• Title/Summary/Keyword: project owner

Search Result 284, Processing Time 0.03 seconds

IMPACT OF TECHNOLOGY UTILIZATION ON PROJECT OWNER SATISFACTION

  • Li-Ren Yang;Chung-Fah Huang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.754-757
    • /
    • 2005
  • Construction firms attempt to improve project performance by adopting technology. However, the advantages gained from technology utilization are still not clear. Lack of information regarding technology benefits has resulted in industry reluctance to implement new technology. Therefore, there are needs for studies that quantify the impacts of technology utilization on project performance. An industry-wide survey was used to collect project data from 70 capital facility projects on the issue of technology usage and project owner satisfaction parameter. This paper reports on integration/automation technology usage in the Taiwanese construction industry and associated impacts on project owner satisfaction. In addition, integration and automation technology findings are presented by project phase. The analyses indicate that projects with owner satisfaction have, on average, higher levels of technology utilization than projects with owner dissatisfaction for all technology usage metrics analyzed.

  • PDF

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

Adjusting Planning Management and Control to the Owner Environment Case Study: Consultant Adjustment to the Owner Environment in Thailand

  • Sruntummakul, Apai;Leungbootnak, Narong;MIN, Vuthea
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.3
    • /
    • pp.10-17
    • /
    • 2015
  • Consultant and owner play a very important role in the construction sector which is one of the main sectors in economic development. There are many stakeholders in a construction project including but not limited to: owner, consultant, contractor, subcontractor, and supplier. The consultant is the party who is to stay in close touch with the project owner, which both consultant and owner are considered as the main key stakeholders to make the project happen. It's not a simple task for a consultant to just implement the same style of management and control within various projects that are of a different background and character of owners. Thus, the adjusting plan management and control to the owner environment has been an essential technique to drive the project to success. The objective of this paper is to identify the significant management techniques for adjusting a plan of management and control to the owner environment in Thailand. The methodology is the identification throughout the analogous to abduction from literature review and our empirical observations of Future Engineering Consultants Co, Ltd. We have been in consultation for twenty-five years (25) in Thailand with 209 projects from both public and private owners. As a result, there are (1) Project management styles, (2) Personal style, (3) Owner expectation management, (4) Scope Management, (5) Time Management, (6) Cost Management, (7) Quality Management, and (8) Environmental Management. The input are: a clear defined goal, showing respect by giving good service, maintaining high quality, keeping in touch with owners, and resources. This would give the output of the project's success by meeting the owner's expectation and requirements.

A Study on Evaluation of Construction Project Owner's Organizational Competency (건설사업 발주자 조직 역량 평가에 관한 연구)

  • Lee, Si-Wook;Woo, Sung-Kwon;Kim, Ok-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.146-155
    • /
    • 2009
  • In the construction industry, success or failure depends on the capability and role of the project owner's organization, which has an effect on the peoples' lives and national finance because of a lot of involvement from the project owner. Therefore, it is required that the project owner has the sufficient capability for the success of relevant industry and the further development of whole industry. Therefore, at the viewpoint of successful accomplishment of the construction industry, systematic and in-depth research that defines and evaluates the capability of the project owner's organization is necessary. As-Is and To-Be competency can be measured by the individual areas and elements through the survey. By evaluating these capabilities simultaneously, it is possible to assume not only the project owner's organizational competency but also constant other capabilities. It is become to make plans for strengthening the capabilities and to establish the strategy, by catching which capabilities are really necessary. It will result in positive effects on improving the capabilities of the project owner's organizational competency.

Requiremental Function Method based Owner's Requirement in VE Process Application at Planning Stage (기획단계 발주자 요구사항 기반 Requiremental Function Method VE 적용)

  • Park, In-Ji;Son, Myung-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.123-125
    • /
    • 2012
  • It is the important accurately to identify the needs of our customers in order to success the project. Requirements in the early stages of business is very abstract or not quantitative, and that will cause problems such as cost or schedule changes. Particularly many people are likely to prefer the early stages of the project, because the time of applying VE related cost savings is important. Owner's requirement analysis for project success in the VE process does not easy, and specific ongoing management of the requirement is difficult. Therefore, the analysis and the application of owner's requirements is limited in project process. The purpose of this study is proposed to the RFM technique to supplement the functional analysis on the basis owner's requirements analysis in planning a building project.

  • PDF

DEVELOPMENT OF BIM-BASED DECISION-MAKING SUPPORT SYSTEM FOR APARTMENT REMODELING

  • Dong-Gun Lee;Sik Kim;Hee-Sung Cha;Ju-Yeoun Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1117-1123
    • /
    • 2009
  • Compared with other industries, the construction Industry has many parties(A/E/C) as well as many types of construction activities. Especially, as for the remodeling project, the owner group the remodeling union consists of various stakeholders union and requiring the additional activities of demolition except for the existing new building construction project. Like this, the remodeling project has its own characteristics different from a new building construction project. As for the remodeling project, the Owner's decision making for a remodeling alternative has to be preceded, and other parties are required to propose a remodeling alternative which satisfies the Owner's requirements. However, because of time constraints, many types of problems occur during the decision-making process. In consideration of this, in this research, the authors would like to suggest a decision-making support system to help the Owner's decision-making in the early stage of a remodeling project. For this paper purpose of a remodeling decision-making framework based on Building Information Modeling(BIM) was suggested to help with the Owner's decision-making for each remodeling item and the decision-making support system was evaluated through Case Study.

  • PDF

A Study for the Development of Writing National Standard Specifications, Owner′s Standard Specifications and Project Specifications (표준$\cdot$전문$\cdot$공사시방서의 작성방법 개선방안에 관한 연구)

  • Koo Jai Dong;Kim Tae Song
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.81-88
    • /
    • 2000
  • Recently the Government has classified the construction specifications into three types such as national standard specifications, owner's standard specifications and project specifications, by the revision of the Law of Construction Technology Management. And the Government provided that project owner shall use the project specifications that are written by excerption from, revision of, and supplement to the national standard specifications or the owner's standard specitications etc.. The present study suggests the writing way of national standard specifications, owner's standard specifications and project specifications in these situations.

  • PDF

A STUDY ON THE DEVELOPMENT OF A COST MODEL BASED ON THE OWNER'S DECISION MAKING AT THE EARLY STAGES OF A CONSTRUCTION PROJECT

  • Choong-Wan Koo;Sang H. Park;Joon-oh Seo;TaeHoon Hong;ChangTaek Hyun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.676-684
    • /
    • 2009
  • Decision making at the early stages of a construction project has a significant impact on the project, and various scenarios created based on the owner's requirements should be considered for the decision making. At the early stages of a construction project, the information regarding the project is usually limited and uncertain. As such, it is difficult to plan and manage the project (especially cost planning). Thus, in this study, a cost model that could be varied according to the owner's requirements was developed. The cost model that was developed in this study is based on the case-based reasoning (CBR) methodology. The model suggests cost estimation with the most similar historical case as a basis for the estimation. In this study, the optimization process was also conducted, using genetic algorithms that reflect the changes in the number of project characteristics and in the database in the model according to the owner's decision making. Two optimization parameters were established: (1) the minimum criteria for scoring attribute similarity (MCAS); and (2) the range of attribute weights (RAW). The cost model proposed in this study can help building owners and managers estimate the project budget at the business planning stage.

  • PDF

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.