Kim, Hyung-Chul;Lee, Won-Chan;Kim, Jong-Gu;Hong, Sok-Jin;Kim, Kyoung-Mi;Cho, Yoon-Sik;Park, Sung-Eun;Kim, Jin-Ho
Journal of the Korean Society of Marine Environment & Safety
/
v.17
no.4
/
pp.345-356
/
2011
Based on the consideration of land based pollutant discharges from the basin and seawater quality related carrying capacity and the seawater quality improvement in receiving water bodies of Yeoja Bay where eutrophication and organic pollution are in progress, were evaluated. The permissible inflow loads of BOD, TN and TP by using the geographical features and box modelling method were estimated. As results, it is shown that the reduction rate of discharged BOD and TP loads were 39.3% and 30.8 %, respectively, however, 6.9% was estimated for TN. According to the pollutant loading in each tributary and generated load of the basin, it is given much weight on the land use group, and also was shown in discharged load estimation. This suggests that it is important to control nonpoint source pollutant such as livestock and land use groups as well as point source to contribute the proposition of the water quality improvement plan according to the characteristics of the bay.
The Construction of industrial complex areas means the increase of imperviousness rate and the increase of nonpoint pollutant emissions during a rainfall. Generally the retention basin can become the alternative for removing and controling these nonpoint pollutants. Recently Ministry of Environment are trying to change the purpose of retention basins from flooding control to nonpoint pollutant control. In order to propel the stormwater management program, administration plan of stormwater management is enacted in Spring, 2005. Hereafter, in a newly developing area, the best management practices should be established to control the nonpoint pollutant. Landuses of the research area are classified to the categories of the 1st manufacturing industry, metal industry, fiber and chemical product manufacturing industry, etc. Therefore, this research was performed to understand washed-off characteristics of stormwater and to suggest the controling method of nonpoint pollutants. The optimum capacity of the retention basin can be determined by analyzing the relationships among data of rainfall, runoff, washed-off pollutants from the areas. The rainfall analysis using the data of normal year, recent 2, 5 and 10 years shows that the 80% rainfall frequency was occurred on 10mm accumulated rainfall, but which is not considered the first flush effect. However, by considering the first flush effect, the appropriate treatment capacity of rainfall can be decreased to 4-5mm accumulated rainfall. Using the criteria, the optimum capacity of retention basin is determined to $12,000m^3$ in the research area. The washed-off nonpoint pollutant loading from the areas have beeb calculated to 435ton/yr for TSS, 238ton/yr for COD, 8,518kg/yr for TKN and 1,816kg/yr for TP. The mass of 78.3ton/yr for TSS, 20.4ton/yr for BOD, 128.6ton/yr for COD, 4.6ton/yr for TKN and 980kg/yr for TP can be reduced by constructing the retention basin. The sediment accumulation rate is also calculated by $6.53kg/m^2-hr$.
Journal of Korean Society of Environmental Engineers
/
v.28
no.6
/
pp.648-653
/
2006
As an alternative for the traditional materials packed in biofilters treating gaseous VOCs, a novel packing material has been developed and tested. In the packing material(named as Hydrogel Bead, HB), pollutant-degrading microorganisms were immobilized in hydrogel consisted of alginate, polyvinyl alcohol(PVA), and powdered activated carbon. A closed-bottle study showed that the HB rapidly removed gaseous styrene without the losses of adsorption and biodegradation capacity. Biofilter column experiments using the HBs also demonstrated that greater than 95% of removal efficiencies were found at an inlet styrene loading rate of $245g/m^3/hr$, which was higher biofilter performance than other elimination capacity reported earlier. Furthermore, when the inlet styrene concentration increased stepwise, the adsorption played an important role in overall styrene removals. The absorbed styrene was found to be biodegraded in the following low inlet loading condition. Consequently, the new HB material is able to successfully minimize the drawbacks of activated carbon(necessity of regeneration) and biological processes(low removal capacity at dynamic loading conditions), and maximize the overall performance of biofilter systems treating VOCs.
Hydrocyclone is widely used in industry, for its simple design, high capacity, low maintenance and low operational cost. The objective of this study is to develop hydrocyclone coagulation and filtration system. The system is made of hydrocyclone ballasted coagulation with polyaluminium chloride silicate (PACS) and upflow filter to treat micro particles in urban storm runoff. Roadside sediment particles (< $200{\mu}m$) was mixed with tap water to make various turbid suspensions to simulate urban storm runoff. The filter cartridge was filled with polyethylene media system and ran 1hr per everyday and total operation time were 8.19hrs and backwashing everyday after end of operation. The operation condition of flowrate was $8.2{\sim}11.9m^3/day$ (mean $10.1m^3/day$) and surface overflow rate (SOR) based on filter surface area was $45.5{\sim}65.9m^3/m^2/day$ (mean $55.7m^3/m^2/day$). The range of PACS dosage concentration was 14.0~31.5 mg/L. As the results of operation, the range of removal efficiency of turbidity, SS were 81.0~95.8% (mean 89.5%) 81.8~99.0% (mean 91.4%), respectively. An increase of filtration basin retention time brought on increased of removal efficiency of turbidity and SS, and increase of SOR brought on decreased of removal efficiency. During the first flush in urban area, storm runoff have an high concentration of SS (200~600 mg/L) and the filtration bed becomes clogged and decreased of removal efficiency. Backwashing begins when the drainage pipe valve at the filtration tank bottom is completely open (backwashing stage 1). Backwashing stage 2 was using air bubbles and water jet washing the media for 5 mins and open the drainage valve. After backwashing stage 1, 2, 61.83~64.04%, 18.53~27.51% of SS loading was discharged from filtration tank, respectively. Discharged SS loading from effluent was 7.12~14.79% and the range of residual SS loading in fliter was 2.26~5.00%. The backwashing effects for turbidity, SS were 89.5%, 91.4%, respectively. The hydrocyclone coagulation and filtration with backwashing system, which came out to solve the problems of the costly exchange filter media, and low efficiency of removing micro particles of filter type nonpoint treatment devices, is considered as an alternative system.
Journal of Korean Society of Environmental Engineers
/
v.22
no.3
/
pp.535-546
/
2000
Juam lake is a major water resource for the industrial and agricultural activities as well as the resident life of Kwangju and Chonnam area. However, the water quality of the lake is getting worse due to a large quantity of pollutant inflowing to the lake. As a preliminary step in making the countermeasure to achieve the water quality goal of the lake. it is necessary to understand how the water quality of the lake will be in future. Several computer programs can be used to predict the water quality of lake. Each of these programs requires a number of input data such as hydrological and meteorological data. and the quantity of the pollutant inflowed. but some or most of the input data contain uncertainty. which eventually results in the uncertainty of prediction value (future level of water quality). Generally. the uncetainty stems from the lack of information available. the randomness of future situation. and the incomplete knowledge of expert. Thus. the purpose of this study is to present a method for representing the degree of the uncertainty contained in input data by applying fuzzy theory and incorporating it directly into the water quality modeling process. By using the method. the prediction on the future water quality level of Juam lake can be made that is more appropriate and realistic than the one made without taking uncertainty in account.
Journal of the Korea Organic Resources Recycling Association
/
v.14
no.4
/
pp.151-160
/
2006
Anaerobic treatment of landfill leachate was studied to investigate the behaviors of pollutant and the characteristics of microorganism for 10 months. The upflow anaerobic sludge blanket (UASB) reactor achieved about 90% chemical oxygen demand (COD) removal at organic loading rates(OLR) up to $20kgCOD/m^3.d$. At higher OLR ($8-20kgCOD/m^3.d$), the propionate concentration increased, indicating that converting propionate to acetate was the rate-limiting step. Nevertheless, increase in the precipitate inside and on the surface of granules as well as on the wall of the reactor resulted in operational problems. The main inorganic precipitate in the granule was calcium compound. Although specific methanogenic activity (SMA) was not affected seriously in this study, metals had to be removed prior to anaerobic treatment so as to be free from the excessive inorganic accumulation that resulted in operational problems.
Journal of The Korean Society of Agricultural Engineers
/
v.47
no.1
/
pp.93-102
/
2005
A prototype surface flow constructed wetland was built in the upstream area of Sihwa reclaimed tidal lands to improve the water quality of Lake Sihwa by treating severely polluted stream water. In this study, we monitored hydrology, macrophyte (Phragmites communis Trin,) growth, and water quality in the Banwol and Donghwa wetlands to evaluate their performance during the initial period after the completion of wetland construction, The average removal efficiency($\%$) in each wetland was relatively low compared with the performance data from the North America Wetland Treatment System Database (NADB), which mainly includes urban sewage-treatment wetlands. However, the average removal rates per unit area ($g/m^{2}/day$) were 0.72, 0.72 and 0.51 (BOD), 2,04, 2.46 and 0.70 (SS), 0.89, 0.43 and 1.09 (TN) and 0.02, 0.02 and 0.02 (TP) in the Banwol and Donghwa wetlands and NADB, respectively. The overall performance of the Banwol and Donghwa wetlands was within the expected range of the wetland system processes contributing the reduction of the pollutant load to Lake Sihwa during the initial period of wetland operation. Considering the low influent concentration, high hydraulic loading rate, and insufficient macrophyte growth since the wetland was constructed, better performance is expected if an improved operational scheme is adopted.
Journal of the Korea Organic Resources Recycling Association
/
v.27
no.1
/
pp.57-64
/
2019
We investigated influence of connected influent on the treatability of a wastewater treatment plant (WWTP), recently accepting effluent from a sludge carbonization facility. Based upon the pollutant loading rates (kg/d) of each connected influent, food waste leachate and livestock wastewater contributed to high BOD and COD loadings, while sludge carbonization facility effluent certainly contributed to T-N and $NH_3-N$ loadings. The nitrification rate in aerobic tank decreased to 55% with the carbonization facility effluent entering to the WWTP, while it was 89% with no carbonization facility effluent entering. The sludge carbonization facility effluent may need to be pretreated to reduce T-N and $NH_3-N$ loadings before entering to the WWTP for further treatment.
In order to estimate the non-point pollution loads from each watersheds among 209 watersheds, the calibration and validation of HSPF model were carried out based on 2012 in 2013 years. In the case of flow rate, R2 of calibration and validation were 0.71~0.93 and 0.71~0.79, which were relatively good values. With the respect to calibration of water quality, % differences between measured and simulated values were 0.4 ~ 9.7 of DO, BOD 0.5 ~ 30.2% and TN 1.9~28.6% except for Hwhangkang B site. In case of validation, DO was 0.2 ~ 13.7%, BOD 1.3~23% and TN 0.5~24.3% excluding Hwhangkang B. However, since the concentration of TP was very small compared with other items, the range of difference was large as 0.8~55.3%. level. As the result of calculating annual accumulative BOD loads for each watershed, it was found that RCH 123 (Uryeong, Gyeongsangnamdo), RCH 121 (Jinju, Gyeongsangnamdo) and RCH 92 (Daegu) were the high ranked. The unit watersheds including various landuse type susch as forest and agricultural sites in mainstream areas have a higher BOD nonpoint pollution load than those in dam regions. However, the results of the annual cumulative loading of the basins for nutrients did not appear to be consistent with the BOD annual cumulative loading ranks. Other factors that represent watershed characteristics such as landslope and soiltypes, including landuse pattern, have been found to be closely related to nonpoint pollutant loads.
In order to develop constructed wetlands for treating hydroponic wastewater in greenhouse, actual constructed wetlands were used the obtained optimum condition in previous study, and the removal rate of pollutant in the water according to 4 kinds connection method of piping such as system A (UP-UP stream), system B (UP-DOWN system), system C (DOWN-UP stream) and system D (DOWN-DOWN stream) were investigated. Removal rate of biochemical oxygen demand (BOD), chemical oxygen demand (COD), suspended solids (SS), total nitrogen (T-N) and total phosphorus (T-P) by system A (UP-UP stream) connection method in actual constructed wetlands were slightly higher than other systems. At the system A, the removal rate of BOD, COD, SS, T-N and T-P were 88, 77, 94, 54 and 94%, respectively. Under different hydroponic wastewater loading, the removal rates of pollutants were higher in the order of $75L\;m^{-2}day^{-1}{\fallingdotseq}150L\;m^{-2}day^{-1}$$$\geq_-$$$300L\;m^{-2}day^{-1}$. Therefore, optimum connection method was system A for treating hydroponic wastewater in greenhouse.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.