• Title/Summary/Keyword: process management system

Search Result 7,260, Processing Time 0.044 seconds

A Study of Next-generation Electronic Records Management Redesign (차세대 전자기록관리 재설계 과제 연구)

  • Ju, Hyun Mi;Yim, Jin Hee
    • The Korean Journal of Archival Studies
    • /
    • no.54
    • /
    • pp.151-178
    • /
    • 2017
  • The purpose of this study is to identify the problems of electronic records management in the records management field and to develop a new electronic records management system that can cope with the rapidly changing records production and management environment, which is rapidly changing because of the introduction of new IT. It is time to design the next-generation records management system in all areas of process, system, and infrastructure to meet the new government record management innovation. In this point of view, the right value and direction of the next-generation records management system are determined, and the problems of the process, system, and infrastructure are identified and settled.

Design Management System for Collaborative Engineering (협업 공학을 위한 설계업무 지원시스템)

  • 박홍석;여승훈;최흥원;이규봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.938-941
    • /
    • 2002
  • Small and medium enterprises have various problems that is the distributed process state, the method of receipt from custom, documentation change and so on related to the existing product design process. For that reason they require systematic analysis and smooth progress f3r each product design process. The solution is in this issue development of design management system far collaborative engineering. The aim of this system is to analyze the wrong existing process and to standardize product design process. Since this system is a server on web based Database with web identification, the client can overcome the limit of time, place and resource duplication. As a result product design process gets the greatest of efficiency in the various aspects.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

Creation and Use of Process oriented Knowledge for Effective FRACAS (효과적인 FRACAS 운용을 위한프로세스 지식의 생성과 활용)

  • Lee, Jae-Hoon;Yoo, Ki-Hoon;Kim, Ki-Young;Seol, Dong-Jin;Jang, Joong-Soon
    • Journal of Applied Reliability
    • /
    • v.8 no.3
    • /
    • pp.113-124
    • /
    • 2008
  • In reliability engineering, failure reporting, analysis, and corrective action system (FRACAS) is an useful tool for effective failure reporting and related operations. FRACAS is generally mainly focused on implementation of its closed-loop process, but also includes various related information which has to be effectively managed such as failure types, failure modes, failure mechanisms, and corrective actions. In this study, we adopt and utilize the concept of process knowledge, and create it through abstraction of FRACAS information. At each step of closed-loop process, the necessary type of knowledge, priority and usability are clearly defined. This study also suggests corresponding management tools such as business process management system, knowledge management system, and their key elements and functions to deal with process knowledge. A prototype system using simple closed-loop process with its process knowledge is presented to demonstrate the feasibility of the proposed work.

  • PDF

Development of the ISEP Based on Systems Engineering (시스템엔지니어링을 적용한 ISEP 개발에 관한 연구)

  • Byun, BoSuk;Choi, YoChul;Park, Young T.
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.4
    • /
    • pp.725-735
    • /
    • 2013
  • Purpose: The purpose of this study is to propose an Integrated Safety Evaluation Process (ISEP) that can enhances the safety aspect of the safety-critical system. This process utilizes the advantages of the iterative Systems Engineering process combined with the safety assessment process that is commonly and well defined in many standards and/or guidelines for railway, aerospace, and other safety-critical systems. Methods: The proposed process model is based on the predefined system lifecycle, in each phase of which the appropriate safety assessment activities and the safety data are identified. The interfaces between Systems Engineering process and the safety assessment process are identified before the two processes are integrated. For the integration, the elements at lower level of Systems Engineering process are combined with the relevant elements of safety assessment process. This combined process model is represented as Enhanced Functional Flow Block Diagram (EFFBD) by using CORE(R) that is commercial modelling tool. Results: The proposed model is applied to the lifecycle and management process of the United States aircraft system. The US aircraft systems engineering process are composed of twelve key elements, among which the requirements management, functional analysis, and Synthesis processes are considered for examplenary application of the proposed process. To synchronize the Systems Engineering process and the safety assessment process, the Systems Engineering milestones are utilized, where the US aircraft system has thirteen milestones. Taking into account of the nine steps in the maturity level, the integrated process models are proposed in some phases of lifecycle. The flows of processes are simulated using CORE(R), confirming the flows are timelined without any conflict between the Systems Engineering process and the safety assessment process. Conclusion: ISEP allows the timeline analysis for identifying activity and data flows. Also, the use of CORE(R) is shown to be effective in the management and change of process data, which helps for the ISEP to apply for the development of safety critical system. In this study, only the first few phases of lifecyle are considered, however, the implementation through operation phases can be revised by combining the elements of safety activities regarding those phases.

Construction of Production System for The Automotive Components at Press processes (자동차 부품 프레스공정의 생산시스템 구축)

  • Shon, Jae-yul
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.8 no.3
    • /
    • pp.54-61
    • /
    • 2009
  • General manufacturing process of the manufacturing time and manufacturing process problems have a problem. In the past, in the manufacturing process the data by hand has been. Therefore, the production performance management information, and materials input, output information, equipment information of the failure of the management problems emerged. Through this research, improvements in real-time production information to collect distribution and overall productivity will increase the efficiency of the system. the production process to improve the quality of management, efficient production methods are presented. is a stable quality control. POP system The new building should be. This is the executive or administrative decisions support. It increases productivity, efficiency, and reduce production costs, increase product reliability. This will increase the company's reputation. This increases the competitiveness of enterprises. POP system toward the future with the new destroyer to prepare for our company. Collectively POP system build this research improves the reliability of the product. Improves the quality of customer service. The expansion of product sales is. increase the competitiveness of enterprises. companies should prepare for the future of the business.

  • PDF

A Software Architecture Life Cycle Model Based on the Program Management Perspective : The Expanded Spiral Model (프로그램 관리 관점에 기반을 둔 소프트웨어 아키텍처 생애주기 모델 : 확장된 나선형 모델)

  • Koh, Seokha
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.2
    • /
    • pp.69-87
    • /
    • 2013
  • The expanded spiral model in this paper consists of five processes of architecture design, architectural construction, architectural maintenance, operation, and architectural management. The former four processes are executed alternatively, while the latter architectural management process is executed continuously interacting with the other processes during the whole life cycle of the system. The expanded spiral model provides a conceptual framework to sort discussions of architectural degeneration into those of product-oriented processes and those of management processes, making it possible to incorporate the models and body of knowledge about project and program management especially those of Project Management Institute, into discussions of architectural degeneration. A good architecture decomposes the software-intensive system into components mutually interacting in a well-formed structure. The architecture design process and the architectural construction process together create the object system with well-designed architecture. The architectural maintenance process prevents the implemented architecture deviate from the designed architecture. The architectural management process monitors the changes of requirements including architecturally significant requirements, supports the other processes to be executed reflecting various perspectives of stake-holders, and creates and documents the reasons of architectural decisions, which is considered as a key element of the architecture.

On Enhancing Train-Centric Train Control System Development Process using DSM-based Safety Management (DSM 기법에 따른 안전 관리를 통한 차상중심 열차제어시스템 개발 프로세스의 개선에 관한 연구)

  • Kim, Joo-Uk;Oh, Seh Chan;Han, Seok Youn;Kim, Young-Min;Sim, Sang-Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.3
    • /
    • pp.129-138
    • /
    • 2016
  • The train-centric control systems development has some distinct points in that a big size of government budget is in general expended in there and the development duration seems to be long. In addition, the changes are ever made continuously in the capability and operational requirements for Trains. Thus, the impact of the potential changes in the required operational capability on the development activities can induce some type of project risks [7]. As such, proper management of project risk has been one of crucial subjects in the train systems development. All these notes combined together make it the significance of the safety management process be raised further up in the train-centric control systems development. As such, the underlying safety management process should be capable of appropriately handling the potential risks that can be created due to the unexpected changes and the long-term development period. The process should also be complemented for the safety consideration of train-centric control systems, for instance, stop. To study these aspect is the objective of the paper. To do so, a step-by-step approach to analyzing the safety management process is first presented. Then, to enhance the process some necessary and useful activities are added in terms of risk and safety management. Then, to pursue some enhancement on the process, a set of necessary and useful activities are added in terms of risk and safety management. The resultant process is further analyzed and tailored using a design structure matrix method. The resultant process is applied in a train-centric control development as a case study.

BPM Introduction for work efficiency improvement and BPM Modeling of Korea Railroad (업무효율성 향상을 위한 BPM 소개와 철도공사의 BPM 모델링)

  • Kim Dong-Bum;Ahn Soo-Kwan;Kim Bong-Taek
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1268-1275
    • /
    • 2005
  • The computerization works and environment have been changed from simple transaction and data process request to system connection request, from data computerization to application work automation and process computerization through IT development and Internet spread. Recently, BPM(Business Process Management) concept has been widely propagated. It is expanding interest of business subject. Korea Railroad is operating train operation management system through 5 regional headquarters and organizations under the influence of each regional headquarter. But integrated operation and management of communication each department, work flow management and resources of depot equipment and materials have to need a lot of effort and time in huge organization as Korea Railroad. Therefore, this article realized Web Based BPM Group Ware. This article will define Korea Railroad organization and business process in using this Group Ware. And it will introduce Korea Railroad computer manage system of this Group Ware and efficient Korea Railroad Business Process through modeling and operating department work and resources management in Korea Railroad.

  • PDF

Comparative Studies on Ports Management System in Northeast Countries

  • Kim, Jin-Hwan
    • Journal of Distribution Science
    • /
    • v.14 no.1
    • /
    • pp.29-38
    • /
    • 2016
  • Purpose - The purpose of paper is to review and look into the process of port development of each country, and compare with their system of port management. Research design, data and methodology - The methods to be taken is to examine a process of port development in terms of historic and regulated point of views, and each country's port is compared with various port models. Results - China has evolved of port governance into 3 stages, which has lead to almost liberalized port management system in process of privatization slogan. Japan has three stages of port development, and key commitments have been done by local government, rather than national one. Korea has also several stages of port reforms, and national government has been deeply involved in port industry, as well as regional government and port authority in certain areas. Conclusions - whatever port management system each countries has taken, it eventually aims to port productivity in country's port. To adopt most proper port management system may be answer for country to cope with environmental changes around port industry.