• Title/Summary/Keyword: private contract.

Search Result 189, Processing Time 0.027 seconds

Reference Architecture and Operation Model for PPP (Public-Private-Partnership) Cloud

  • Lee, Youngkon;Lee, Ukhyun
    • Journal of Information Processing Systems
    • /
    • v.17 no.2
    • /
    • pp.284-296
    • /
    • 2021
  • The cloud has already become the core infrastructure of information systems, and government institutions are rapidly migrating information systems to the cloud. Government institutions in several countries use private clouds in their closed networks. However, because of the advantages of public clouds over private clouds, the demand for public clouds is increasing, and government institutions are expected to gradually switch to public clouds. When all data from government institutions are managed in the public cloud, the biggest concern for government institutions is the leakage of confidential data. The public-private-partnership (PPP) cloud provides a solution to this problem. PPP cloud is a form participation in a public cloud infrastructure and the building of a closed network data center. The PPP cloud prevents confidential data leakage and leverages the benefits of the public cloud to build a cloud quickly and easily maintain the cloud. In this paper, based on the case of the PPP cloud applied to the Korean government, the concept, architecture, operation model, and contract method of the PPP cloud are presented.

The Analysis of Operational Characteristics in Contract - managed Highschool Foodservice in Seoul (서울시 소재 고등학교 위탁급식 운영현황 분석)

  • Yang, Il-Seon;Kim, Hyeon-A;Sin, Seo-Yeong;Jo, Mi-Na;Park, Su-Yeon;Cha, Jin-A;Lee, Bo-Suk
    • Journal of the Korean Dietetic Association
    • /
    • v.8 no.3
    • /
    • pp.280-288
    • /
    • 2002
  • The purpose of this study was to investigate the operational characteristics of the contract-managed highschool foodservice and to analyze the factors to effect the menu price. The data was collected from 249 highschools in Seoul. The results are as follows; Those surveyed highschools were established as 1 national, 74 public, and 174 private institution. Highschools were classified as 176 academic, 66 vocational, and 7 specific purposed institution. Students were organized as 70 boys', 23 girls', and 41 coeducational highschools. Most highschool started contract-managed highschool foodservice from 1999 and the period of foodservice contract was most 3 years and the operation styles in food distribution were 96 classrooms, 105 dining halls and 17 classrooms combined dining halls. The scale of contract foodservice management companies was 63.1% small and medium and 36.9% large enterprises. The surveyed highschools had the average meal price 2,141 won per meal and they had 1,518 pupils on the register. The participating rate to the foodservice was 68.5%. The facilities investment cost of the contract foodservice management company was 179,204,230 won for private institutions and was 138,119,010 won for national&public institutions. The period of the contract was 3.22 years in private institutions, which was significantly higher than national&public institutions which showed 2.85 years. The commissary foodservice schools had higher facilities investment cost than conventional foodservice schools. Classrooms foodservice had higher participating foodservice rate than Dining halls. The investment cost for facilities showed high in order of girls', boys', and coeducational high schools, and the number on the register and the number participating in the foodservice showed high in order of boys', girls', and coeducational high schools. The number on the register showed the highest in academic and vocational schools, specific purposed institutions in sequence, and the number participating in the foodservice showed high in order of academic schools, specific purposed institutions and vocational. However, the participating foodservice rate showed high in specific purposed institution, academic and vocational schools in order, and the meal price, the investment cost for facilities showed high in specific purposed institution, academic and vocational schools in sequence. Regionally, the district south of Han river had the average meal price 2,266.13 won, which showed higher in the eastern part which had 2,033.33 won. The western part had the average investment cost for facilities of 233,331,060 won, and the central district 126,137,140 won. The number on the register showed 1845.68 in the eastern part and 1308.00 in Dong-Jak area, that had clear differences among areas. When the period of the contract went longer, the investment cost for facilities had a tendency to increase. The significant differences were existed among meal price, the investment cost for facilities, the number on the register, the number participating in the foodservice, and the participating foodservice rate. The investment cost for facilities had increased according to the number participating in the foodservice and the participating foodservice rate. And the large enterprises showed higher participating foodservice rate than the small and medium enterprises.

  • PDF

Liability of Tort Related to Private Security in America (미국의 민간경비관련 불법행위 책임)

  • Choi, Sun-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.1
    • /
    • pp.39-47
    • /
    • 2008
  • These days American private security industries has rapidly grown, and its scales(employment, expenditures) exceed the public police. American private security are based on the theories such as privatization, co-production, and build more developmental framework. But the behind of private security, its civil and criminal liabilities are more issued. In this, among the civil liabilities focused on the tort liability. In civil liabilities, contract liability is specially raised by between contractors, on the other hand tort liability is raised in general without special relationship in civil law relations. In this study, I would observe the types, conditions, protest reasons and the cases in tort generated by private security officials.

Implications of Japanese Private Detective Service (일본 탐정업의 현황과 시사점)

  • Kim, Il Gon
    • Convergence Security Journal
    • /
    • v.12 no.5
    • /
    • pp.3-13
    • /
    • 2012
  • Japan came to result in enacting and enforcing the law on rationalization of service pertinent to the Private Detective Service Law in order to rationalize the illegal service realities of private detective service dealers and detective agencies, which were flooded in 2006. Since the enactment of the law, the problems are still taking place in relation to Japanese private detective service as of 2012. However, Japan's regulatory agencies can be known to revise the corresponding statute and to make effort to improve consciousness of agencies in order to improve these problems. Accordingly, it can be considered to be great in implication as for our country's introduction of private investigation service in the future. Arranging these contents, they are as follows. First, it is improvement in problems related to other statutes according to performance of private detective service. Second, it is reinforcement in management of private detective service violators. Third, it is propulsion of rationalization in cost according to a contract of private detective service. Accordingly, it can be considered to be necessary for being newly legislated at the 19th National Assembly from the perspective dubbed development and social right f unction in private investigation industry, by further supplementing Japan's these problems and arranging improvement plans so that the corresponding service called private detective service can do more public function in society.

Apply Blockchain to Overcome Wi-Fi Vulnerabilities

  • Kim, Seong-Kyu (Steve)
    • Journal of Multimedia Information System
    • /
    • v.6 no.3
    • /
    • pp.139-146
    • /
    • 2019
  • This paper, wireless internet such as Wi-Fi has a vulnerability to security. Blockchain also means a 'Ledger' in which transaction information that occurs on a public or private network is encrypted and shared among the network participants. Blockchain maintains information integrity by making it impossible for a particular node to tamper with information arbitrarily, a feature that would result in changes in the overall blockchain hash value if any one transaction information that constitutes a block was changed. The complete sharing of information through a peer-to-peer network will also cripple hacking attempts from outside, targeting specialized nodes, and prepare for the "single point of failure" risk of the entire system being shut down. Due to the value of these Blockchain, various types of Blockchain are emerging, and related technology development efforts are also actively underway. Various business models such as public block chains such as Bitcoin, as well as private block chains that allow only certain authorized nodes to participate, or consortium block chains operated by a select few licensed groups, are being utilized. In terms of technological evolution, Blockchain also shows the potential to grow beyond cryptocurrency into an online platform that allows all kinds of transactions with the advent of 'Smart Contract'. By using Blockchain technology, the company makes suggestions to overcome the vulnerability of wireless Internet.

Improvement Factors of Promoter Selection Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 평가기준 개선 요인 분석)

  • Shin, Hyun-In;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.310-316
    • /
    • 2006
  • Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.

  • PDF

Competency Development in Urban Local Bodies for Implementing Public Private Partnership Projects in India

  • Devkar, Ganesh A.;Kalidindi, Satyanarayana N.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.35-48
    • /
    • 2013
  • Weak competencies in urban local bodies (ULBs) for implementing public private partnership (PPP) projects has been recognized as a major hurdle in uptake of PPP model in India. In this context, a questionnaire survey was conducted to evaluate perception of urban PPP experts and ULB representatives on three aspects related to competency development, including, critical competencies for implementing urban PPP projects, approaches for competency development in ULBs and constraints faced by ULBs in development of competencies. The five critical competencies identified are project identification, project conceptualization, transaction design, PPP process management and contract management. The approach of training programs for municipal staff and elected representatives, and capacity building oriented technical assistance for implementing urban PPP projects have been preferred by survey respondents for competency development. The frequent transfer of municipal decision makers and low motivation among municipal staff have been identified as the most significant constraints for development of competencies.

MODEL FOR GOVERNMENT RESCUE POLICIES IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

  • S. Ping Ho
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.996-1001
    • /
    • 2005
  • Today, government is no longer considered the sole provider of public works or services. Public-Private Partnership (PPP) has been recognized as an important approach to solving problems for governments in providing public works and services. However, the joint ownership of public works/services complicates the administration of PPP projects. Particularly, the fact that government may rescue a distressed project and renegotiate with the developer causes serious problems in project procurement and management. This paper aims to study when and how government will rescue a distressed project and what impacts government's rescue behavior has on project procurement and contract management. A game-theory based model for government rescue will be developed. This pilot study, the author hopes, may provide theoretic foundations to practitioners/policy makers for prescribing creative PPP procurement and management policies and for examining the effectiveness of PPP policies.

  • PDF

Forecasting Construction Economy Through a Regression Analysis between Annual Interest Rate and Contract Amount (금리와 건설수주간 회귀분석을 통한 건설경제 예측기법)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.31-36
    • /
    • 2010
  • Rising interest rates positively affect investment in construction, while falling interest rates affect it negatively. In other words, the interest rate is one of the most critical factors affecting the construction sector. The purpose of this research is to analyze the relationship between the annual interest rate and construction contracts, and to present a model for quantitatively forecasting the economic performance of the construction sector. Based on the statistical data of interest rate changes for 19 years (from 1991 to 2009), this research induces an equation through regression analysis that incorporates interest rate and construction contract amounts as independent and dependent variables, respectively. The result of the analysis shows that, in the building and private sector, the interest rates are closely related to, with a correlation coefficient as high as 0.85. It was also indicated that the contract amounts of private and building sectors may increase quite rapidly in 2012.

A Study on the Application Scheme of the Warranty delivery system in Domestic Private Finance Initiative (국내 민간투자사업의 성능발주제도 도입에 관한 연구)

  • Kim, Dae-Kil;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.527-530
    • /
    • 2007
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in France, United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. In addition to, domestic constructions have been meeting with international competition because of the open BOT market from FTA. Finally, this study proposed new warranty delivery system model in PFI on considering domestic status by benchmarking the delivery process and the characteristics of the warranty contract which is applied to PFI of global.

  • PDF