• Title/Summary/Keyword: power plants

Search Result 4,056, Processing Time 0.033 seconds

A Basic Analysis of Performance of Turbo CI Engine based on Stirling Cycle (스털링 사이클을 기본으로 하는 과급 CI 엔진의 기초 성능 분석)

  • 배종욱
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.24 no.5
    • /
    • pp.76-85
    • /
    • 2000
  • Stirling cycle was actualized as so called ‘hot air engine’. It has been focused again lately as one of measures for exhaust gas emission problem, but as small power engine because of its method of heat addition. Recently marine power plants commenced to meet a stringent environmental restrictions by international convention, Marpol so that diesel engines as main and auxiliarly power plants are urged to be reformed to reduce NOx emission. Author devised a compression ignition engine as a large marine power plants combined with turbo charger based on stirling cycle, and analyzed the performance by means of basic thermodynamic calculation. Analyzed in this paper, were theoretical efficiency, mean effective pressure, required equivalence ratio, gas turbine power ratio, maximum pressure, states of turbo-charger inlet gas and exhaust gas, manifesting that the engine could be proposed as one of the future power plants of marine use.

  • PDF

Performance Analysis on Gas Turbine based Oxy-fuel Combustion Power Plants (가스터빈과 순산소 연소를 적용한 발전시스템의 성능해석)

  • Lee, Young-Duk;Lee, Sang-Min;Park, Jun-Hong;Yu, Sang-Seok;Ahn, Kook-Young
    • Proceedings of the KSME Conference
    • /
    • 2008.11b
    • /
    • pp.3169-3174
    • /
    • 2008
  • Future power plants will be required to adopt some type of carbon capture and storage (CCS) technologies to reduce their CO2 emissions. One of distinguished CCS techniques expected to resolve the green house effect is to apply the oxy-fuel combustion technique to power plant, and a lot of research/demonstration programs have been going on in the world. In this paper, CO2-capturing power plants based on gas turbine and oxy-fuel combustion are investigated over several types of configurations. As a prior step, simulation model for 500 MW-class combined cycle power plant was set and was used as a reference case. The efficiencies of several power plants was compared and the advantages and disadvanteges was investigated.

  • PDF

Repair and Replacement Methodology for Electrical Equipment Used in Nuclear Power Plants (원자력발전소 전기기기의 보수, 교체 방법론)

  • Park, Chulhee;Park, Wan-gyu;Lee, Manbok;Kim, Choon-sam
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.177-179
    • /
    • 2018
  • After Fukushima nuclear accident at 2011, nuclear industrial has been focused on operation and maintenance phase, not design and construction phase. Continued good operating performance of nuclear power plants has been the best critical issue to nuclear utilities. Replacement for complete components as well as parts of components is being procured because nuclear utilities must maintain safety and reliability of operating nuclear power plants. However, many suppliers and manufacturers are giving up a nuclear quality assurance program under reduction in new construction of nuclear power plants. It is able to be increased difficulty in procuring spare parts to support operations and maintenance of nuclear power plants. Over 20% of nuclear power plant equipment in some countries is obsolete. Owing to obsolescence of nuclear safety-related items and/or withdrawing a nuclear quality assurance program of suppliers and manufactures, some replacement item and part might be procured to the item not covered by appendix B to USNRC 10 CFR Part 50. Under various methods of the nuclear repair and replacement methodology, utilities are supposed to establish a typical program for a repair and replacement of an electrical equipment and its parts in conjunction with a nuclear quality assurance. Concerning this typical program, this study suggests the repair and replacement methodology of electrical equipments used in nuclear power plants by procurement of a power supply, based on nuclear regulations, codes, standards, guidelines, specific and general technical information, etc..

  • PDF

A Development of Eddy Current Testing System for Steam Generators Inspection in Nuclear Power Plants (원전 증기발생기 와전류검사 시스템 개발)

  • Moon, Gyoon-Young;Cho, Chan-Hee;Yoo, Hyun-Joo;Lee, Tae-Hun;Cho, Yong-Bae
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.9 no.1
    • /
    • pp.40-47
    • /
    • 2013
  • The capacity factor of nuclear power plant in Korea is the highest level in the world. However, the integrity assessment of nuclear power plant is depended on foreign country. Especially, most eddy current testing systems for inspecting steam generators in nuclear power plant are currently imported from USA, Canada, and so on. Therefore, the eddy current testing system can react more active and adaptive from economic and managerial standpoint for actual nuclear power plants in Korea is required. In this paper, an eddy current testing system for inspecting steam generators in nuclear power plants is introduced. Frequency generator, analog circuit, analog digital converter circuit, and digital control circuit are composed in eddy current testing system. A benchmarking of acquisition system and acquisition software, eddynet 11i made by Zetec, and modifications are carried out based on the test environment of Korea nuclear power plants. Finally, all eddy current apparatus are integrated to inspect steam generator tubes in nuclear power plants.

An Evaluation and Suggestion of Photovoltaic Power Plant Locations based on Environmental and Social Impacts, and Sustainability (환경적.사회적 영향을 고려한 태양광발전소의 기존 입지 타당성 평가 및 지속가능한 입지 제안)

  • Park, Yoo-Min;Kim, Young-Ho
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.15 no.3
    • /
    • pp.437-455
    • /
    • 2012
  • Korea has recently constructed a number of renewable photovoltaic power plants in Jeolla province as an effort to provide environment-friendly energy. However, several problems appeared in the power plant locations because they were not appropriately chosen ignoring social-environmental perspectives. Consequently, locations of both currently existing photovoltaic power plants require an social and environmental evaluations. This study aims to provide appropriate photovoltaic power plants locations and evaluation of current photovoltaic power plants in Jeolla province. By presenting location analysis of photovoltaic power plants, this study would minimize environmental and social side effects regarding photovoltaic power plants. Kriging and Analytic Network Process (ANP) are applied as methodology. ANP generates correct weights in combining spatial data, so that the result would present optimal locations. In addition environmentally sensitive regions were excluded in the analysis process. The results show that South and West coastal areas have a number of appropriate locations for photovoltaic power plants. In addition, evaluating currently running photovoltaic power plant locations, total 23 out 81 are turned out to be inappropriately located. This study is expected to contribute avoiding social and environmental conflicts in photovoltaic power plant locations and present criteria in evaluating photovoltaic power plants.

  • PDF

Contribution of Large-Scale PV Plants in the Respective Region of the Jeju Island to Electric Power during Summer Peak Times (제주도 지역별 대용량 태양광발전소들의 여름 피크타임 기여도 연구)

  • Baatarbileg, Ankhzaya;Ko, Suk-Young;SaKong, June;Kwon, Hoon;Lee, Gae-myoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.12
    • /
    • pp.1873-1878
    • /
    • 2017
  • Both the introduction of the Renewable Energy Portfolio Standard (RPS) system into the electric energy market in 2012 and a decrease in the cost of constructing photovoltaic (PV) power plants have been increasing the number of MW PV plants in South Korea. Jeju Island is located at the center of three nations, South Korea, China and Japan, and its provincial government declared in 2012 that the island will be a clean region where greenhouse gases are not emitted by 2030. The Jeju provincial government is now doing its best to install PV plants and wind farms to realize a carbon-free island. In this study we investigated contribution of MW PV plants to the power of the electric grid during summer peak times on Jeju Island. Mt. Halla the highest mountain in South Korea, is located at the center of Jeju Island, and we divided the island into four regions and carried out analyses of a total of 24 PV plants. The average contribution of the PV plants in the respective region to electric power of Jeju Island during summer peak times was investigated and compared with those of the other regions. The best average contribution during the 12.5% maximum load period was obtained from the PV plants in the western region, and the value was 33% during 2015 and 2016.

Review on Evaluation of Rare Earth Metals and Rare Valuable Metals Contained in Coal Ash of Coal-fired Power Plants in Korea

  • Park, Seok-Un;Kim, Jae-Kwan;Seo, Yeon-Seok;Hong, Jun-Seok;Lee, Hyoung-Beom;Lee, Hyun-Dong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.1 no.1
    • /
    • pp.121-125
    • /
    • 2015
  • Distribution of rare earth metals (REMs) and rare valuable metals (RVMs) contents in coal ashes (fly ash, bottom ash, and pond ash) and leachate from 11 coal-fired power plants in Korea were investigated. Coal ashes and leachates were found to contain important REMs and RVMs such as Yttrium (Y) and Neodymium (Nd), which was in the range of 23~75 mg/kg. However, it still requires developing effective recovery and separation methods in order to utilize REMs and RVMs in ash and leachate. Recovery of valuable elements (Y and Nd) from various and extensive ash sources (8.21 million tons/year in 2013) can provide the existing power plants with additional profit; therefore, it can significantly improve economics of the power plants.

Examination History and Abnormal Thyroid and Breast Lesions According to Residential Distance from Nuclear Power Plants

  • Lim, Young-Khi
    • Journal of Radiation Protection and Research
    • /
    • v.41 no.4
    • /
    • pp.402-408
    • /
    • 2016
  • Background: Ascertainment bias are common in epidemiologic studies to assess the association between thyroid cancer risk and living near nuclear power plants because many thyroid cancers are diagnosed by chance through health examination. We surveyed the ultra sonography (USG) examination history and conducted thyroid and breast USG in residents living near nuclear power plants. Materials and Methods: The study population comprised 2,421 residents living near nuclear power plants in Korea. Information on demographic characteristics, including diagnostic examination history, was collected by interview using questionnaires. USG examination was conducted to evaluate the presence of thyroid nodules and breast lesion. Study participants were divided into 3 groups according to the distance of their respective villages from a nuclear power plant. The proportions of USG examination history and prevalence of thyroid nodules and breast lesions were compared between groups. Results and Discussion: Examination histories of thyroid USG were 23.1%, 13.7%, and 10.5% in men and 31.3%, 26.7%, 18.3% in women in the short, intermediate, and long distance groups, respectively. There were significant inverse associations between thyroid USG history and the distance from nuclear power plants (P for trend = 0.001 for men and 0.017 for women). However, there was no association between the distance of villages from nuclear power plants and prevalence of thyroid nodules. Conclusion: Our results suggest that there may be an ascertainment bias in population-based studies examining the harmful effects of NPPs examination and researchers should pay attention to ascertainment bias resulted from differential health examination. Correction for ascertainment bias, active follow-up and examination for all study population to remove differential health examination is needed.

Estimating PM Emission Factor from Coal-Fired Power Plants in Korea (화력발전소에서의 국내 배출계수 산정 방안 연구 -먼지를 중심으로-)

  • Jang, Kee-Won;Kim, Hyoung-Chun;Lee, Yong-Mi;Song, Deok-Jong;Jung, No-El;Kim, Sang-Kyun;Hong, Ji-Hyung;Lee, Suk-Jo;Han, Jong-Su
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.27 no.5
    • /
    • pp.485-493
    • /
    • 2011
  • In Korea, PM (Particulate Matter) emissions caused by coal-fired power plants are measured by a system, so called Clean Air Policy Support System (CAPSS), which uses foreign emission factors. However, the system fails to reflect the characteristics of domestic power plants. In this regard, this study aims to develop local, accurate domestic emission factors. The study measured the amount of TSP (Total Suspended Particulates), PM10 and PM2.5 by collecting samples from the latter parts of pollution control devices which were installed at 3 bituminous-fired power plants and 3 anthracite-fired power plants. The results showed that the average concentrations of TSP, PM10 and PM2.5 measured at bituminous-fired power plants were 4.63 mg/$Sm^3$, 2.96 mg/$Sm^3$ and 3.07 mg/$Sm^3$ respectively, much higher than those from anthracite-fired power plants (2.96 mg/$Sm^3$, 2.47 mg/$Sm^3$ and 1.37 mg/$Sm^3$, respectively). In addition, bituminous-fired power plants showed higher ratios of PM10/TSP and PM2.5/TSP with 0.66 and 0.92, respectively, compared to 0.82 and 0.46, the ratios of PM10/TSP and PM2.5/TSP measured in anthracite-fired power plants. Emission factors based-on concentration measurements were also higher for bituminous-fired power plants, and PM with smaller particles tended to have bigger difference in emission factors between the two fuels. This study calculated the amount of PM emissions by using the estimated emission factors. When it comes to the PM emissions, it was less than that of CAPSS while similar to that of CleanSYS in its amount. It is expected that the emission factors developed by this study will be used in Korea replacing foreign emission factors currently used in Korea by ensuring the objectivity and reliability as domestic emission factors.

Seismic Response Analysis of Nuclear Power Plant Structures and Equipment due to the Pohang Earthquake (포항지진에 대한 원자력발전소 구조물 및 기기의 지진응답분석)

  • Eem, Seung-Hyun;Choi, In-Kil
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.22 no.3
    • /
    • pp.113-119
    • /
    • 2018
  • The probabilistic seismic safety assessment is one of the methodology to evaluate the seismic safety of the nuclear power plants. The site characteristics of the nuclear power plant should be reflected when evaluating the seismic safety of the nuclear power plant. The Korea seismic characteristics are strong in high frequency region and may be different from NRC Regulatory Guide 1.60, which is the design spectrum of nuclear power plants. In this study, seismic response of a nuclear power plant structure by Pohang earthquake (2017.11.15. (KST)) is investigated. The Pohang earthquake measured at the Cheongsong seismic observation station (CHS) is scaled to the peak ground acceleration (PGA) of 0.2 g and the seismic acceleration time history curve corresponding to the design spectrum is created. A nuclear power plant of the containment building and the auxiliary buildings are modeled using OPENSEES to analyze the seismic response of the Pohang earthquake. The seismic behavior of the nuclear power plant due to the Pohang earthquake is investigated. And the seismic performances of the equipment of a nuclear power plant are evaluated by the HCLPF. As a result, the seismic safety evaluation of nuclear power plants should be evaluated based on site-specific characteristics of nuclear power plants.