• 제목/요약/키워드: post-verification system

검색결과 80건 처리시간 0.032초

New MPPT Control Strategy for Two-Stage Grid-Connected Photovoltaic Power Conditioning System

  • Bae, Hyun-Su;Park, Joung-Hu;Cho, Bo-Hyung;Yu, Gwon-Jong
    • Journal of Power Electronics
    • /
    • 제7권2호
    • /
    • pp.174-180
    • /
    • 2007
  • In this paper, a simple control method for two-stage utility grid-connected photovoltaic power conditioning systems (PCS) is proposed. This approach enables maximum power point (MPP) tracking control with post-stage inverter current information instead of calculating solar array power, which significantly simplifies the controller and the sensor. Furthermore, there is no feedback loop in the pre-stage converter to control the solar array voltage or current because the MPP tracker drives the converter switch duty cycle. This simple PCS control strategy can reduce the cost and size, and can be utilized with a low cost digital processor. For verification of the proposed control strategy, a 2.5kW two-stage photovoltaic grid-connected PCS hardware which consists of a boost converter cascaded with a single-phase inverter was built and tested.

인근 특징 정보를 이용한 임베디드용 지문인식 알고리즘 (Embedded Fingerprint Verification Algorithm Using Various Local Information)

  • 박태근;정선경
    • 한국통신학회논문지
    • /
    • 제30권4C호
    • /
    • pp.215-222
    • /
    • 2005
  • 본 논문에서는 지문의 영상 품질, 특징점의 구조, 융선의 주파수와 방향성 등의 정보들을 이용하여 추출된 특징점들을 기반으로 임베디드 시스템에 적합한 지문인식 알고리즘을 제안하였다. 추출된 특징점들은 전처리 및 후처리 과정을 통해 참 특징점만을 선택함으로 정합과정의 신뢰도를 높였다. 정합과정에서는 지문 획득시 천이, 회전, 눌림 등으로 인한 오차를 고려함으로써 신뢰도를 개선하였으며, 인근 특징점만의 부분 정합을 통하여 전체정합을 위한 참조쌍을 택함으로써 수행시간을 단축하였다. 제안된 지문인식 알고리즘은 Arm920T .프로세서 환경하에서 구현되어 검증되었으며 실시간처리를 위한 다양한 방법이 적용되었다. 지문 등록부터 인식까지 처리시간은 0.541초로 실시간 임베디드 응용분야에 적용 가능함을 보여주었으며 이때 FRR(본인 거부율)과 FAR(타인 승인율)는 각각 0.079과 0.00005로 높은 신뢰도를 갖는다.

중량충격음 평가방법 변화에 따른 단일수치평가량 기여 주파수 대역 사례 분석 (Case study on frequency bands contributing the single number quantity for heavy-weight impact sound based on assessment method changes)

  • 신혜경;박상희;김경우
    • 한국음향학회지
    • /
    • 제42권6호
    • /
    • pp.565-571
    • /
    • 2023
  • 사후확인제 도입으로 현장에서의 바닥충격음 성능 측정이 의무화되고, 평가 방법이 변경되었다. 제도 변화에 따른 바닥충격음 성능 변화를 추적하기 위해서는 변경된 평가방법에 따라 중량충격음 특성이 어떻게 나타나는지에 대한 연구가 필요하다. 본 연구에서는 평면과 바닥구조가 동일한 하나의 아파트 건물에 위치한 59세대를 대상으로 충격원 및 평가지표에 따라 단일수치평가량을 결정하는 주파수 대역의 기여율을 분석하였다. 단일수치평가량에 따른 주파수대역별 기여도 산출방법이 상이하여 단순 비교는 어려우나, 사후확인제 도입 이전 평가방법(뱅머신 측정 및 L'i,Fmax,AW으로 평가)에서는 63 Hz가 미치는 기여율은 평균 80.8 %로 나타났으며, 125 Hz가 미치는 기여율은 평균 19.2 %으로 나타났다. 현행 평가방법(고무공 측정 및 L'iA,Fmax으로 평가) 에서는 기여율은 50 Hz ~ 80 Hz에서 평균 33.1 %, 100 Hz ~ 160 Hz에서 평균 58.7 %, 200 Hz ~ 315 Hz에서 평균 6.9 %, 400 Hz ~ 630 Hz에서 평균 1.3 %으로, 63 Hz 대역의 기여도가 낮아진 것으로 나타났다. 이 결과는 대상 공동주택에 대한 사례 분석 내용으로, 더 다양한 공동주택에 대한 측정 데이터를 분석할 필요가 있다.

Development of Real-time Mission Monitoring for the Korea Augmentation Satellite System

  • Daehee, Won;Koontack, Kim;Eunsung, Lee;Jungja, Kim;Youngjae, Song
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제12권1호
    • /
    • pp.23-35
    • /
    • 2023
  • Korea Augmentation Satellite System (KASS) is a satellite-based augmentation system (SBAS) that provides approach procedure with vertical guidance-I (APV-I) level corrections and integrity information to Korea territory. KASS is used to monitor navigation performance in real-time, and this paper introduces the design, implementation, and verification process of mission monitoring (MIMO) in KASS. MIMO was developed in compliance with the Minimum Operational Performance Standards of the Radio Technical Commission for Aeronautics for Global Positioning System (GPS)/SBAS airborne equipment. In this study, the MIMO system was verified by comparing and analyzing the outputs of reference tools. Additionally, the definition and derivation method of accuracy, integrity, continuity, and availability subject to MIMO were examined. The internal and external interfaces and functions were then designed and implemented. The GPS data pre-processing was minimized during the implementation to evaluate the navigation performance experienced by general users. Subsequently, tests and verification methods were used to compare the obtained results based on reference tools. The test was performed using the KASS dataset, which included GPS and SBAS observations. The decoding performance of the developed MIMO was identical to that of the reference tools. Additionally, the navigation performance was verified by confirming the similarity in trends. As MIMO is a component of KASS used for real-time monitoring of the navigation performance of SBAS, the KASS operator can identify whether an abnormality exists in the navigation performance in real-time. Moreover, the preliminary identification of the abnormal point during the post-processing of data can improve operational efficiency.

스트라치 시스템의 긴장응력해석을 위한 명시적 해석법의 개발 (A Development of Explicit Algorithm for Stress-Erection Analysis of STRARCH System)

  • 이경수;한상을
    • 한국전산구조공학회논문집
    • /
    • 제24권5호
    • /
    • pp.513-520
    • /
    • 2011
  • 본 연구에서는 스트라치 시스템의 긴장설치과정 해석을 수행하기 위한 개선된 명시적 해석법을 제안하였다. 스트라치 시스템은 Stressed-Arch에서 유래한 용어로 슬리브에 의한 갭이 도입된 유동 하현재가 내부의 긴장재에 의한 초기장력의 도입으로 서서히 닫히게 되고, 이에 따라 전체 구조물이 상승하여 최종적인 아치형태의 구조물을 형성하는 독창적인 구조시스템이다. 스트라치 시스템의 초기장력 도입과정을 긴장설치(stress-erection process) 과정이라 하며, 초기곡률의 도입에 따라 유동 상현재에는 과도한 초기변형이 발생하여 소성거동에 의한 강체회전이 발생하는 불안정 구조물이 된다. 본 연구에서는 이러한 스트라치 시스템의 불안정 거동특성을 해석하기 위해서 소성힌지가 적용된 보-기둥요소를 사용하여 유동상현재를 모델링하였고, 불안정 구조물의 해석법에 효과적으로 사용되는 동적이완법의 개선된 알고리즘을 개선하여, 실제 스트라치 구조물의 긴장설치과정 해석을 수행하였으며, 실제 프로젝트에 대한 해석결과의 분석을 통하여 제안된 해석법의 적용성을 검증하였다.

MAC 방식 TV 시스템용 IC의 설계 - III. 신호 및 클럭 복원기 (VLSIs for the MAC TV System - Part III. A Data and Clock Recovery Circuit)

  • 문용;정덕균
    • 전자공학회논문지B
    • /
    • 제32B권12호
    • /
    • pp.1644-1651
    • /
    • 1995
  • A data and clock recovery integrated circuit for MAC (Multiplexed Analog Component) TV standard is described. The chip performs the recovery of a system clock from a digitally encoded voice signal, clamping of a video signal for DC-level restoration, and precise gain control of a video signal in the presence of a large amplitude variation. A PLL (Phase Locked Loop) is used for timing recovery and a new gain control circuit is proposed which enhances its accuracy and dynamic range by employing two identical four-quadrant analog multipliers. The chip is designed in full custom with 1.5um BiCMOS technology, and layout verification is completed by post-simulation with the extracted circuit.

  • PDF

전정기 기능 향상을 위한 회전과 구르기 훈련 프로그램의 개발 및 검증 (Development and Verification of Treatment Programs by Turn and Roll Types to Improve the Function of Vestibular System)

  • 박양선;강성호;임영태
    • 한국운동역학회지
    • /
    • 제22권2호
    • /
    • pp.209-217
    • /
    • 2012
  • The purpose of this study was to develop a turn-type treatment program which applies the principle of spotting and a roll-type treatment program that induces off-vertical axis. 29 collegiate students volunteered for this study. 12-week treatment programs were applied to both 15 students for turn-type treatment group and 14 students for roll-type treatment group. As an analytic tool, eye camera was employed to verify the treatment programs for a stimulus upon a turn, recovery after a stimulus upon a turn, and nystagmus that affects a vestibular system. Two-way ANOVA with repeated measures was applied to see the significant differences between the treatment groups, and between the test periods. For Post-Hoc Test, paired t-test was used to within the group and independent t-test was used to between the groups. The results indicated that roll-type treatment training has maximized a stimulus on nystagmyus during the stimulus by a roll. Turn-type treatment training has maximized a stimulus on nystagmyus right after a stimulus by a roll and significantly decreased the intensity of nystagmyus during the recovery. Both turn and roll type treatments have reduced the recovery time which from nystagmyus to a normal status. Roll-type treatment has showed a much shorter recovery time for nystagmyus than the roll-type treatment has. Based on the results of treatment programs developed in this study, we expect the treatment programs can be applied to treat dizziness and to improve the function of vestibular system as a rehabilitation tool.

레지스터 전달 수준 설계단계에서 사전 클럭트리합성 가능여부 판단을 위한 경량화된 클럭트리 재구성 방법 (Lightweighted CTS Preconstruction Techniques for Checking Clock Tree Synthesizable Paths in RTL Design Time)

  • 권나영;박대진
    • 한국정보통신학회논문지
    • /
    • 제26권10호
    • /
    • pp.1537-1544
    • /
    • 2022
  • application specific integrated circuit (ASIC) 및 system on chip (SoC) 설계 시 디지털 회로는 클럭에 동기화되어 작동한다. 칩 설계 시, place & route (P&R)에서 설계 조건과 타이밍 조건, 클럭의 동기화 여부 등을 고려한다. P&R에서 클럭 경로에 대한 delay를 줄이기 위해, clock tree synthesis (CTS) 기법을 이용한다. 본 논문에서는 사전 클럭트리 합성 가능 여부 판단을 위한 shallow-CTS 알고리즘을 소개한다. 오픈 소스 Parser-Verilog를 사용하여 register transfer level (RTL) 합성가능한 Verilog를 파싱하여, Pre-CTS와 Post-CTS 단계를 진행하고, 가장 긴 clock path와 버퍼 삽입 전후의 표준편차를 비교하여 CTS의 정확도에 대해 분석한다. 본 논문에서 시간 투입이 많이 되는 licensed EDA tool을 사용하여 CTS 결과를 확인하지 않고, RTL 수준에서 사전 클럭 트리 합성 검증 방법을 제공하여 비용 및 시간문제를 감소할 수 있을 것으로 기대된다.

고속열차의 주행 동적성능 평가시스템 개발 (Development of Performance Evaluation System for a High-speed train)

  • 박은천;강형구;최준성;김은성;김만철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.3226-3236
    • /
    • 2011
  • In this paper, with the background features on which measuring the transverse left-right and up -down vibration of wheel, bogie and body by wireless measurement system, performance evaluation systems which can assess the running behavior of high speed trains based on UIC code 518-OR and evaluate the ride comfort of them based on ISO code 2631 and UIC code 513 were developed. The characteristics of dynamic vibration are generally analyzed by an acceleration of a car body of high speed train and the acceleration can be applied to evaluation of running safety. In this paper, also matching system of distance from tachometer and vibration from accelerometer was programmed in development software, and the SD card embedded system which prevent to loss of data in wireless measurement was mounted on this system. Finally the software perform to analysis with filtering and statistical post-process in the unit sections and zones and focus on developing the capability monitoring in the main control center. For the verification of this system, the running behavior and safety factor were analyzed based on field measured data of the Cheonjun-gunnum-sun turn out point in the new KTX railway.

  • PDF

터보펌프 터빈의 열구조적 적합성 검증을 위한 터빈로터-파이로시동기 연계시험 (Turbine Rotor-Pyrostarter Coupled Test for the Verification of Thermo-Structural Suitability of a Turbopump Turbine)

  • 정은환;강상훈;홍문근;이항기;이수용;김진한
    • 한국추진공학회지
    • /
    • 제18권1호
    • /
    • pp.65-72
    • /
    • 2014
  • 터보펌프 터빈로터의 열구조적 적합성 검증을 위한 터빈로터-파이로시동기 연계시험을 수행하였다. 새로운 추진제를 적용한 파이로시동기와 열응력 경감 설계 및 터빈 동익 표면 건전성 향상을 위한 후 가공 공정이 적용된 터빈로터시편이 시험에 사용되었다. 시험은 75톤급 엔진시동을 위한 파이로 시동기의 연소가스를 터보펌프 터빈로터와 동일한 형상의 시편에 분사하는 방식으로 이루어졌다. 터빈에 가해지는 열 부하는 운용 설계점에서 극한 조건까지 세 종류로 구분하여 시험을 진행하였으며 모든 시험에서 터빈로터의 손상은 발견되지 않았다.