborate planning is also desirable to solve the conflicts among stakeholders rationally and effectively.

Estimation of Post Evaluation Index of Natural Disaster Prevention Projects using Structure Equation Modeling (구조방정식모델을 이용한 자연재해예방사업의 사후 평가 지수 산정)

  • Heo, Bo Young;Song, Jai Woo;Yoon, Sei Eui;Lee, Seung Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1807-1814
    • /
    • 2014
  • Natural disaster has been hard to prevent the occurrence of itself, thus in order to reduce the economic damages and loss casualties, it is important to be prepared in cases that the disasters should occur in advance. Interest of the related project to prevent various natural disasters has been grown along with an investment in Korea. Along with this movement, when investments related to natural disaster prevention projects were built on, the post evaluation that can verify the ripple effects of those investments on the community should be emerging as an essential task. For evaluating the effects of public investment projects such as natural disaster prevention projects in this study, the related researches would continue through qualitative analyses, for example, cost-benefit analysis. Even the qualitative analysis alone cannot fully explain the effects of those projects, the diverse methods of analyzing and evaluating those effects might not have been presented in those fields. For the post evaluation of natural disaster prevention projects through the qualitative analysis, this study derived subjects that had effects on the post evaluation of natural disaster prevention projects. Also, employing the structural equation modeling (SEM), the causation between post evaluation subjects and the effects of projects were quantitatively analyzed, and the weighting factors of evaluation items were calculated respectively. Based on these results, post evaluation index formula was proposed for the natural disaster prevention projects in Korea.