• Title/Summary/Keyword: precast beam-to-column connection

Search Result 66, Processing Time 0.025 seconds

An Experimental Study II on the Bolted Connection between H-Beam and Precast-Concrete Column (PC 기둥-H형 강보의 볼트접합부에 관한 실험적 연구 II)

  • Han Dong-hoon;Park Soon-kyu
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.13-16
    • /
    • 2004
  • The PCS system, which consists of precast concrete column and steel beam, has been developed. The system is expected to achieve the effectiveness in the constructability and improve the structural performance under earthquake. New types of joint system for the panel zon and column connection has been developed in order to improve the shear strength capacity and rigidity of the of the system. The cyclic seismic test recommended by ACI was conducted to verify the structural performance of the system. As a test results, it is observed that the system satisfy most of the requirements by ACI criteria.

  • PDF

Development of Beam-Column Connection for Green Rhamen Structural Apartment (공동주택 적용을 위한 친환경 라멘구조 접합부 개발)

  • Yoon, Tae-Ho;Hong, Won-Kee;Park, Seon-Chee;Yune, Dai-Young
    • KIEAE Journal
    • /
    • v.10 no.6
    • /
    • pp.159-165
    • /
    • 2010
  • The composite frame system suggested in this paper consists of steel reinforced concrete beam encased with structural tee and precast concrete column. This system has advantages such as reduction of materials, CO2 emissions and waste. To commercialize the new composite frame system, it is necessary to develop connections that can effectively connect each member. Therefore, a hybrid connection that has steel type connection and reinforced concrete together is utilized to connect easily at the composite frame system. To evaluate the structural performance of the composite frame system, an experimental investigation is presented. In this study, the flexural moment capacity of the composite frame was determined using the strain compatibility approach. The strain compatibility approach can be used to predict the flexural moment capacity at each limit state. As a result, all elements of the beam to column connection are represented to fully interact between each other. The specimens show errors of -1.9% in the yield limit state and 0.9% at the maximum load limit state. Also, testing shows that beam to column connections have characteristics of semi-rigid connection as per Eurocode 3.

An Experimental Study III on the Bolted Connection between H-Beam and Precast-Concrete Column (PC 기둥-H형강보의 볼트접합부에관한 실험적 연구III)

  • Yeo, In-Seok;Park, Soon-Kyu
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.307-310
    • /
    • 2005
  • The PCS system, which consists of precast concrete column and steel beam, has been under development. Experimental test has been carried out to investigate the structural performance of the system under earthquake. Two types of test specimens of beam-column joints are designed in order to compare the performances. One is the system with reinforced concrete slab and the other is without slab. It is found that the system with slab could satisfy all of the requirements from ACI Criteria such as strength, stiffness degradation and energy dissipation capacity except initial stiffness. It is also investigated that the stiffness of the joint is belong to rigid joint type according to Bjorhovde criterion. And it is observed that the partial-composite system between beam and slab is more effective than full-composite system in the respect of the energy dissipation capacity of the system.

  • PDF

Economic Analysis of Connection and Anchorage Methods of Bottom Rebar for Composite Precast Concrete Girder (합성 PC 보의 하부철근 이음 및 정착방법에 따른 경제성 검토)

  • Cho, Wonhyun;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.11-12
    • /
    • 2015
  • Green Frame is a Rahmen structure made of composite precast concrete members. According to the concrete design code, a lower rebar of precast concrete girder, should be extended to the inner precast concrete column. However, such extension of lower rebar may sharply reduce its constructability. To satisfy the criteria, the connection and anchorage of beam rebar should be taken into consideration, yet it is difficult to use lapping as it is not easy to ensure enough space when Green Frame method is adopted. To solve this, a new method of lower rebar connection and anchorage was developed, and this study is intended to review economic feasibility prior to applying the method developed onto sites. The study result can be used as basic data for selection of the optimal joint and anchorage method for lower rebar of the green frame construction.

  • PDF

Seismic reliability of precast concrete frame with masonry infill wall

  • Mahdi Adibi;Roozbeh Talebkhah;Hamid Farrokh Ghatte
    • Earthquakes and Structures
    • /
    • v.24 no.2
    • /
    • pp.141-153
    • /
    • 2023
  • The presented paper considers infill masonry walls' influence on the seismic reliability of precast concrete frames. The recent Bojnord earthquake on May 13th, 2017 in Iran (MW 5.4) illustrated that the infill masonry walls play a crucial role in the damage extent and life safety issues of inhabitants in the precast concrete buildings. The incremental dynamic analysis (IDA) approach was used to determine the fragility curves of the represented damaged precast frame. Then, by integrating site hazard and structural fragilities, the seismic reliability of the represented precast frame was evaluated in different damage limit states. Additionally, the static pushover analysis (SPA) approach was used to assess the seismic performance assessment of the precast frame. Bare and infilled frames were modeled as 2D frames employing the OpenSees software platform. The multi-strut macro-model method was employed for infill masonry simulation. Also, a relatively efficient and straightforward nonlinear model was used to simulate the nonlinear behavior of the precast beam-column joint. The outputs show that consideration of the masonry infilled wall effect in all spans of the structural frame leads to a decrease in the possibility of exceedance of specified damage limit states in the structures. In addition, variation of hazard curves for buildings with and without consideration of infilled walls leads to a decrease in the reliability of the building's frames with masonry infilled walls. Furthermore, the lack of infill walls in the first story significantly affects the precast concrete frame's seismic reliability and performance.

Study on seismic behavior of fabricated beam-column bolted joint

  • Zhang, Yu;Ding, Kewei
    • Structural Engineering and Mechanics
    • /
    • v.82 no.6
    • /
    • pp.801-812
    • /
    • 2022
  • To better promote the development of fabricated buildings, this paper studies the seismic behavior of precast concrete beam-column bolted joint under vertical low cyclic loading. The experimental results show that cracks appear in the beam-column joint core area. Meanwhile, the concrete and the grade 5.6 bolts are damaged and deformed, respectively. Specifically, the overall structure of the beam-column joint remains intact, and the bolts have good energy dissipation capacity. Based on the experimental study, a new method of beam-column bolted connection is proposed in simulation analysis. The simulation results show that the bolts deform in the core area of the new beam-column joint, which enhances the concrete shear capacity legitimately and protects the T-end of the beam against shear failure. To summarize, both the experimental joint and the simulated joint prolong the service life by replacing the bolts under the seismic loading. The research results provide a reference for applications of the fabricated beam-column joint.

Erection Capability of Heavy Precast Frames with Metal Plates using Wet Concrete for Tolerance (톨러런스기반 플레이트 접합 장치를 사용한 고중량 RC보의 설치 성능)

  • Hong, Won-Kee;Nguyen, Van Tien;Nguyen, Manh Cuong;Nkundimana, Eric
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.12-13
    • /
    • 2021
  • Methods for the manufacture, erection, and assembly of heavy frame modules were proposed. Interferences among precast members were prevented by using bolted metal plates for dry precast beam-to-column joints during assembly with a clearance for tolerance implementing grouted concrete filler plates instead of metal filler plates. Clearances for tolerances were provided to avoid conflictions among components during erection phases. These gaps were, then, grouted by high-strength mortar. The constructability of new connections of a beam-to-column joint using bolted metal plates for precast structures was examined using a full-scale assembly test in which practical observations indicated that members could be aligned and placed accurately in both horizontal and vertical directions, leading to a fast and convenient assembling. Bolt holes of the endplate were properly aligned using couplers with 30 mm fastened length embedded in the columns. The assembly test demonstrated the erection safety and structural stability of the proposed joints that were without filler plates when they were subjected to heavy loads at the time of their erection. The facile and rapid assembly of precast beam-to-column connections with a 30 mm tolerance was observed. The proposed assembly method is rapid, sustainable, and resilient, replacing the conventional methods of concrete frame construction, offering a connection that can be used in constructing infrastructure, such as buildings and pipe-rack frames.

  • PDF

Hysteretic Behavior and Seismic Resistant Capacity of Precast Concrete Beam-to-Column Connections (프리캐스트 콘크리트 보-기둥 접합부의 이력거동 및 내진성능)

  • Choi, Hyun-Ki;Choi, Yun-Cheul;Choi, Chang-Sik
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.14 no.4
    • /
    • pp.61-71
    • /
    • 2010
  • Five half-scale beam-to-column connections in a precast concrete frame were tested with cyclic loading that simulated earthquake-type motions. Five half -scale interior beam-column assemblies representing a portion of a frame subjected to simulated seismic loading were tested, including one monolithic specimen and four precast specimens. Variables included the detailing used at the joint to achieve a structural continuity of the beam reinforcement, and the type of special reinforcement in the connection (whether ECC or transverse reinforcement). The specimen design followed the strong-column-weak-beam concept. The beam reinforcement was purposely designed and detailed to develop plastic hinges at the beam and to impose large inelastic shear force demands into the joint. The joint performance was evaluated on the basis of connection strength, stiffness, energy dissipation, and drift capacity. From the test results, the plastic hinges at the beam controlled the specimen failure. In general, the performance of the beam-to-column connections was satisfactory. The joint strength was 1.15 times of that expected for monolithic reinforced concrete construction. The specimen behavior was ductile due to tensile deformability by ECC and the yielding steel plate, while the strength was nearly constant up to a drift of 3.5 percent.

Development of Beam-Column Connection for The New Apartment Structural System (장수명 공동주택용 보-기둥 접합부 시공방법 개발)

  • Yoon, Tae-Ho;Hong, Won-Kee;Kim, Sun-Kuk;Park, Seon-Chee;Yun, Dai-Young
    • KIEAE Journal
    • /
    • v.10 no.6
    • /
    • pp.145-151
    • /
    • 2010
  • Bearing wall system was used extensively in most multi-residential apartment buildings in Korea. However, bearing wall apartments have the lack of architectural plan flexibility, remodelling-incompatible, causing serious economic losses in terms of construction waste. Recently, many researchers have studied the use of Rahmen structure as a potential alternative. The beam-column connection in the paper for long-life apartment housing forms connection of a Rahmen structure utilizing the advantages of steel and reinforced concrete. In addition, reduction of cast-in place concrete and construction schedule is expected by using precast concrete. Reduction effect of quantity decreased construction costs and $CO_2$ emission of key construction materials. However, verifying the feasibility of new construction method entails numerous challenges. Accordingly, the purpose of this study is to analyze the construction feasibility of sleeve, coupler, and pressure welding connections for long-life apartment building structure. A 3D modeling software was used to perform the analysis, and a real scale model was created to verify the results of construction feasibility. By verifying the construction feasibility of beam-column connections, this study will contribute to the efficient application of these methods on construction sites.

FE Analysis of Exterior Wide Beam-Column Connections with Bonded Tendon Stress (부착된 프리스트레스 넓은 보-기둥 외부접합부의 유한요소해석)

  • Lee, Moon-Sung;Choi, Yun-Cheul;Lim, Jaei-Hyung;Moon, Jeong-Ho;Choi, Chang-Sick
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.4
    • /
    • pp.307-315
    • /
    • 2008
  • Post-tensioned precast concrete system (PPS) consists of U-shaped precast wide beams and concrete column. The continuity of beam-column joint is provided with the topping concrete on the PC shell beam and post-tensioning. Nonlinear analysis was conducted, using ANSYS, a finite-element analysis program, to obtain data for determining the characteristics of the structure and to allow various parametric analyses for post-tensioned wide beam-column connections. In this analysis, the Solid 65 element was used, in which concrete element had 8 nodes and each node had 3 degrees of freedomIn. Solid 65, the shear-transfer factor reflects a decrease of shear strength for the positions with cracks, as an impact factor to make the analysis value approximate the experiment value. In this study, the behavior of test specineus were most closely predicted to the experimental results, when the shear-transfer coefficient 0.85 was used for a closed crack, and 0.2 was used for an open crack.