• Title/Summary/Keyword: project process

Search Result 4,167, Processing Time 0.03 seconds

Paper Evaluation of 'Application of AHP in Project Management' by K.M.A.S-S. Al-Harbi (프로젝트경영 관련 연구 논문 평가 - K.M.A.S-S. Al-Harbi의 'Application of AHP in Project Management' 논문을 대상으로 -)

  • Kim, Min-Cheol;Ha, Tai-Hyun
    • Journal of Digital Convergence
    • /
    • v.8 no.1
    • /
    • pp.81-92
    • /
    • 2010
  • This study focuses on the evaluation of an article about the AHP methodology in project area at 2001 edition. It is titled, "Application of AHP in project management," by K.M.A.S-S. Al-Harbi. This paper presents the Analytical Hierarchy Process (AHP) as a decision making method in project management. The evaluation by each section is based on the model by Fred Pyrczak (2008) in Evaluating Research in Academic Journals. This paper has an implication that evaluation method can be shown by quantitative numerical value.

  • PDF

A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project (석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안)

  • Cho, Hong-Yeon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

Benefits of Early Stakeholder Involvement in Korean Railway Infrastructure Project

  • KANG, SungWook;KIM, DongHee;YU, JaeKyun;LEE, KyungChul;MOON, DaeSup
    • The Journal of Economics, Marketing and Management
    • /
    • v.9 no.5
    • /
    • pp.15-25
    • /
    • 2021
  • Purpose: In the Korean railway infrastructure process, contractors and operators are involved at a later stage, which results in significant inefficiency. This study examines the benefits of early stakeholder involvement in Korean railway infrastructure projects and provides practical guidelines. Design, data and methodology: Literatures and foreign cases are analyzed. Building on the new product development model, we derive propositions explaining the relationship between early stakeholder involvement and the performance of Korean railway infrastructure project. Results: Major propositions include that early involvement of contractor has a positive effect on the project performance by shortening the infrastructure construction period and that early involvement of railway operator has a positive effect on the project performance by improving the effectiveness of railway infrastructure. Four requirements for the success of early stakeholder involvement are addressed. Conclusions: This study suggests that early stakeholder involvement shortens the construction period and improves railway infrastructure effectiveness. Academic contribution is to present the framework on railway infrastructure projects as holistic interactions among stakeholders. Practical contribution is to provide railway policy makers and other business practitioners with policy guidelines to improve railway infrastructure project process and to recommend an open access to relevant data.

Defining Functions for Integrated Information Management System of University Financial Support Project

  • Lee, Hae-Gun;Shin, Seong-Yoon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.10
    • /
    • pp.251-256
    • /
    • 2019
  • In this paper, we analyzed the business process and management characteristics of the university financial support project to define the function for the integrated information management system of the university financial support project. To this end, we reviewed the characteristic and business process of university financial support project and defined six common functions. In order to establish an integrated system applying the derived functions, the first things to be done need to standardize the business management system considering integration and to arrange the accounting regulations. Based on the functions and implications defined from this paper, we think that it will be helpful to design an integrated information management system for university financial support project.

Youth Leadership Training through Town Center Regeneration Project in Rural Area - Focused on the Reorganization Plan of Mie-machi Main Street, Oita - (중심지 재생사업을 통한 농촌지역 청소년의 리더십 양성 - 일본 오이타 미에마치(三重町) 중심가로 재편계획을 사례로 -)

  • Chung, Jaehoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.3
    • /
    • pp.35-47
    • /
    • 2022
  • The study is to analyze the role of highschool youth group in a rural regeneration project. The process of youth group becoming subjective in resident participation plan was classified into isolation reduction, self-awareness, perspective-taking, subjectivity practice, and opinion expression. Isolation reduction is a stage in which youth group is gradually drawn into the community from a limited society of home and school, self-awareness is a stage in which they discover their thoughts, and view perspective-taking is a stage in which they objectify themselves and surroundings through communication with other members of the region, social experiment was analyzed as a practice of subjectivity that experiences leadership guiding the local community independently, and expressing opinions is a stage of representing the region and giving responsibility for the specific issue of the implementation plan. The study is also an analysis of how residents committee, local governments, and local research institutes perform both regeneration and community revitalization in rural areas. Therefore, the analysis of the cooperative organization of these institutions was conducted simultaneously. The leadership program was effectively linked to the project of rural regeneration. Since high school students themselves are family members of the local people, the process of accepting the project is unaffected, and the feasibility of the project is also increased, such as forming a positive atmosphere for the project and easing resistance to minority opinions.

'Knowing' with AI in construction - An empirical insight

  • Ramalingham, Shobha;Mossman, Alan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.686-693
    • /
    • 2022
  • Construction is a collaborative endeavor. The complexity in delivering construction projects successfully is impacted by the effective collaboration needs of a multitude of stakeholders throughout the project life-cycle. Technologies such as Building Information Modelling and relational project delivery approaches such as Alliancing and Integrated Project Delivery have developed to address this conundrum. However, with the onset of the pandemic, the digital economy has surged world-wide and advances in technology such as in the areas of machine learning (ML) and Artificial Intelligence (AI) have grown deep roots across specializations and domains to the point of matching its capabilities to the human mind. Several recent studies have both explored the role of AI in the construction process and highlighted its benefits. In contrast, literature in the organization studies field has highlighted the fear that tasks currently done by humans will be done by AI in future. Motivated by these insights and with the understanding that construction is a labour intensive sector where knowledge is both fragmented and predominantly tacit in nature, this paper explores the integration of AI in construction processes across project phases from planning, scheduling, execution and maintenance operations using literary evidence and experiential insights. The findings show that AI can complement human skills rather than provide a substitute for them. This preliminary study is expected to be a stepping stone for further research and implementation in practice.

  • PDF

A Study on the Definition Method for Integrated Development Project using QFD (QFD를 활용한 통합된 개발프로젝트 정의 방법 연구)

  • Kim, Jin Hoon;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.63-75
    • /
    • 2012
  • For the definition of development project, this paper proposes an integrated design model for the project 3P's(Products, Process, and People) architecture solutions balancing the originating requirements as well as the design targets of product, process, and IPDT. The model is suggested to develop the integrated design method with trade-off analysis and alternatives evaluation of products, processes, and IPDT using QFD.

A Case Study of Information System Auditing of CBD Project (CBD프로젝트의 정보시스템감리 사례연구)

  • 조남재;박기호;전순천;박준호
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.2
    • /
    • pp.167-178
    • /
    • 2004
  • Different from traditional development methodologies like waterfall model, the CBD (component based development) methodology relies on a building block approach in the design and development of information system. The audit procedure and checklist for the traditional IS development methodology are required to be modified to be suitable for CBD. This research reviewed IS audit guidelines for the existing development process and analyzed multiple projects that employed the by component based development process. For the purpose of this study, we chose a governmental project and a next-generation IS project of a financial agency as sample cases. By comparing existing IS audit checklists and items actually reviewed in audit projects, this study identified appropriate check items for the CBD-centric audit program. New items were proposed as additional items such as project control in management phase, usage case and conceptual model establishment, component evaluation and design, in implementation phase, and so forth. The result of the research provides new guidelines for the audit CBD projects for the purposed of increased efficiency and qualify of application development projects.

  • PDF

A Case Study on ERP System Implementation in Samsung Display Devices Co. (삼성전관(주)의 ERP시스템 구축사례)

  • Kim, Sang-Hun
    • Korean Management Science Review
    • /
    • v.15 no.2
    • /
    • pp.91-108
    • /
    • 1998
  • Recently ERP(Enterprise Resource Planning) package has been on of important issues in developing information systems in many Korean companies. The main objectives of this study are to analyse the case of implementing ERP system in Samsung Display Devices Co. which is rated to be successful, and to derive significant implications for effective ERP implementation. First, this study focused on showing the detailed roadmap of performing ERP implementation project which largely consists of 5 stages(planning and organizing, visioning. process redesign and mapping, testing and arrangement, and installation and roll-out to overseas subsidiaries), and explaining key activities in each stage. Second, the performance of this project was evaluated on the basis of both process-centered critieria and result-centered ones. Finally, this study intended to discuss and explicate the bottlenecks and the critical success factors in implementing this project. The findings of this case study are thought not only to be useful as a practical guideline in carrying out ERP implementation project but also to provide significant basis for constructing the theoretical framework of effective ERP implementation.

  • PDF

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF