• 제목/요약/키워드: power plant B

Search Result 384, Processing Time 0.046 seconds

Development of Image Processing Software for UT-NDE of Steam Generator of Nuclear Power Plant (핵발전소 증기발생기의 초음파 비파괴 평가를 위한 영상처리 소프트웨어 개발)

  • Lee, Young-Seock;Nam, Myoung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.2
    • /
    • pp.226-231
    • /
    • 2007
  • This paper describes a development of ultrasonic examination analysis software to analyze steam generator of nuclear power plant. The developed software includes classical analysis method such as A, B, C and D-scan images. This software provides the information of shape, depth, size and position of flaws. To do such, we obtain raw data from specimens and/or real pipeline of power plants and, modify the obtained ultrasonic 1-dimensional data according to prepared software design schedule. The developed analysis software is applied to specimens containing various flaws with known dimensions. The results of applications showed that the developed software provided accurate and enhanced images of flaws on various specimens.

  • PDF

A study on the OAM evaluation model for power telecommunications system (전력통신시스템 신뢰도 평가모델 구성 연구)

  • Lee, W.T.;Lee, J.J.;Kim, K.H.;Oh, M.T.;Lee, B.K.;Lee, W.B.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.1330-1332
    • /
    • 1996
  • Power telecommunication networks is being increased rapidly in that expansion of power plant according to the growth of electric power supply. The requirement of power plant operation & office automation make it to complex and confusing to operate. So, for the sake of correspond to the change, it is necessary that telecommunication network should be high reliable and managed effectively. In this paper, we suggest total reliability evaluation models for power telecommunication network which is based on the QOS(quality of service) standardization techniques recommanded by ITU-T.

  • PDF

Analysis of Battery Performance Test for DC Power System in Nuclear Power Plant (원자력발전소 직류전원계통용 축전지 성능시험 분석)

  • Kim, Daesik;Cha, Hanju
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.2
    • /
    • pp.61-68
    • /
    • 2014
  • Function of battery bank stores energy for DC load in general, and DC power system of the nuclear power plant is used to supply DC loads for safety- featured instrumentation and control such as inverter, class 1E power system control and indication, and station annunciation. Class 1E DC power system must provide a power for the design basis accident conditions, and adequate capacity must be available during loss of AC power and subsequent safe shutdown of the plant. In present, batteries of Class 1E DC power system of the nuclear power plant uses lead-acid batteries. Class 1E batteries of nuclear power plants in Korea are summarized in terms of specification, such as capacity, discharge rate, bank configuration and discharge end voltage, etc. This paper summarizes standards of determining battery size for the nuclear power plant, and analyzes duty cycle for the class 1E DC power system of nuclear power plant. Then, battery cell size is calculated as 2613Ah according to the standard. In addition, this paper analyzes performance test results during past 13 years and shows performance degradation in the battery bank. Performance tests in 2001 and 2005 represent that entire battery cells do not reach the discharge-end voltage. Howeyer, the discharge-end voltage is reached in 14.7% of channel A (17 EA), 13.8% of channel B (16 EA), 5.2% of channel C (6 EA) and 16.4% of channel D (19 EA) at 2011 performance test. Based on the performance test results analysis and size calculation, battery capacity and degradation by age in Korearn nuclear power plant is discussed and would be used for new design.

Numerical Investigation of the Flow and Mixing Characteristics with the Static Mixer in a Catalytic Combustor for the MCFC Power Plant System (MCFC 발전시스템 적용 촉매연소기의 혼합 특성 향상을 위한 Static Mixer의 유동에 관한 수치적 연구)

  • Kim, Chong-Min;Park, Nam-Seob;Kim, Man-Young
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.33 no.3
    • /
    • pp.149-155
    • /
    • 2009
  • In this work a numerical study to find the characteristics of the internal flow and mixing process has been conducted in a static mixer used in the system of catalytic combustor of the fuel cell power plant. After introducing the model description and final governing equations the present numerical approach is applied to the analysis of static mixer, which may have one or more helical elements inside the circular tube by changing such various parameters as incoming mass flow rates and the number of helical elements. The results show that although the static mixer is efficient in mixing fuel and air, more optimization processes are required to achieve the appropriate mixing characteristics in front of the honeycomb type catalytic combustor used in the MCFC power plant

Development of Fuzzy Expert System for Fault Diagnosis in a Drum-type Boiler System of Fossil Power Plant (화력 발전소 드럼형 보일러 시스템의 고장 진단을 위한 퍼지 전문가 시스템의 개발)

  • ;;Zeungnam Bien
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.31B no.10
    • /
    • pp.53-66
    • /
    • 1994
  • In this paper, a fuzzy expert system is developed for fault diagnoisis of a drum-type boiler system in fossil power plants. The develped fuzzy espert system is composed of knowledge base, fuzzification module, knowledge base process module, knowledge base management module, inference module, and linguistic approximation module. The main objective of the fuzzy expert system is to check the states of the system including the drum level and detect faults such as the feedwater flow sensor fault, feedwater flow control valve fault, and water wall bube rupture. The fuzzy expert system diagnoses faults using process values, manipulated values, and knowledge base which is built via interviews and questionaries with the experts on the plant operations. Finally, the validity of the developed fuzzy expert system is shown via experiments using the digital simulator for boiler system is Seoul Power Plant Unit 4.

  • PDF

Thermal Performance Simulation of Cogeneration Power Plants (열병합 발전플랜트의 열성능 해석)

  • Lee, Dong-Won;O, Myeong-Do;Lee, Jae-Heon;Jo, Yeong-Jin
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.25 no.4
    • /
    • pp.451-460
    • /
    • 2001
  • An analysis program for the thermal performance prediction of steam turbine cogeneration systems with multi-extraction, reheat and regeneration has been developed on the basis of the thermodynamic heat balance method. Heat balance analyses were performed for a commercial cogeneration power plant using the program. Its appropriateness was verified by comparing its heat balance results with those of other commercial programs and those provided by the original system designer. Further parametric analyses were carried out and performance improvement measures in designing the plant were suggested.

Expert Knowledge-Based Fuzzy Auto-Tuning of PI Controllers for a Drum-Type Boiler of Fossil Power plant (전문가 지식을 이용한 화력 발전소 드럼형 보일러 PI 제어기의 퍼지 자동 동조에 관한 연구)

  • ;;;Zeungnam Bien
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.28B no.11
    • /
    • pp.941-954
    • /
    • 1991
  • The characteristics of a power plant changes as it operates for a long time and/or for different operating point. As a result, operators must retune gains of the controllers for better performance. In fact, skilled operators can retune the gains in reference to recorded data obtained by a test called dynamic test. The dynamic test, however, requires much time, and can be heavy burden for operators. In this paper, an expert knowledge-based auto-tuner is designed for drum-type boiler controllers of a fossil power plant using fuzzy logic. The performance of the proposed auto-tuner is shown via computer simulation and the simulation results show that the proposed auto-tuner is satisfactory for the desired performance.

  • PDF

Analysis of a Communication Network for Control Systems in Nuclear Power Plants and a Case Study (원자력 발전소 제어 계통을 위한 통신망의 해석과 사례 연구)

  • Lee, S.W.;Yoon, M.H.;Moon, H.J.;Shin, C.H.;Lee, B.Y.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07b
    • /
    • pp.1013-1016
    • /
    • 1999
  • In this paper, a real-time communication method using a PICNET-NP(Plant Instrumentation and Control Network for Nuclear Power plant) is proposed with an analysis of the control network requirements of DCS (Distributed Control System) in nuclear power plants. The method satisfies deadline in case of worst data traffics by considering aperiodic and periodic real-time data and others. In addition, the method was used to analyze the data characteristics of the DCS in existing nuclear power plant. The result shows that use of this method meets the response time requirement(100ms)

  • PDF