• Title/Summary/Keyword: program block

Search Result 505, Processing Time 0.026 seconds

Development of the Program(FDS2EXODUS) for Generating Hazard condition file of Building-EXODUS code based on the FDS Fire-simulation Data (화재모사전용 FDS code의 계산값을 이용하여 피난해석 BuildingEXODUS code의 피난의 환경조건 파일을 생성하는 프로그램(FDS2EXODUS) 개발)

  • Kim, H.B.;Jang, Y.J.;Jung, W.S.;Park, W.H.;Lee, D.H.
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.570-575
    • /
    • 2009
  • In this paper shows the development of the Program(FDS2EXODUS) for Generating Hazard condition file of BuildingEXODUS code based on the FDS Fire-simulation Data. The program were applied with numerical method to translate from FDS to BuildingEXODUS. Using both single or multi block meshes of FDS get to be possible. For application of fire effect, the fire data were loaded directly to BuildingEXODUS in the case of FDS code with using this Program(FDS2EXODUS). It was very convenient to input to BuildingEXODUS and could be reduced the procedure of egress simulation from fire disaster.

  • PDF

Study on the maintenance period allocation method for railway signal equipment (철도신호설비 유지보수주기 할당에 관한 연구)

  • Lee, Kang-Mi;Shin, Duck-O;Lee, Jae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.647-652
    • /
    • 2008
  • Railway signal system has been more complex, larger and required high reliability. So, maintenance by experience must be changed to optimize maintenance program or introduced systematic method for estabilish new maintenance program. In this paper, we introduced the maintenance period decision method which are Age based method and Block replacement method based on the failure distribution for the equipment. So, we allocated optimum maintenacne period for the railway signal equipment using block replacement method.

  • PDF

Bending and Bonding Strength Performances of Larix Block-glued Glulam (낙엽송 블록접착집성재의 접착 및 휨 강도 성능)

  • Lee, In-Hwan;Hong, Soon-Il
    • Journal of the Korean Wood Science and Technology
    • /
    • v.44 no.3
    • /
    • pp.315-322
    • /
    • 2016
  • Block-glued glulam is a structural material that can be used as a construction member of a large-section wooden building, which is produced by edgewise bonding of two or more glulam beam elements. The edgewise bonding performance of the block-glued glulam was examined through delamination test and block shear strength test. According to the test results, the block-glued glulam that was manufactured with 1.5 MPa of compressive pressure after applying $500g/m^2$ of Resorcinol adhesive showed the best edgewise bonding performance. The block-glued glulam produced in a good edgewise bonding condition was compared with a control glulam with the same section modulus for bending strength performance. The modulus of elasticity (MOE) in bending was similar to that of the control glulam. The modulus of rupture (MOR) of the block-glued glulam was higher by 27% than that of the control glulam. No interfacial failure or cohesive failure were observed in the edgewise bonding layer.

Design and Implementation of OSEK/VDX Development Tool for Automotive Applications (OSEK/VDX 기반의 차량 전장용 응용개발도구 설계 및 구현)

  • Ahn, SungHo;Kim, JaeYoung;Kim, GwangSu
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.4 no.2
    • /
    • pp.84-89
    • /
    • 2009
  • This paper describes the development tool for applications of automotive electronic control unit based on OSEK/VDX. This development tool has a plug-in structure and is written in Java language, because of being based on Eclipse CDT. And also this development tool has another functionality of expansion, which means a special function block can be easily adopted in this development tool. Currently, this development tool consists of five blocks, which are integrated development environment block, fusing program block, system generation block, debugger block, and cross-compiler toolchain block. They have relationship between each other and work for developing OSEK/VDX-based applications. In this paper, we show the functionality of each block of this development tool and its implementation.

  • PDF

The Development of Young Children's Constructive Play: An Analysis of Block Play (3, 4, 5세 아동의 구성놀이 발달에 관한 연구 : 놀이의 질에 대한 분석)

  • Koo, Hyun Ah;Lee, Jong Hee
    • Korean Journal of Child Studies
    • /
    • v.19 no.1
    • /
    • pp.155-167
    • /
    • 1998
  • The purpose of this study was to analyze the quality of the constructive play of 3, 4 and 5 year-old children. The researchers used unit blocks as the instrument because they are the most representative examples of constructive play materials. The subjects were 73 children enrolled in a half-day early childhood education program. The children's block play was videotaped 8 times, for a total of 330 minutes. The videotapes were transcribed and assessments were made on the children's 233 constructions in terms of the developmental stage of block play, the variety of materials used, play duration, and play intensity. The data were analyzed through two-way ANOVA to check age and sex differences. The results showed that children's developmental stages of block play were low on the average and that girls did not show an active interest in block play. The results also implied that block play developed by play experience rather than by age. Therefore, this study was interpreted to highlight the importance of teachers' understanding, planning, and mediation of block play in order to induce high-quality constructive play.

  • PDF

A Comparative Analysis of Displacement Measurement of the Earth Surface by Load for Root Anchor Block and Rectangle Anchor Block (기초근가와 기존근가의 하중에 따른 변위 비교분석)

  • Mun, Sung-Won;Kim, Jeom-Sik;Kim, Do-Young;Park, Yong-Beom
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.6
    • /
    • pp.863-869
    • /
    • 2013
  • In this paper, we compared and analyzed for safety 1.2m rectangular anchor block and arch-type root anchor block. First, numerical analysis was performed three-dimensional nonlinear method by numerical model test using finite element analysis program "Visual FEA". Then, measure displacement of the surface of the earth after construct each anchor block at 14M electric pole and increase loads through field verification tests for safety evaluation.

Future Directions of the Integrated Health Promotion Programs in Health Center (보건소 통합건강증진사업의 발전 방향)

  • Lee, Ju-Yul
    • Korean Journal of Health Education and Promotion
    • /
    • v.30 no.4
    • /
    • pp.1-7
    • /
    • 2013
  • Objectives: This paper reviews the integrated health promotion program in health center to analyse the problems and to provide the future directions aiming to health promotion block grants. Methods: The guidebook for the integrated health promotion program published by the Minister of Health and Welfare were reviewed in this study. And also the empirical results and theoretical considerations were used in making future directions. Results and Conclusion: This paper suggested four improvement directions as follows; first, the legal review committee is needed to approve when the central government change the way of health promotion program in health center. Second, the required programs should be replaced by an integrated outcom evaluation indicators. Third, the central government should strengthen the capacity of local government. And finally, visiting training should be conducted each health center.

Automation of block assignment planning using a diagram-based scenario modeling method

  • Hwang, In Hyuck;Kim, Youngmin;Lee, Dong Kun;Shin, Jong Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.6 no.1
    • /
    • pp.162-174
    • /
    • 2014
  • Most shipbuilding scheduling research so far has focused on the load level on the dock plan. This is because the dock is the least extendable resource in shipyards, and its overloading is difficult to resolve. However, once dock scheduling is completed, making a plan that makes the best use of the rest of the resources in the shipyard to minimize any additional cost is also important. Block assignment planning is one of the midterm planning tasks; it assigns a block to the facility (factory/shop or surface plate) that will actually manufacture the block according to the block characteristics and current situation of the facility. It is one of the most heavily loaded midterm planning tasks and is carried out manually by experienced workers. In this study, a method of representing the block assignment rules using a diagram was suggested through analysis of the existing manual process. A block allocation program was developed which automated the block assignment process according to the rules represented by the diagram. The planning scenario was validated through a case study that compared the manual assignment and two automated block assignment results.

A Study on System of Local TV Broadcasting Station - Focusing on the Program Production System of the Local Terrestrial TV Broadcasters - (TV프로그램 제작관련 소요공간의 배치계획에 대한 연구 - 지상파TV 지방방송사의 자체TV프로그램 제작 운영체계를 중심으로 -)

  • Hwang, Dae-Young;Lee, Sang-Ho
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2007.05a
    • /
    • pp.114-118
    • /
    • 2007
  • The space for production, such as studios and control rooms, is a space for TV program production, which is the main function of broadcast. A block planning for such space should be carefully designed, because it can significantly affect the efficiency of production, as well as future productivity and the development and expandability of production. From the results of comparative analysis of 7 local terrestrial broadcasters built since the late 1990s, this study will. propose an ideal block planning for the future construction of local terrestrial broadcasters. Also, the results can be used a basic data when constructing new buildings for local broadcasters.

  • PDF