• Title/Summary/Keyword: post-construction evaluation

Search Result 173, Processing Time 0.018 seconds

Evaluation of the Nutrient Removal Performance of the Pilot-scale KNR (Kwon's Nutrient Removal) System with Dual Sludge for Small Sewage Treatment (소규모 하수처리를 위한 파일럿 규모 이중슬러지 KNR® (Kwon's nutrient removal) 시스템의 영얌염류 제거성능 평가)

  • An, Jin-Young;Kwon, Joong-Chun;Kim, Yun-Hak;Jeng, Yoo-Hoon;Kim, Doo-Eon;Ryu, Sun-Ho;Kim, Byung-Woo
    • Clean Technology
    • /
    • v.12 no.2
    • /
    • pp.67-77
    • /
    • 2006
  • A simple dual sludge process, called as $KNR^{(R)}$ (Kwon's Nutrient Removal) system, was developed for small sewage treatment. It is a hybrid system that consists of an UMBR (Upflow multi-layer bioreactor) as anaerobic and anoxic reactor with suspended denitrifier and a post aerobic biofilm reactor, filled with pellet-like media, with attached nitrifier. To evaluate the stability and performance of this system for small sewage treatment, the pilot-scale $KNR^{(R)}$ plant with a treatment capacity of $50m^3/d$ was practically applied to the actual sewage treatment plant, which was under retrofit construction during pilot plant operation, with a capacity of $50m^3/d$ in a small rural community. The HRTs of a UMBR and a post aerobic biofilm reactor were about 4.7 h and 7.2 h, respectively. The temperature in the reactor varied from $18.1^{\circ}C$ to $28.1^{\circ}C$. The pilot plant showed stable performance even though the pilot plant had been the severe fluctuation of influent flow rate and BOD/N ratio. During a whole period of this study, average concentrations of $COD_{cr}$, $COD_{Mn}$, $BOD_5$, TN, and TP in the final effluent obtained from this system were 11.0 mg/L, 8.8 mg/L, 4.2 mg/L, 3.5 mg/L, 9.8 mg/L, and 0.87/0.17 mg/L (with/without poly aluminium chloride(PAC)), which corresponded to a removal efficiency of 95.3%, 87.6%, 96.3%, 96.5%, 68.2%, and 55.4/90.3%, respectively. Excess sludge production rates were $0.026kg-DS/m^3$-sewage and 0.220 kg-DS/kg-BOD lower 1.9 to 3.8 times than those in activated sludge based system such as $A_2O$ and Bardenpho.

  • PDF

Auxiliary Reinforcement Method for the Safety of Tunnelling Face (터널 막장안정성에 따른 보강공법 적용)

  • Kim, Chang-Yong;Park, Chi-Hyun;Bae, Gyu-Jin;Hong, Sung-Wan;Oh, Myung-Ryul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.2
    • /
    • pp.11-21
    • /
    • 2000
  • Tunnelling has been created as a great extent in view of less land space available because the growth of population in metropolitan has been accelerated at a faster pace than the development of the cities. In tunnelling, it is often faced that measures are obliged to be taken without confirmation for such abnormality as diverged movement of surrounding rock mass, growing crack of shotcrete and yielding of rockbolts. In this case, it is usually said that the judgments of experienced engineers for the selection of measure are importance and allowed us to get over the situations in many construction sites. But decrease of such experienced engineers need us to develop the new system to assist the selection of measures for the abnormality without any experiences of similar tunnelling sites. In this study, After a lot of tunnelling reinforcement methods were surveyed and the detail application were studied, an expert system was developed to predict the safety of tunnel and choose proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database. The expert system developed in this study have two main parts named pre-module and post-module. Pre-module decides tunnel information imput items based on the tunnel face mapping information which can be easily obtained in-situ site. Then, using fuzzy quantification theory II, fuzzy membership function is composed and tunnel safety level is inferred through this membership function. The comparison result between the predicted reinforcement system level and measured ones was very similar. In-situ data were obtained in three tunnel sites including subway tunnel under Han river. This system will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system developing more resonable tunnel support method from dependance of some experienced experts for the absent of guide.

  • PDF

Research on the Importance-Satisfaction Perception of Users of Private-Initiated Park Development Project - Focused on Jikdong Neighborhood Parks in Uijeongbu City - (민간공원 특례사업 추진 대상지 이용객의 중요도-만족도 인식에 관한 연구 - 의정부 직동근린공원을 대상으로 -)

  • Kim, Jong-Ho;Kim, Gun-Woo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.63-76
    • /
    • 2022
  • This study was conducted to compare the perceptions of the park use status, importance, and satisfaction of users in the first implemented and completed Uijeongbu Jikdong Neighborhood Park among the private park special projects carried out as a countermeasure for long-term non-execution of urban parks. To this end, in the initiated project, apartment residents and non-residents were classified according to the promotion plan, and a questionnaire research on importance and satisfaction was conducted to analyze the park use status and IPA(importance-performance analysis). First, as a result of the analysis of the current situation in terms of locational characteristics that occur during the promotion of special projects for private parks, unlike the mountainous areas, the targeted site was close to flat land, indicating that users' satisfaction with the landscape was high. Second, the access of the apartment residents in the initiated project site was easy. Thus, the use rate of residents was relatively higher than that of the non-residents. Third, differences in perception by item were identified through the analysis of IPA and the establishment of strategies. In quadrant I, among the facilities and services, installing restrooms was the priority for residents, and parking facilities and rest facilities were the priority than installing restrooms for non-residents. In quadrant II, overall scores for residents and non-residents were similar, but the distance to the park was in quadrant III due to the low level of satisfaction among non-residents. In this study, the difference in perception between residents and non-residents may cause problems in access and facilities in managing the park in the future. Therefore, it would be necessary to find a way to improve it by establishing a management strategy that takes into account the difference in the perception of residents after construction. In addition, through the results of this study, it was judged that the purpose of park development, the selection of types of parks, and the selection of plans and management indicators for each kind would be significant in the promotion of initiated projects in the planning of park development.