• Title/Summary/Keyword: project proposal

Search Result 243, Processing Time 0.022 seconds

A Case Study of the Performance and Success Factors of ISMP(Information Systems Master Plan) (정보시스템 마스터플랜(ISMP) 수행 성과와 성공요인에 관한 사례연구)

  • Park, So-Hyun;Lee, Kuk-Hie;Gu, Bon-Jae;Kim, Min-Seog
    • Information Systems Review
    • /
    • v.14 no.1
    • /
    • pp.85-103
    • /
    • 2012
  • ISMP is a method of writing clearly the user requirements in the RFP(Request for Proposal) of the IS development projects. Unlike the conventional methods of RFP preparation that describe the user requirements of target systems in a rather superficial manner, ISMP systematically identifies the businesses needs and the status of information technology, analyzes in detail the user requirements, and defines in detail the specific functions of the target systems. By increasing the clarity of RFP, the scale and complexity of related businesses can be calculated accurately, many responding companies can prepare proposals clearly, and the level of fairness during the evaluation of many proposals can be improved, as well. Above all though, the problems that are posed as chronic challenges in this field, i.e., the misunderstanding and conflicts between the users and developers, excessive burden on developers, etc. can be resolved. This study is a case study that analyzes the execution process, execution accomplishment, problems, and the success factors of two pilot projects that introduced ISMP for the first time. ISMP performance procedures of actual site were verified, and how the user needs in the request for quote are described was examined. The satisfaction levels of ISMP RFP for quote were found to be high as compared to the conventional RFP. Although occurred were some problems such as RFP preparation difficulties, increased workload, etc. due to the lack of understanding and execution experience of ISMP, in overall, also occurred were some positive effects such as the establishment of the scope of target systems, improved information sharing and cooperation between the users and the developers, seamless communication between issuing customer corporations and IT service companies, reduction of changes in user requirements, etc. As a result of conducting action research type in-depth interviews on the persons in charge of actual work, factors were derived as ISMP success factors: prior consensus on the need for ISMP, the acquisition of execution resources resulting from the support of CEO and CIO, and the selection of specification level of the user requirements. The results of this study will provide useful site information to the corporations that are considering adopting ISMP and IT service firms, and present meaningful suggestions on the future study directions to researchers in the field of IT service competitive advantages.

  • PDF

Geoscientific land management planning in salt-affected areas* (염기화된 지역에서의 지구과학적 토지 관리 계획)

  • Abbott, Simon;Chadwick, David;Street, Greg
    • Geophysics and Geophysical Exploration
    • /
    • v.10 no.1
    • /
    • pp.98-109
    • /
    • 2007
  • Over the last twenty years, farmers in Western Australia have begun to change land management practices to minimise the effects of salinity to agricultural land. A farm plan is often used as a guide to implement changes. Most plans are based on minimal data and an understanding of only surface water flow. Thus farm plans do not effectively address the processes that lead to land salinisation. A project at Broomehill in the south-west of Western Australia applied an approach using a large suite of geospatial data that measured surface and subsurface characteristics of the regolith. In addition, other data were acquired, such as information about the climate and the agricultural history. Fundamental to the approach was the collection of airborne geophysical data over the study area. This included radiometric data reflecting soils, magnetic data reflecting bedrock geology, and SALTMAP electromagnetic data reflecting regolith thickness and conductivity. When interpreted, these datasets added paddock-scale information of geology and hydrogeology to the other datasets, in order to make on-farm and in-paddock decisions relating directly to the mechanisms driving the salinising process. The location and design of surface-water management structures such as grade banks and seepage interceptor banks was significantly influenced by the information derived from the airborne geophysical data. To evaluate the effectiveness ofthis planning., one whole-farm plan has been monitored by the Department of Agriculture and the farmer since 1996. The implemented plan shows a positive cost-benefit ratio, and the farm is now in the top 5% of farms in its regional productivity benchmarking group. The main influence of the airborne geophysical data on the farm plan was on the location of earthworks and revegetation proposals. There had to be a hydrological or hydrogeological justification, based on the site-specific data, for any infrastructure proposal. This approach reduced the spatial density of proposed works compared to other farm plans not guided by site-specific hydrogeological information.

Proposal for Estimation Method of the Suspended Solid Concentration in EIA (환경영향평가에서 부유사 농도 추정 방법 제안)

  • Choo, Tai Ho;Kim, Young Hwan;Park, Bong Soo;Kwon, Jae Wook;Cho, Hyun Min
    • Journal of Wetlands Research
    • /
    • v.19 no.1
    • /
    • pp.30-36
    • /
    • 2017
  • SS(Suspended Solid) concentration by soil erosion into river at normal and flood season should be measured. However, to present the variation of SS due to various development project such as EIA(Environmental Impact Assessment), River Master Plan, and so on, it is necessary to estimate not measure SS, but there are not exist how to estimate SS. In the present study, therefore, we propose the hydrologic method of estimating SS concentration using the results of particular frequency flood discharge and sediment discharge by RUSLE method. SS consists of silty and clay soil and colloid particle etc. However, in the present study, silty and clay soils of sediment discharge except send set up SS standards. The flow discharge to estimate SS concentration are 1~2 years for normal season, 30~100 years for flood season. Meanwhile, analysis software for probable rainfall uses Fard2006, probable rainfalls under 2-year frequency are estimated using rainfall data and frequency factor of Gumbel distribution. The results of estimating SS concentration using runoff volume by sediment and flow discharges of silty and cray soils as above method show that reliable level of SS concentration is considered in predevelopment of natural condition and under development of barren condition. Especially, SS concentration takes notice that the value of sediment discharge makes a huge difference according to channel slope, it was confirmed that the value obtained by dividing the SS concentration by the channel slope is relatively constant even though the topographical factors are different. Therefore, if the present study will be proceeded for various watersheds, it will be developed as estimation method of SS concentration.