• Title/Summary/Keyword: pre-construction pile

Search Result 27, Processing Time 0.031 seconds

KEC Construction and Design of Auger-drilled Piles (한국도로공사의 매입말뚝 공법의 설계와 시공)

  • Park, Young-Ho;Nam, Moon-S.;Kim, Nak-Young;Yook, Jeong-Hoon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.521-532
    • /
    • 2008
  • The SIP method developed by low noise-vibration from Japan is appropriate to the construction at urban area. However, this method has been misused as a pre-driiled driven pile method in Korea. Hence, Korea Expressway Corporation proposed 'Design & Construction Guideline for the SIP Method' following the original concept of the SIP method at 2004 and 2006. Also construction guideline of another auger-drilled piles were introduced.

  • PDF

A Development of the Automated Vertical Controllable Device for Improving Construction Performance of Pile Driver (파일드라이버 기계 시공성능 향상을 위한 연직 자동제어기의 개발)

  • Cho, Chang-Yeon;Lee, Jun-Bok;Son, Jae-Ho;Kim, Han-Soo;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.78-90
    • /
    • 2006
  • There is no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vertical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. The main objective of the research is to develop the automated vertical controllable prototype equipment for PHC piles in order to achieve uniform construction qualify as well as improving safety and productivity. The paper explains the literature review on PHC pile and pile installation process, development of prototype, field test of the prototype and its performance evaluation in terms of quality and safety as well as productivity. The results of the research will lead the further researches on the automated pile installation system.

Feasibility Appraisal and Proposal of a Pile Driving Formula for Domestic Pre-bored Pile Management (국내 매입 말뚝 관리를 위한 항타공식 활용 가능성 평가 및 제안에 관한 연구)

  • Kim, Gunwoong;Seo, Seunghwan;Kim, Juhyong;Chung, Moonkyung
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.11
    • /
    • pp.71-84
    • /
    • 2023
  • In accordance with Korean structural foundation design standards, dynamic or static load tests are mandated for 1 to 3% of total piles. The construction quality of the remaining 97% to 99% of piles is determined through penetration measurements. This study aims to enhance the quality control of the majority of piles by adopting a pile driving formula that considers both penetration and hammer energy. The current challenge lies in adapting existing overseas driving formulas to the domestic site conditions, characterized by shallow weathered or soft rocks, and the prevalent use of pre-bored piles. To address this, the Modified Gates formula was refined using domestic dynamic load data, thereby improving its applicability to pile management. Despite employing fewer variables, the proposed formula demonstrates a comparable accuracy to dynamic loading tests in predicting the bearing capacity of pre-bored piles. Consequently, this formula holds promise for practical use in future pile quality management.

Development of the Pilot Type Machine for Automation of PHC Pile Cutting Work (PHC 파일 두부정리 자동화를 위한 파일롯타입 장비의 개발)

  • Lee Jeong-Ho;Park Sang-Jun;Jeong Myung-Hoon;Kim Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.173-181
    • /
    • 2003
  • During the last few years, the use of Pre-tensioned spun high strength concrete piles(PHC pile) has been gradually increased in many construction sites. Cutting work of the concrete pile is an important task to crush a part of pile head which is compressed with more than 800$\cal{kg}f/cm^2$. It is usually performed by a crusher and three to four skilled workers. Recent analysis results of the pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose conceptual designs for developing an automated pile cutting machine. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.

Case Study on the Design of Earth Retaining and Retention Wall Using Pre-casted Concreted Pile(PHC) (기성콘크리트말뚝(PHC)을 이용한 옹벽겸용 흙막이설계사례)

  • Han, Jung-Geun;Cho, Young-Ryang;Kim, Sang-Kwi;Park, Sang-Cheol;Eo, Yun-Won
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.8 no.3
    • /
    • pp.33-42
    • /
    • 2005
  • The bearing methods using pile of steel itself or reinforced concrete has been applying which in excavated depth was not deep. Also, the retaining wall as resisting structure to lateral force has taken weakness that the cure periods of concreted is long. Recently, with the material cost of steel, the application of cement is more increasing trend. In this study, the design methods of earth retaining and retention wall within the pre-casted concrete pile, PHC(Pretentioned spun High strength Concrete piles), was proposed which in the ground condition of excavated depth was not deep. The typical ground conditions, cohesive and non-cohesive soil, was considered as follows; soil strength as internal friction angle and UU(Undrained Unconsolidation triaxial test) strength, soil reaction and stabilization of structures. The application of design methods could be confirmed through the comparing and analyzing between measured data and utility software for the design.

Study on large tonnage pile foundation load test system and field test of long rock-socketed pile

  • Zhang, Xue-feng;Ni, Ying-sheng;Song, Chun-xia;Xu, Dong
    • Geomechanics and Engineering
    • /
    • v.21 no.6
    • /
    • pp.565-570
    • /
    • 2020
  • Large tonnage pile foundation load test system is designed in this paper by using pre-stressed technique to optimize the design of anchor pile reaction beam system, in which project pile can be successfully taken as anchor pile. The test results show that the cracks and excessive deformations of the prestressed anti-force device designed in this study have not occurred, and the prestressed tendons of the anchor pile ensure that the anchor pile will not be pulled and fractured, and the prestressed tendons can be reused, thus ensuring the safety and reliability of the test. This test method can directly test bearing capacity of long rock-socketed piles, and analysis bearing behaviors from test results of sensors which embedded in the pile. Through test studied, authors summarized the vertical bearing characteristics of long rock-socketed piles and the main problems that should be paid attention to during design and construction, and provided reliable solutions.

DEVELOPMENT OF CONCRETE FILLED TUBE AS A PILLAR PILE FOR TOP DOWN METHOD

  • Jee-Yun Song;Hong-Chul Rhim;Seung-Weon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.808-813
    • /
    • 2009
  • Top-down method is widely used for urban area construction for its advantages in reducing environmental problems such as dust and noise, and saving construction cost depending on given conditions of a construction site. Because the excavation and construction of super- and sub-structures of the building have to be proceeded simultaneously, a column has to be embedded prior to excavation. This column is called a pillar column or pre-founded column. Usually a wide flange section is used for these columns. To place the columns, usually the diameter of casing holes needs to be larger than the section of the wide flange itself in order to accommodate a couple of tremie pipes for pouring concrete. In this paper, a newly developed method of using circular pipe as an alternative to the existing wide flange section is discussed. The crucial part of the new method is to develop a connection between the circular column and concrete flat slabs. For shear force transfer from concrete slab to the concrete filled tube (CFT) column, shear jackets with studs and shear bands are proposed. The studs are welded on the jackets at shop and placed around the circular column on site. The shear bands are welded on the outer side of the CFT at shop and inserted into ground with the CFT. Test results and application of the method to a construction site are also provided in this paper.

  • PDF

Field investigation and numerical study of ground movement due to pipe pile wall installation in reclaimed land

  • Hu Lu;Rui-Wang Yu;Chao Shi;Wei-Wei Pei
    • Geomechanics and Engineering
    • /
    • v.34 no.4
    • /
    • pp.397-408
    • /
    • 2023
  • Pipe pile walls are commonly used as retaining structures for excavation projects, particularly in densely populated coastal cities such as Hong Kong. Pipe pile walls are preferred in reclaimed land due to their cost-effectiveness and convenience for installation. However, the pre-bored piling techniques used to install pipe piles can cause significant ground disturbance, posing risks to nearby sensitive structures. This study reports a well-documented case history in a reclamation site, and it was found that pipe piling could induce ground settlement of up to 100 mm. Statutory design submissions in Hong Kong typically specify a ground settlement alarm level of 10 mm, which is significantly lower than the actual settlement observed in this study. In addition, lateral soil movement of approximately 70 mm was detected in the marine deposit. The lateral soil displacement in the marine deposit was found to be up to 3.4 and 3.1 times that of sand fill and CDG, respectively, mainly due to the relatively low stiffness of the marine deposit. Based on the monitoring data and site-investigation data, a 3D numerical analysis was established to back-analyze soil movements due to the installation of the pipe pile wall. The comparison between measured and computed results indicates that the equivalent ground loss ratio is 20%, 40%, and 20% for the fill, marine deposit and CDG, respectively. The maximum ground settlement increases with an increase in the ground loss ratio of the marine deposit, whereas the associated influence radius remains stationary at 1.2 times the pipe pile wall depth (H). The maximum ground settlement increases rapidly when the thickness of marine deposit is less than 0.32H, particularly for the ground loss ratio of larger than 40%. This study provides new insights into the pipe piling construction in reclamation sites.

A study on the effects of ground reinforcement on the behaviour of pre-existing piles affected by adjacent tunnelling (터널근접시공에 의한 기 존재하는 인접말뚝의 거동에 지반보강이 미치는 영향에 대한 연구)

  • Jeon, Young-Jin;Kim, Sung-Hee;Kim, Jeong-Sub;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.389-407
    • /
    • 2017
  • In the current work, a series of three-dimensional finite element analysis was carried out to understand the behaviour of pile when the tunnel passes through the lower part of a single pile or group piles. At the current study, the numerical analysis analysed the results regarding the ground reinforcement condition between the tunnel and pile foundation. In the numerical modelling, several key issues, such as the pile settlements, the axial pile forces, the shear stresses and the total displacements near the tunnel have been thoroughly analysed. The pile head settlements of the single pile with the maximum level of reinforcement decreased by about 16% compared to the pile without ground reinforcement. Furthermore, the maximum axial force of the single pile with the maximum level of ground reinforcement experienced a 30% reduction compared to the pile without reinforcement. It has been found that the angle of ground reinforcement in the transverse direction affects the pile behaviour more so than the length of the ground reinforcement in the longitudinal direction. On the other hand, in the case of the pile group with the reinforced pile cap, the ground displacement near the pile tip appears to be similar to the corresponding ground displacement without reinforcement. However, it was found that the pile cap near the pile head greatly restrained the pile head movement and hence the axial pile force increased by about 2.5 times near the pile top compared to the piles in other analysis conditions. The behaviour of the single pile and group piles, depending on the amount of ground reinforcement, has been extensively examined and analysed by considering the key features in great details.

Study on the Rational Construction Method Using Analysis of the Case Study of PHC Pile Foundation in Song-Do Area (송도지역 내 PHC 말뚝기초 적용사례분석을 통한 적정 시공방법 연구)

  • Lee, Byengho;Lee, Jonghwi;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.3
    • /
    • pp.55-61
    • /
    • 2011
  • Song-Do international city is the area developed in large-scale land reclamation. Song-Do area consists of reclamation layer, sedimentary layer(loose silt, soft clay and sand alternating) and residual layer from the ground surface. Therefore, using pile foundation is inevitable to build structures safely. In this area, driven PHC piles have been generally constructed in terms of environmental and economic conditions. As a result of analyzing 4 sites in Song-Do district 5 and 7 recently, the method of driving pile has many problems because of existence of rigid soil in sedimentary layer and installation of more than 30m piles. In this case, when installing piles by drive after pre-boring up to appropriate depth, the results of constructability analysis were very good. And in the economic efficiency, although 4% of construction cost rose, it was a very slight increase in comparison with improvement of workability. In the case of the stability, more than 70% compared to the allowable stress of piles was satisfied through the load test. As a result, when PHC piles is installed in Song-Do district, the proper construction method is that piles are located at bearing layer after boring rigid sand layer.