• Title/Summary/Keyword: projects

Search Result 9,512, Processing Time 0.032 seconds

Quantitative Analysis for Problems and Improvement Directions of the Comprehensive Rural Village Development Projects using DEMATEL and Contents Analysis (DEMATEL 및 내용분석기법을 활용한 농촌마을종합개발사업 문제점 및 개선방안의 정량적 분석)

  • Bae, Seung-Jong
    • Journal of Korean Society of Rural Planning
    • /
    • v.16 no.3
    • /
    • pp.173-184
    • /
    • 2010
  • The objectives of this study are to quantitatively analyze problems and improvement directions of the comprehensive rural village development projects through DEMATEL and contents analysis. Contents analysis was conducted for 15 existing researches and 28 problems were deducted at the stage of the comprehensive rural village development projects. The Decision Making Trial and Evaluation Laboratory(DEMATEL), a mathematical computation method, was utilized as an objective method to handle the inner dependences within a set of problems. The results of this research are summarized as follows. First, insufficient education and publicity of project was the most considerable cause problem. Second, lack of participation, will, and ability of residents was the most considerable effect problem. Finally, several improvements of the comprehensive rural village development projects were deducted by cause and effect relationship of problems.

A Multi-Criteria Decision Making Method Based on Fuzzy Outranking Relation (부정확한 대안평가하에서 모호선호관계를 이용한 다기준 의사결정 기법)

  • Cho, Kwon-Ik;Kim, Soung-Hie
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.16 no.2
    • /
    • pp.37-44
    • /
    • 1990
  • In selecting the best project in multi-criteria decision making problems, the imperfect information of consequence and the vague preference of the decision maker(DM) would make the decision analysis more complex together with the conflict of several criteria. In this context, a method is proposed to deal the fuzzy information mentioned before instead of reducing it to a single representative value. And, based on the given imprecise information, projects are ranked completely or partially according to DM's vague preference. The procedure consists, for each pair of projects, of calculating the degree of supporting over all criteria and the degree of opposing with respect to each criterion for their outranking relation. Together with weights for each criterion, these indices produce fuzzy outranking relations for each pair of projects. And a complete or partial ranking of projects is obtained according to outranking degrees considering the interdependence among projects.

  • PDF

Agile Software Development Framework in a Small Project Environment

  • Lee, Seiyoung;Yong, Hwan-Seung
    • Journal of Information Processing Systems
    • /
    • v.9 no.1
    • /
    • pp.69-88
    • /
    • 2013
  • Agile methods are highly attractive for small projects, but no agile method works well as a standalone system. Therefore, some adaption or customization is always required. In this paper, the Agile Framework for Small Projects (AFSP) was applied to four industry cases. The AFSP provides a structured way for software organizations to adopt agile practices and evaluate the results. The framework includes an extended Scrum process and agile practices, which are based on agility and critical success factors in agile software projects that are selected from Scrum, XP, FDD, DSDM and Crystal Clear. AFSP also helps software managers and developers effectively use agile engineering techniques throughout the software development lifecycle. The case study projects were evaluated on the basis of risk-based agility factors, the agility of the adopted practices, agile adoption levels, and the degree of the agile project success. The analysis of the results showed that the framework used in the aforementioned cases was effective.

A Study on Estimating Function Point Count of Domestic Software Development Projects (국내 소프트웨어 개발사업에 적합한 기능점수규모 예측방법에 관한 연구)

  • 박찬규;신수정;이현옥
    • Korean Management Science Review
    • /
    • v.20 no.2
    • /
    • pp.179-196
    • /
    • 2003
  • Function point model is the international standard method to measure the software size which is one of the most important factors to determine the software development cost. Function point model can successfully be applied only when the detailed specification of users' requirements is available. In the domestic public sector, however, the budgeting for software projects is carried out before the requirements of softwares ere specified in detail. Therefore, an efficient function point estimation method is required to apply function point model at the early stage of software development projects. The purpose of this paper is to compare various function point estimation methods and analyse their accuracies in domestic software projects. We consider four methods : NESMA model, ISBSG model, the simplified function point model and the backfiring method. The methods are applied to about one hundred of domestic projects, and their estimation errors are compared. The results can used as a criterion to select an adequate estimation model for function point counts.

Architectural Tendencies of Public Art Projects in Korea - Focused on Those in Which Korean Architects Participated in Group after 2000 - (국내 공공미술 사업의 건축적 경향 - 국내 건축가가 단체로 참여한 2000년 이후의 사업을 중심으로 -)

  • Park, Seul-Ki;Kim, Ransoo
    • Korean Institute of Interior Design Journal
    • /
    • v.24 no.1
    • /
    • pp.133-143
    • /
    • 2015
  • This study tried to inquire architectural tendencies in public art projects by analyzing projects and public art works designed by Korean architects. First, it described not only the background and the objectives of this study but also the scope and the methods of it. Second, it gave an overview of public art by explaining the concept, the institutions, and the history of it in Korea. Third, it investigated the contents of public art projects in Korea, in which more than two architectural teams participated, analyzing the tendencies of public art works designed by architects. In order to find the architectural tendencies of public art projects, it analyzed the intentions, the contents and the expressions of architects' art works. In conclusion, this study regarded the architectural tendencies as site-specific, space-experiencing, sheltering, multi-purposeful, contextual, recycling, and eco-friendly.

A Comparitive Study of MAUT and AHP in Priority Setting of R&B Projects (연구개발사업 우선순위 설정에 있어서 다속성효용이론(MAUT)과 계층분석과정(AHP)의 비교)

  • 박주형;김정흠
    • Journal of Korea Technology Innovation Society
    • /
    • v.2 no.2
    • /
    • pp.201-218
    • /
    • 1999
  • The article contains an introduction of possibility of applying Multi-Attribute Utility Theory(MAUT) for priority setting of R&D projects. MAUT is compared with AHP, which is widely used recently. These two techuiques are applied to set priorities of R&D projects In a Government-funded Research Institute. Six criteria are chosen from consultation with decision makers. They are composed of 1) validity as representative projects, 2) possibility of resource mobilization, 3) spillover effect of developed technologies, 4) possibility of success, 5) scope of participation and 6) clarity of research goal. To set priorities of R&D projects, SMART(Simple MultiAttribute Rating Technique) and DVM(Difference Value Measurement) out of many MAUT methods are used to design the utility function and to determine the weights among criteria. The aggregation model is additive on the assumption the criteria are independent. AHP executes pairwise comparisons for criteria and alternatives. From the results of the case study, the results and theoretical characteristics are compared.

  • PDF

Finding Significant Factors to Affect Cost Contingency on Construction Projects Using ANOVA Statistical Method -Focused on Transportation Construction Projects in the US-

  • Lhee, Sang Choon
    • Architectural research
    • /
    • v.16 no.2
    • /
    • pp.75-80
    • /
    • 2014
  • Risks, uncertainties, and associated cost overruns are critical problems for construction projects. Cost contingency is an important funding source for these unforeseen events and is included in the base estimate to help perform financially successful projects. In order to predict more accurate contingency, many empirical models using regression analysis and artificial neural network method have been proposed and showed its viability to minimize prediction errors. However, categorical factors on contingency cannot have been treated and thus considered in these empirical models since those models are able to treat only numerical factors. This paper identified potential factors on contingency in transportation construction projects and evaluated categorical factors using the one-way ANOVA statistical method. Among factors including project work type, delivery method type, contract agreement type, bid award type, letting type, and geographical location, two factors of project work type and contract agreement type were found to be statistically important on allocating cost contingency.

Development of An Information System for SOC Projects (SOC사업의 정보시스템 개발에 관한 연구 -원자력발전소건설 사업을 중심으로)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.2
    • /
    • pp.46-54
    • /
    • 2003
  • SOC(Social Overhead Capital) projects such as road, power plant, airport or telecommunication facility construction require a large scale of cost, a long period of time and management of a number of sub-contractors. So systematic and efficient management tool in SOC projects is inevitable. Information system provides a valuable tool which can integrate and manage the large volume of information for SOC projects. This study investigates and analyzes the information system of nuclear power plant construction project. Based on this study, we can suggest the direction for designing information system for SOC projects.

Searching for Core Project Management Issues in Remodeling Projects : Focus on office building remodeling projects (리모델링 프로젝트의 사업관리 현안 발굴 연구 : 오피스빌딩 리모델링 사업을 대상으로)

  • Seo Hee-jun;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.220-223
    • /
    • 2004
  • Remodelling projects have recently emerged as an alternative construction market. Due to the limited experience of such projects, repetitive mistakes and failures in project management become concerns for those in the market sector. The objective of this paper to report preliminary findings in relation to core project management issues in office remodelling projects based on literature review and expert interviews.

  • PDF

R&D Project Selection Models in the Public Sector (중점연구개발과제 도출을 위한 기술기획 모델-공공부문의 정보통신기술개발계획을 중심으로-)

  • 임명환
    • Journal of Technology Innovation
    • /
    • v.5 no.1
    • /
    • pp.266-287
    • /
    • 1997
  • The purpose of this paper is to purpose methods and procedures by which we can set up technology planning scheme essential for R'||'&'||'D(or technology) planning in public sector (governmental and government-sponsored institutions), and can develop and select "main R'||'&'||'D projects" which are crucial to R'||'&'||'D planning, were quite specifically discussed in case of I'||'&'||'T(Information '||'&'||' Telecommunications) sector, so that they may not remain theoretical but may be practically applicable to real R'||'&'||'D programs. In this paper, the concept of technology planning was defined as a procedure for establishing nominal planning to acquire technologies efficiently for a specific sector. More detailed definition optimal technology-acquisition strategy, i.e., analyzing technological development '||'&'||' environ-ment, establishing R'||'&'||'D objectives as promising technology opportunities, selecting main R'||'&'||'D projects, allocating resources and so on."The"main R'||'&'||'D projects by technology sectors and by planning phases and then deciding on priority. Scoring method was rsed in assessment phase. Summing up, this paper suggested technology planning scheme of methods and procedures for sorting out required technologies, developing and assessing public R'||'&'||'D projects, and finally selecting main R'||'&'||'D projects.

  • PDF