• Title/Summary/Keyword: process risk assessment

Search Result 692, Processing Time 0.024 seconds

A Study on the Fire Risk Assessment : Based on the Proposal of a Fire Risk Assessment Processor Considering the Reality in Korea (화재위험도 평가에 대한 연구 : 국내 현실을 고려한 화재위험도 평가 프로세서 제안을 중심으로)

  • Lee, Jong Hwa
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.1
    • /
    • pp.57-64
    • /
    • 2021
  • Recently, advanced countries assessment the risk of fire to prevent large-scale damage to high-rise buildings, In addition, performance-Based design, which is a fire risk assessment, is being conducted in Korea to prevent massive damage to high-rise buildings. However, unlike advanced countries, fire risk assessment in Korea is subject to fire risk assessment only for objects subject to consent from fire-fighting facilities such as building permits, When building engineers and fire-fighting engineers assessment the risk of fire, It has always been discussed because the results vary depending on which part of the evaluation is focused between economic feasibility and safety. Therefore, in this study, we would like to propose a fire risk assessment process suitable for domestic conditions by comparing the process of performance-based design, which is a domestic fire risk assessment, and the process of Iso/TC 16732 which is an overseas fire risk assessment.

Regulatory Aspect of Risk Assessment and Management

  • Lee, Hyomin;EunkyungYoon;Jeeyeun Han
    • Toxicological Research
    • /
    • v.17
    • /
    • pp.17-24
    • /
    • 2001
  • Risk assessment is useful tool making good decisions on the risks of certain hazardous com-pound and suggests safe margin through scientific process using toxicological data, statistical tool, exposure value and relevant variants. The goal of risk management is to protect the public health from hazardous compound based on result of risk assessment having reality. For the suggestion of exact man-aging information, risk assessment must be designed to represent a "plausible estimate" of the exposure to the individuals and to minimize uncertainty. Risk assessment methodology and knowledge are expected to change more rapidly than before and up-to-date methodology should be applied in regulatory aspects through the Agency. For the useful application of risk assessment, the communication between the risk assessor and the risk manager is needed before the initiation of the risk assessment and upon its completion. Generally, the risk assessment itself as a practical tool in the regulatory decision making process would be regarded with social economic impact.ic impact.

  • PDF

Application of the Risk-Based Analysis to EIA (환경영향평가에 있어 위해성분석 기법의 도입)

  • Chung, Yong
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.3
    • /
    • pp.1-8
    • /
    • 1995
  • In generally speaking, the purpose of Environmental Impact Assessment(EIA) is to give the environment its due place in the decision-making process by clearly ealuating the environmental consequence of a proposed activity before action is taken. The introduction of conventional EIA is to be seen as an end product of a very long evolutionary process, starting with rudimentary but evolving pollution control measures for air, water, noise, land and chemicals, each governed by separate, and separately administered pieces of legislation. In EIA process, the measures of status, scoping, proposed mitigation and communication have not been very quantitative in their significancy. Of course, the determinations have uncertainity in the implications for significant impacts. To improve the determination of significant impacts, some more comprehensive methodologies of EIA has been proposed with the concepts of risk analysis in the proposed projects. The concepts of risk analysis has been introduced to the expression of human health impairment due to environmental pollutants since the early 1980's. The risk analysis being meant by the statistical significance of impact has a process quantitatively considering uncertainities and importances of ecological systems and human health as well. The process of risk analysis shows assessment, doseresponse in toxicity, exposure assessment and risk characterization. With the risk assessment, it could be suggested for the proper measurements against their anticipated risk in the EIA. This paper deals the priciples developing process and application of the risk-based analysis in EIA.

  • PDF

Comprehensive Assessment on Risk Factors using Fuzzy Inference in Decommissioning Process (퍼지추론을 이용한 해체공정 중 리스크 요인의 통합 평가)

  • Lim, Hyeon Kyo;Kim, Hyunjung
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.4
    • /
    • pp.184-190
    • /
    • 2014
  • Decommissioning process of nuclear facilities consist of a sequence of problem solving activities, because there may exist not only working environments contaminated by radiological exposure but also industrial hazards such as fire, explosions, toxic materials, and electrical and physical hazards. Therefore, not a few countries in the world have been trying to develop appropriate counter techniques in order to guarantee safety and efficiency of the process. In spite of that, there still exists neither domestic nor international standard. Unfortunately, however, there are few workers who experienced decommissioning operations a lot in the past. As a solution, it is quite necessary to utilize experts' opinions for risk assessment in decommissioning process. As for an individual hazard factor, risk assessment techniques are getting known to industrial workers with advance of safety technology, but the way how to integrate those results is not yet. This paper aimed to find out an appropriate technique to integrate individual risk assessment results from the viewpoint of experts. Thus, on one hand the whole risk assessment activity for decommissioning operations was modeled as a sequence of individual risk assessment steps which can be classified into two activities, decontamination and dismantling, and on the other, a risk assessment structure was introduced. The whole model was inferred with Fuzzy theory and techniques, and a numerical example was appended for comprehension.

Microbial Risk Assessment (미생물학적 위해성 평가)

  • 이건형
    • Korean Journal of Microbiology
    • /
    • v.37 no.2
    • /
    • pp.101-108
    • /
    • 2001
  • Risk assessment defines as the process of estimating both the probability that an event will occur and the probable magnitude of its adverse effects. Chemical or microbial risk assessment generally follows four basic steps, that is, hazard identification, exposure assessment, dose-response assessment, and risk characterization. Risk assessment provides an effective framework for determining the relative urgency of problems and the allocation of resources to reduce risks. Using the results of risk analyses, we can target prevention, reme-diation, or control effects towards areas, sources, or situations in which the greatest risk reductions can be achieved with resources available. Risk assessment is also used to explain chemical and microbial risks as well as ecosystem impacts. Moreover, this process, which allows the quantitation and comparison of diverse risks, lets risk managers utilize the maximum amount of complex information in the decision-making process. This information can also be used to weigh the cost and benefits of control options and to develop standards or treatment options.

  • PDF

Comparative Study of Regional-scale Ecological Risk Assessment used in Developed Countries (지역단위 생태위해성평가 선진국사례 분석)

  • Shin, Yu-Jin;Lee, Woo-Mi;An, Youn-Joo
    • Environmental Analysis Health and Toxicology
    • /
    • v.25 no.2
    • /
    • pp.169-177
    • /
    • 2010
  • Ecological risk assessment (ERA) has been used to establish environmental quality standards or evaluate ecological risk in site-specific areas. The scope of ERA was expanded based on regions, and the concept of regional-scale ecological risk assessment was recently introduced in developed countries. In the present study, regional ERA approaches of relative risk model (RRM), contaminants in aquatic and terrestrial ecosystems (CATS) model, and procedure for ecological tired assessment of risks (PETAR) in advanced countries were extensively investigated. Regional ERA was compared with traditional ERA process. Stressors, receptor and response in traditional ERA were replaced with sources of stressors, habitats, and ecological impacts, respectively in regional ERA. This study introduces the concept and assessment process of regional ERA, and provides a wide perspective how the relative ERA could be applied in Korean ecosystem.

Clinical Preventive Dental and Dental Hygiene Practice by Caries Management by Risk Assessment (CAMBRA) (Caries Management by Risk Assessment (CAMBRA) 모형에 따른 임상 예방치과 및 치위생 진료)

  • Cho, Young-Sik
    • Journal of dental hygiene science
    • /
    • v.12 no.6
    • /
    • pp.545-557
    • /
    • 2012
  • Dental caries is biofilm induced disease throughout life and is recognized significant oral health problem. This article reviewed new trends in dental caries management by risk assessment, including history, protocol/guideline, and collaborated model. Dental caries prevention and treatment according to caries management by risk assessment (CAMBRA) model is patient-centered, risk-based, evidence-based practice. Team approach is necessary and clinician need to integrate science, practice and product. Dental hygienist take a important role in implementing CAMBRA. CAMBRA model could be incorporated into clinical dental hygiene education based on dental hygiene process of care as standard of dental hygiene practice and education. Dentist and dental hygienist able to provide scientific and ethical care managing dental caries by risk assessment.

An Evaluation of the Quantitative Risk of Plastic Process Manufacturing Industries by Means of the 4M Method

  • Lee, Dong-Ho;Kim, Jong-In
    • International Journal of Safety
    • /
    • v.6 no.2
    • /
    • pp.8-12
    • /
    • 2007
  • This study includes a case study among plastic process manufacturing companies, based on which, the currently used 4M method is applied in terms of machine, media, man, and management, to conduct quantitative risk evaluation, and thus to contribute to reducing human and material loss as well as preventing accidents in industrial fields. The result of this study is analyzed based on the 4M-risk assessment to find out the hazardous risk elements, and the quantitative evaluation made it predictable the value of risk(frequency $\times$ intensity) in such classified levels as serious risk, critical risk, and intolerable risk. Further, Among the businesses with hazardous risk elements and high frequency of industrial disaster, risk analysis was conducted for each process, and as a result, 38 cases among 76, including those of serious risk, critical risk, and intolerable risk, were improved, and the risk was reduced. Besides, it is thought that with the engineering approach with 4M-Risk Assessment, the attempt to improve safety level contributes to prevention of accidents.

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.