• Title/Summary/Keyword: projects

Search Result 9,512, Processing Time 0.036 seconds

An Exploratory Study for the Evaluation of Risk Factors in Information System Development Using AHP (AHP기법을 활용한 정보시스템 개발 프로젝트 위험요인 평가에 관한 탐색적 연구)

  • Jung Chul-Yong;Son Dong-Ki
    • The Journal of Information Systems
    • /
    • v.15 no.2
    • /
    • pp.77-93
    • /
    • 2006
  • Information system(IS) development projects are mostly unique in terms of the characteristics of projects such as project requirements, customers, project members, and development environment. Therefore, it is very hara by nature, to manage the development process systematically. In addition the long-term enlarged scale projects with more complexity and specificity required have brought in much more risk factors than before. The paper recognized risk factors in IS development projects and measured the importance of those risk factors using the AHP(Analytical Hierarchy Process) method. The results can be used in the risk management of IS development projects.

  • PDF

A Study on the composition of PFV(project financing vehicle) used in large-scale development project (대규모 개발사업에서의 PFV 구성에 관한 연구)

  • Kim, Eun-sung;Kim, Jae-jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.159-163
    • /
    • 2008
  • The trend of Development Projects has been changing through a few recent years. Small-scale development projects in the past were usually for building residences or officetel in a big cities. making lots of profits. These projects made not only lots of profits but also unbalance between the urban centers and the suburbs. So government made some regulations to prevent the things from being worse anymore, planned to develop the country in balance and began to lead large-scale development project such as Inno city and Newtown. At first, in this study, the phases and the characteristics of development project's change will be looked around. And then, after overview about PFV(project financing vehicle) used a lot in large-scale development projects will be seen, the better ways to use PFV in large-scale development projects are going to be proposed by considering the problems in PFV's conformation.

  • PDF

Exploring on Risk Factors of SI Project Escalation and SI Project De-escalation (SI 프로젝트 범위 증감(Escalation/De-escalation)에 영향을 미치는 위험요소에 대한 연구)

  • Kim, Sang-Yoon;Baek, Seung;Choi, Duck-Sun;Oh, Soo-Jin
    • Journal of Information Technology Services
    • /
    • v.3 no.2
    • /
    • pp.53-64
    • /
    • 2004
  • For many reasons, SI(Systems Integration) projects can fail. Sometimes, they can result in considerable financial losses to the organizations that undertake them. These projects are abandoned or redirected. However, the cost of project abandonment or redirection can represent a tremendous waste of organizational resources. By managing failure factors carefully, project managers can prevent projects from failing. Types of project failure can be categorized into escalation and de-escalation. Project escalation is that, as projects progress, the project scopes keep increasing. Project de-escalation is that, as projects progress, the project scopes keep decreasing. This study examine relative importance of risk factors that cause project escalation and de-escalation.

A study on the Project Process Management System (PPMS) for the effective management of R&D projects (연구개발(R&D) 프로젝트의 효과적 관리를 위한 과정모형에 관한 연구)

  • 김홍범
    • Korean Management Science Review
    • /
    • v.12 no.3
    • /
    • pp.45-60
    • /
    • 1995
  • This study examines a normative model of project management systems, PPMS, to provide information for directing R&D activity in order to increase R&D productivity. The PPMS (Project Process Management System) is a disciplined and systematic framework to manage R&D projects effectively and efficiently under the assumption of a strategic decision making and long-range planning. The purpose of PPMS is to provide for the management of research organization at different levels an effective management tool; first, for the planning system which deals with rational selection and authorization of R&D projects, second, for the control system which concerns monitoring and controlling the execution of R&D projects, and finally, for the evaluation system which attains evaluation of the performance results of R&D projects and determination of the necessary follow-up. A view for the future development of project management within the context of a project-performing organization is also elaborated to exhibit the progress and phase description of the project management system.

  • PDF

A Study on Evaluation Criteria of Design Project though a Case Study of Introduction to Engineering Design Course (공학설계입문 운영사례를 통한 설계과제 평가기준 탐색)

  • Ryu, Kyung-Hyun
    • Journal of Engineering Education Research
    • /
    • v.14 no.6
    • /
    • pp.31-40
    • /
    • 2011
  • This paper explores and proposes the evaluation criteria of design projects in the entry-level design course. In the entry-level engineering design course the students proceeds various design projects to understand the concept of engineering design process and to develop the creativity. The evaluation criteria of design projects is very important component because the outcome of students in the engineering design course are effected from the evaluation criteria that enforces the students to focus on doing their task. According to this case study the evaluation criteria can be good solution to evaluate the design projects. By the outcome standard of ABEEK on the entry-level engineering design course the evaluation criteria was selected with the results of design projects such as design plan, report, handicrafts, objectives.

A Study on Environment-friendly Location & Review Criteria by Development Project Types (개발사업 유형별 환경친화적 입지 및 검토기준 연구)

  • Sung, Hyun-Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.12 no.4
    • /
    • pp.34-46
    • /
    • 2009
  • and to provide (case example-focused) guidelines for environment-friendly oriented plans. Key findings of this study are as follows : first, a total of 2,465 development projects covering $173km^2$ were undertaken in Gyeonggi province in last three years. Second, based on the analysis of 16 development projects in four types, about 20 alternative environment-friendly location were suggested. Thirdly, 56 environment-friendly criteria were suggested for the environmental assessment items by setting at least three alternatives. Going forward, if discussion case examples by project type, environment-friendly location criteria by project type, and environment friendly review criteria by assessment item suggested in this study are fully utilized when initiating or approving various development projects in the future, environment-friendliness will be enhanced in development projects.

Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects (농어촌정비사업 공종별 실적공사비 적산시스템개발)

  • 김현영;이정재;김영기;오상원;전효묵
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.3
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

State of R&D Projects for Intelligent Robots (지능형로봇 기술개발 현황)

  • Park, Hyun-Sub;Koh, Kyoung-Chul;Kim, Hong-Seok;Lee, Ho-Gil
    • The Journal of Korea Robotics Society
    • /
    • v.2 no.2
    • /
    • pp.191-195
    • /
    • 2007
  • Abstract MOCIE(Ministry of Commerce, Industry and Energy) handles 6 Projects for Intelligent Robot, whose budget is around 40 Million dollars per year. In this paper we have tried to analyze the state of robot technology of the projects. Each sub-projects has been divided according to the technological classification. Two major projects of Next Generation Growth Engine and 21C Frontier show different state each other. The former is focused on the product while the latter on the technology. Output of 21C Frontier should be linked to the Next Generation Growth Engine, otherwise, it will fail to advance. The project management handles only the quantitative performance such as business results, number of prototype, and number of patents and papers. Technological Capability is essential and it should be managed. This paper proposes efficient classification of robot technology and technology index.

  • PDF

ICT Implementation for Materials Management in Construction Projects: Case Studies

  • Kasim, Narimah
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.1
    • /
    • pp.31-36
    • /
    • 2011
  • Construction materials usually constitute a major portion of the total cost in a building construction project. Materials management Is made problematic by materials shortages, delays in supply, price fluctuations, damage and wastage, and lack of storage space. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the case studies reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia Is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF