• 제목/요약/키워드: process of completion

검색결과 582건 처리시간 0.029초

노년 초기 재혼자의 결혼성립 과정과 결혼만족에 관한 연군 (The Marital Process of Completion and Marital Satisfaction of Remarried People at Early Old Age)

  • 최영아
    • 대한가정학회지
    • /
    • 제43권5호
    • /
    • pp.15-42
    • /
    • 2005
  • The Purpose of this study was to explore the relation between the marital process of completion and marital satisfaction. The Data was collected by in_depth personal interview. Fifteen respondents who had been remarried for over 5 years were chosen by a researcher independently from a province in South Korea and comprised 8 females(over 55 ages) and 7 males(over 60 ages ). The Results were as fellows: 1. The Remarriage process of completion was an important process for arranging a marriage with a partner. This process was reached through the remarriage motive of the remarried person who was chosen by introduction of a family member or a friend and through meeting with a familiar friend. The factors were remarriage motive, meeting with a spouse, children's response about remarriage, and remarriage decision. 2. The success of the marital process of completion depended on a support from families and friends in order to develop their conjugal relation. Therefore conjugal relation was an important relation in marital satisfaction. Particularly, the parents-child relation, relation between a stepbrother and stepsister, and social support for remarried persons were important relations in their marital satisfaction.

초저지연 저장장치를 위한 적응형 폴링 선택 기법 (An Adaptive Polling Selection Technique for Ultra-Low Latency Storage Systems)

  • 천명준;김윤아;김지홍
    • 대한임베디드공학회논문지
    • /
    • 제14권2호
    • /
    • pp.63-69
    • /
    • 2019
  • Recently, ultra-low latency flash storage devices such as Z-SSD and Optane SSD were introduced with the significant technological improvement in the storage devices which provide much faster response time than today's other NVMe SSDs. With such ultra-low latency, $10{\mu}s$, storage devices the cost of context switch could be an overhead during interrupt-driven I/O completion process. As an interrupt-driven I/O completion process could bring an interrupt handling overhead, polling or hybrid-polling for the I/O completion is known to perform better. In this paper, we analyze tail latency problem in a polling process caused by process scheduling in data center environment where multiple applications run simultaneously under one system and we introduce our adaptive polling selection technique which dynamically selects efficient processing method between two techniques according to the system's conditions.

선박 물류 프로세스의 실시간 서비스 완료시간 예측에 대한 연구 (Real-time Estimation on Service Completion Time of Logistics Process for Container Vessels)

  • 윤신휘;하병현
    • 한국전자거래학회지
    • /
    • 제17권2호
    • /
    • pp.149-163
    • /
    • 2012
  • 물류 시스템은 다양한 프로세스에 걸친 한정된 자원들의 작업을 통해 고객에게 서비스를 제공한다. 이와 같은 복잡한 환경에서 높은 서비스 수준을 유지하기 위해서는 프로세스 진행 상황에 대한 실시간 모니터링과 그를 통한 성과 달성도의 지속적인 관리가 필수적으로 요구된다. 본 연구에서는 컨테이너 터미널을 대상으로 선박 물류 프로세스의 서비스 완료시간을 예측하는 방법론을 제시한다. 이를 위해 먼저 선박에서 컨테이너를 싣고 내리는 프로세스에 영향을 미치는 요인을 파악한다. 그리고, 확인된 요인들 중 영향 정도를 직접적으로 측정하기 어려운 것에 대해 정량적인 값을 추정하는 방안을 개발한다. 서비스 완료 시간에 대한 실시간 예측은 의사결정 나무를 사용한다. 과거 프로세스 진행 이력을 바탕으로 의사결정 나무를 학습시킨 후, 특정 시점에서 실시간 요인의 상태를 이용하여 서비스 완료시간을 예측한다. 컨테이너 터미널 시뮬레이션 모형을 활용하여 본 연구에서 제시하는 방법론을 검증하였다.

농촌마을종합개발사업 준공 권역의 운영 실태에 관한 고찰 - 수문·오봉·모평권역을 중심으로 - (Study on the Operational Status of the Comprehensive Rural Village Development Project Completion Area - Focused on Sumun, Obong and Mopyeong Areas -)

  • 양원식;최영완;김영주
    • 농촌계획
    • /
    • 제30권1호
    • /
    • pp.67-79
    • /
    • 2024
  • The Comprehensive Rural Village Development Project, a resident-led bottom-up regional development project, began in 2004. This study investigated difficulties and problems in the operation process after the completion of the project, and future improvement plans, through in-depth interviews with the former and current chairman of the steering committee, steering committee members, and office managers, targeting three regions in Jeollanam-do, 15 years after the completion of the project. As a result of the survey and analysis, it was effective in improving the living environment and characteristics of each village and revitalizing the area. And while there were well-run facilities depending on the type of project, there were also many idle facilities. In the case of communal facilities, there was a high possibility of problems in operation and management when the scale of the new building was large. Conflicts occurred between villages in the process of independently operating the area after the completion of the project. Therefore, it is necessary to provide an S/W project program to prepare for after completion. Local governments need to utilize City and County Capacity Enhancement Projects to support regional leaders to participate in educational programs after completion and provide guidance and supervision for village operations.

임도 준공도면의 수평위치 정확도 평가에 관한 연구 (Evaluation of Horizontal Position Accuracy in Forest Road Completion Drawing)

  • 김명준;권형근;최윤호;염인환;이준우
    • 농업과학연구
    • /
    • 제37권3호
    • /
    • pp.471-479
    • /
    • 2010
  • Forest roads of 16,424km have been constructed as infrastructure for efficient management of forest. The demand of forest road have been also increased steadily with SOC conception for forest management and wood production. But, accuracy verification by completion drawing of forest road needed aspects extration of geographic information to sound like forest road construction and completion drawing. However, verification for completion drawing has not ascertained. This study carried out the evaluation for position accuracy about constructed forest road in Chungcheongnam-do for evaluating horizontal position accuracy of completion drawing of forest road. In result, first of distance of completion drawing and real route designed completion drawing longer than the real route as Gongju 83m, Seosan 66m, Nonsan 27m and Dangjin 19m, respectively. Second, RMSE by point-correspondence was 11m~14.7m, buffering analysis appeared difference of 18~24m. Finally, index of shape was the similar completion and real route through 6.5~7.4 and data information of forest road corresponds to be perfect. For such reasons, the existing completion drawings have a problem that it cannot use graphic information for drawing digital map according to the regulation, and there is an urgent need for improvement to solve this problem in the process of design and construction.

Recovering Incomplete Data using Tucker Model for Tensor with Low-n-rank

  • Thieu, Thao Nguyen;Yang, Hyung-Jeong;Vu, Tien Duong;Kim, Sun-Hee
    • International Journal of Contents
    • /
    • 제12권3호
    • /
    • pp.22-28
    • /
    • 2016
  • Tensor with missing or incomplete values is a ubiquitous problem in various fields such as biomedical signal processing, image processing, and social network analysis. In this paper, we considered how to reconstruct a dataset with missing values by using tensor form which is called tensor completion process. We applied Tucker factorization to solve tensor completion which was built base on optimization problem. We formulated the optimization objective function using components of Tucker model after decomposing. The weighted least square matric contained only known values of the tensor with low rank in its modes. A first order optimization method, namely Nonlinear Conjugated Gradient, was applied to solve the optimization problem. We demonstrated the effectiveness of the proposed method in EEG signals with about 70% missing entries compared to other algorithms. The relative error was proposed to compare the difference between original tensor and the process output.

갑상선엽절제 후 이차 근치엽절제술을 시행받은 분화성 갑상선암종 환자 23예에 대한 임상적 평가 (Clinical Analysis of Completion Thyroidectomy in Differentiated Thyroid Carcinoma)

  • 권순영
    • 대한두경부종양학회지
    • /
    • 제17권1호
    • /
    • pp.38-41
    • /
    • 2001
  • Background and Objectives: Thyroid nodules can be diagnosed by FNAB, neck sonography, CT scan, or frozen section with relative accuracy. But some cases, which show no malignancy with those methods, are proved differentiated carcinomas on permanent sections. These false negative results of those diagnostic methods pose difficulties in the surgeon's decision-making process. We analyzed completion thyroidectomies retrospectively in order to make a treatment guideline for thyroid nodules. Materials and Methods: During the last six years, we performed 243 thyroid lobectomies, no evidence of malignancy with preoperative or intraoperative diagnostic methods at the Department of Otolaryngology-Head and Neck Surgery, Ansan and Anam Korea University Hospital. Among these cases, 23 patients (male 6, female 17, mean age 33.4 year old) were proved differentiated thyroid carcinomas on permanent section and we performed completion thyroidectomies. Results: Preoperative FNAB showed seven cases of nodular hyperplasia, 11 cases of follicular adenoma, and five cases of inadequate specimen. Among total 15 cases on frozen section, five cases were nodular hyperplasias, and 10 cases were follicular adenomas. Pathologic results of the permanent section were six cases of papillary cell carcinoma and 17 cases of follicular cell carcinoma. Completion thyroidectomy was performed on all these cases. Conclusion: FNAB and frozen section cannot be sufficient to make the diagnosis of thyroid nodule, we consider that completion thyroidectomy should be performed at the moment with malignant evidence on permanent section.

  • PDF

The Improvement and Completion of Outcome index: A new assessment system for quality of orthodontic treatment

  • Hong, Mihee;Kook, Yoon-Ah;Kim, Myeng-Ki;Lee, Jae-Il;Kim, Hong-Gee;Baek, Seung-Hak
    • 대한치과교정학회지
    • /
    • 제46권4호
    • /
    • pp.199-211
    • /
    • 2016
  • Objective: Given the considerable disagreement between the Peer Assessment Rating (PAR) index and the American Board of Orthodontics Cast-Radiograph Evaluation, we aimed to develop a novel assessment system-the Improvement and Completion of Outcome (ICO) index-to evaluate the outcome of orthodontic treatment. Methods: Sixteen criteria from 4 major categories were established to represent the pretreatment malocclusion status, as well as the degree of improvement and level of completion of outcome during/after treatment: dental relationship (arch length discrepancy, irregularity, U1-SN, and IMPA); anteroposterior relationship (overjet, right and left molar position, ANB); vertical relationship (anterior overbite, anterior open-bite, lateral open-bite, SN-MP); and transverse relationship (dental midline discrepancy, chin point deviation, posterior cross-bite, occlusal plane cant). The score for each criterion was defined from 0 or -1 (worst) to 5 (ideal value or normal occlusion) in gradations of 1. The sum of the scores in each category indicates the area and extent of the problems. Improvement and completion percentages were estimated based on the pre- and post-treatment total scores and the maximum total score. If the completion percentage exceeded 80%, treatment outcome was considered successful. Results: Two cases, Class I malocclusion and skeletal Class III malocclusion, are presented to represent the assessment procedure using the ICO index. The difference in the level of improvement and completion of treatment outcome can be clearly explained by using 2 percentage values. Conclusions: Thus, the ICO index enables the evaluation of the quality of orthodontic treatment objectively and consecutively throughout the entire treatment process.

구조 방정식 모형 구축에 관한 실증적 고찰

  • 함형범;안창호
    • 한국수학사학회지
    • /
    • 제17권1호
    • /
    • pp.109-118
    • /
    • 2004
  • This study estimated direct factors that have effect to completion degree of game, and we constructs structural equation model that can evaluate completion degree of game using empirical analysis. For it, we obtained weight of components of game development by eigenvector method for analytic hierarchy process. Using calculated weight, we also let that components of game development is observating variable of X, and genre of game is observating variable of Y. And we constructs structural equation model with LISREL program

  • PDF

이머징 마켓에 대한 전력산업 수출화전략과 프로젝트 파이낸싱 (The Relationship between Project Financing and Exportation Strategy towards Emerging Market in Electric Power Industry)

  • 이근대;이창호
    • 한국기술혁신학회:학술대회논문집
    • /
    • 한국기술혁신학회 2001년도 춘계학술대회:발표자료
    • /
    • pp.557-572
    • /
    • 2001
  • This study tries to analyze the possibility of application of project financing to electricity industry and analyze the management of risks happening in the process of foreign project procurement and construction. Those are based on the trends and analysis of project financing in foreign projects. Risks are 'classified as risks before completion of projects and risks after completion. Project financing is key element of exportation and financial strategies and activation of project financing may provide the acceleration of the efficient financial market.

  • PDF