Siddique, Md Abu Ayub;Kim, Wan Soo;Baek, Seung Yun;Kim, Yong Joo;Park, Seong Un;Choi, Chang Hyun;Choi, Young Soo
드라이브 ㆍ 컨트롤
/
제17권4호
/
pp.125-132
/
2020
The objective of this study was to analyze the axle load of a rice transplanter when planting rice seedlings at different working load conditions to select a suitable gear stage and a constant planting depth for rice seedlings. In this study, there are four levels of planting distances (26, 35, 43, and 80 cm) and three planting depths (low, medium, and high) with two gear stages (1.3 and 1.7 m/s). Axle loads and required planting pressures were analyzed statistically. It was observed that axle torques were increased with increasing planting depths for both gear stages, meaning that axle torques were directly proportional to planting depths for both gear stages. It was also observed that required planting pressures had a significant difference between planting distances. Planting pressures also showed significant difference according to gear stage and planting depth. These results indicate that planting pressures were directly proportional to both gear stage and planting depth. Results revealed that the automatic depth control system of a rice transplanter could not guarantee a constant planting depth as supplied pressures were variable. This indicates that a control algorithm is needed to ensure a constant planting depth. In the future, a control algorithm will be developed for an automatic depth control system of a rice transplanter to improve its comprehensive performance and efficiency.
The purpose of this study is to find out the determination method of designed duty of water in the rice fields through the comparison of the net unit duty of water at the late reduction division to heading stage with that at the planting stage. The data used for analysing this problem are the data of precipitation and gauge evaporation observed by Cheong-ju Meterological Center, the coefficient of evapotranspiration by College of Agriculture, Chung Buk University and the data of transplanting progressing in Boun area. The results obtained from this analysis are summarized as follows. 1.The occurring year of 1/10 probability value for available precipitation, gauge evaporation and mean maximum daily evapotranspiration during growing season is the year of 1977. 2.The 1/10 probability values of mean maximum evapotranspiration per day under the production rate of 1, 400kg/l0a and 1, 500kg/10a based on the weight of dry matters are 9. 2mm/day and 9. 6mm/day, respectively. 3.The net unit duty of water required in the fields that the maximum planting rate exists is more than the one in the fields that the planting rate is uniform in the planting stage. 4.The determination of net unit duty of water in the late reduction division to heading stage or the planting stage depends upon the daily evapotranspiration and percolation rate in the late reduction division to heading stage or the water depth required for planting and daily consumptive use of water after planting at the planting stage. Therefore the use of figure 5-(1) to figure 5-(6) can easily make the determination of the designed net unit duty of water out of above two kinds of net unit duty of water.
Silage corn (Zea mays L) is grown extensively in livestock operations, and many managements focus on forage yield. This experiment was conducted at Seoul National University (SNU) Experimental Livestock Farm, Suwon in 1998. We determined the effect of planting date and harvest stage on forage yield and quality responses of corn hybrids (five relative maturity groups). The five maturity groups (100 d, 106 d, 111 d, 119 d and 125 d) were planted on 15 April and 15 May, and harvested at maturity stages (1/3, 1/2 and 2/3 kernel milkline). Whole plant dry matter (DM) and ear percentages had significant differences among corn hybrids. Ear percentages of early maturing corns (100 d and 106 d) were higher than for other hybrids. Ear percentage at the early planting date was higher than that at the late planting date for all corn hybrids. The DM and total digestible nutrients (TDN) yields of the 106 d and 111 d corn hybrids were higher than other hybrids, and the DM and TDN yields at the early planting date were higher than that at the late planting date. The acid detergent fiber (ADF) and neutral detergent fiber (NDF) percentages were greater for the late maturity corn hybrids. For plants of the early planting date, the ADF and NDF percentages were lower than for those of late planting date for hybrids. From the comparison among harvest stages, ADF and NDF percentages were decreased as harvest stage progressed. The TDN, net energy for lactation (NEL), and cellulase digestible organic matter of dry matter (CDOMD) were decreased as maturity of corn hybrid delayed. The TDN, NEL, and CDOMD values at the early planting date were higher than those at the late planting date among for corn hybrids. From the comparison among harvest dates, TDN, NEL, and CDOMD values were increased as harvest stage progressed. The correlation coefficient for DM percentage of grain at harvest with DM and TDN yields were 0.68*** and 0.76***, respectively. And the correlation coefficient for ear percentage with ADF, NDF, and CDOMD were -0.81***, -0.82*** and 0.73***, respectively. Our study showed differences of silage corn in forage production and quality resulting from hybrid maturity, planting date, and harvest stage. We believe that for the best silage corn, selection of the hybrid and best management practices are very important.
Seedling establishment of soybean [Glycine max (L.) Merr.] is a critical factor in production system and cultural practices. The objective of this study was to identify the components of soybean seedling developments encompassing planting dates and cultivars that respond to emergence, early growth stage and dry matter accumulation. Three soybean cultivars, Hwangkeumkong, Shinpaldalkong 2, and Pungsannamulkong, were planted at Baegsan silty loam soil. Planting date was May 13, June 3, and June 24 in 2001. Sprinkler irrigation was accompanied with 30mm after seeding for three planting dates. Soybean seedlings were sampled at the growth stages from VE to V5. Days to emergence of soybean seedlings were taken 8 at May 13 and 5 at June 24 plantings. Emergence percentage was over 90 at three planting dates. May 13 planting took 33 days and June 24 planting was 25 days for reaching V5 growth stage. Cotyledon number was decreased after V2. Significant cultivar difference was found in cotyledon dry weight until V2 which differed in seed dry weights at the planting times. Leaf and total dry weights of soybean seedlings were not differed from V1 to V3 among planting dates and cultivars. Leaf water contents were generally ranged 78 to 85%. Branch was appeared from V4. Leaf/stem ratio among cultivars was similar at five growth stages and gradually increased from 2.1 at V1 to 2.8 at V5. The results based on this experiment indicated that seedling establishment of soybean was continued from VE to V3 growth stages affecting mainly by planting date and soil moisture.
Planting date of soybeans [Glycine max (L.) Merr.] is one of production components in cultural systems. The objective of the current study was to identify the components of soybean production and cultural practices encompassing planting dates and cultivars that respond to dry matter accumulation, harvest index and yield components. Three determinate soybean cultivars were planted on May 13 (early), June 3 (mid), and June 24 (late). Planting density was 60$\times$15cm with 2 seeds (222,000 plants per ha). Soybean plants were sampled every 10 days interval from the growth stages of V5 to R8 and separated into leaves including petioles, stems, pods, and seeds. Dry matter accumulations, harvest indices, and yield components were measured. Early planting had taken 55 days from VE to R2 and late planting taken 39 days indicating reduced vegetative growth. Early planting showed higher leaf, stem, pod and seed dry weights than late planting. However, late planting appeared to be higher harvest index and harvesting rate. Vegetative mass including leaf and stem increased to a maximum around R4/R5 and total dry weight increased to a maximum around R5/R6 and then declined slightly at R8. The highest seed yield was obtained with mid planting and no difference was found between early and late plantings. Cultivar differences were found among planting dates on growth characteristics and yield components. The results of this experiment indicated that soybean yield in relation to planting dates examined was mainly associated with harvest index and harvesting rate, and planting date of cultivars would be considered soybean plants to reach the growth stage of R4/R5 after mid August for adequate seed yield.
우리나라 건축법에 따르면, $200m^2$ 이상의 대지 위에 건축행위를 하기 위해서는 반드시 일정면적비율 이상의 식재를 실시해야 한다. 대규모 개발에서는 이 법규가 잘 지켜지나, 소규모 개발에서는 잘 지켜지지 않고 있기 때문에 소규모 개발에 대해서는 특별한 관심이 기울여져야 한다. 따라서 이 연구의 목적은 대지의 조경에 대한 국내외 사례를 분석하고 서울시에서 소규모 대지에 대한 조경관리 실태분석을 통해 소규모 대지의 조경 설치 및 사후관리에 대한 합리적인 개선 방안을 마련하는 것이다. 이 연구에서는 2002년도에 서울시 성북구와 강남구를 대상으로 조사된 조경 실태자료를 사용하였고, 추가 현장조사와 담당공무원 및 건물소유주에 대한 설문조사를 수행하였으며, 그 분석결과를 토대로 건축단계별로 개선방안을 도출하였다. 결과를 요약하면 다음과 같다. 첫째, 건축설계 상위계획 단계에서는 조경기준의 강화, 지구단위계획에서의 지침 제공, 인센티브 제도의 도입 등을 제안하였다. 둘째, 건축설계단계에서는 설계지침 및 사례집 제작 보급, 합벽개발 허용, 연면적 2,000m2 이상 건축물 건축에서 조경기사의 직접참여 또는 협력 의무화 법조항 신설 등을 제시하였다. 셋째, 건축허가 및 준공, 사후관리단계와 관련하여 조경에 대한 허가서류 검토에 녹지직 공무원 참여 보장, 현장 검사 및 확인 업무에 조경전문가가 참여할 수 있도록 관련규정의 개정 등을 제시하였고, 사후관리에 조경전문기술자가 대행 또는 참여할 수 있도록 허용하는 관련 규정 개정 필요성 등을 제시하였으며, 시정명령 미이행 또는 위법건축물에 대한 관리감독 강화의 필요성을 제기하였다.
This study was carried out to determine adequate planting date, to compare the growth characteristics between early and late maturing cultivars, and to provide the data for the cultivation techniques of soybean [Glycine max (L.) Merr.] in double cropping system with winter crops on paddy field in Korea. Cultivars were planted on 26 May, 16 June, and 7 July with a planting density of $70cm(row\;widtb)\;{\times}\;10cm$ (planting spacing). Seed yield of soybean planted on June 16 and July 7 was approximately $37\%\;and\;53\%$, respectively, less than that of conventional planting date of May 26 in Pungsan-namulkong, and planted on June 16 and July 7 was about $30\%\;and\;37\%$, respectively, less then that of conventional planting date of May 26 in Hanamkong. The number of pods and seeds per plant decreased as planting date delayed. Seed weight increased in Pungsan-namulkong but decreased in Hannamkong as planting date delayed. The flowering date was late in delayed planting plots, but it was shorted for days from emergence to flowering and from emergence to maturity. The plant height of Hannamkong was greater than Pungsan-namulkong from the emergence to flowering stages, but in contrast, it was greater in Pungsan-namulkong than Hannamkong after flowering stage (50d after emergence) when it planted on May 26. There were no significant differences between two soybean cultivars at planting dates of June 16 and July 7. Leaf number, leaf area, and dry matter were also reduced by late planting, and Both of them were shown in high reduction at the later planting. There was a high significant difference at the flowering $(r\;=\;0.87^{**})$ and pod formation $(r\;=\;0.91^{**})$ stages between leaf dry matter and seed yield. Crop growth rate (CGR) was greater at $R2\~R3$ growth stages compared to $R3\~R4\;or\;R4\~R5$ growth stages in two soybean cultivars and the greatest CGR was obtained at planting date of May 26 in two soybean cultivars except for R4-R5 growth stage in Pungsan-namulkong. There was a highly significant positive difference between the seed yield and the leaf area index (LAI) across R3 to R4 and R2 to R3 stages. The photosynthetic rate $(P_N)$ of the uppermost leaf position had no significant difference among planting dates and between two soybean cultivars. However, $P_N$ of the $7^{th}$ leaf position increased as the planting date delayed.
Much controversy has been generated over whether the ecological restoration project in Korea is faithful to the basic approach of ecological restoration compared to projects aimed at creating parks or green spaces. This study was aimed at understanding the level of awareness of practitioners in the planting design method, which is recognized as relatively important in landscape architecture and ecological restoration. The proficiency of practitioners in planting design techniques for ecological restoration projects was investigated and analyzed in seven areas: overall planting design awareness, plant species selection method, planting tree sizes, planting density, use of native species, vegetation climatic zone, soil environment, and weed control. There was no statistically significant difference between the group who thought they were experts in the field of ecological restoration and the group who thought they were experts in the field of parks and green spaces. Moreover, there was no statistically significant difference between the degree of work performance, that is, the group whose main industry was ecological restoration, the group that performed relatively more ecological restoration work, and the group that rarely performed it. Therefore, to apply desirable ecological restoration techniques in the future and to clearly differentiate between the approach in the field of parks and green spaces, the appropriate tree size or planting density selected in the ecological restoration planting design stage must be chosen. To this end, the awareness of expert groups must be improved and related laws, systems, and guidelines must be revised.
As cool-season plant, Panax ginseng C. A. Meyer is planted under shade-installation with tall front and low rear. However, at different planting positions, distinct differences come out because ginseng grows at the same position within 3~5 years and the growth circumstance changes a lot by the shade-installation. So, in this study, changes of temperature, photosynthesis and chlorophyll fluorescence with varieties of shading material and planting position were investigated. Light transmittances by polyethylene shade net and silver-coated shading plate as planting materials were measured according to different planting positions. Photosynthetic rate and chlorophyll fluorescence were measured by LI-6400-40 (Li-Cor). According to different planting positions, light intensity was higher in silver-coated shading plate than in polyethylene shade net, and higher at front than rear. Also, photosynthetic rate showed the same tendency, which had a positive correlation to light intensity. But this treatment caused a lower Fo compared with polyethylene shade net because of the stress by light and temperature. Also, Fv/Fm and ETR were higher in silver-coated shading plate. Fo was similar at front and rear according to silver-coated shading plate and ETR was higher at front.
This experiment was conducted to investigate the changes of harvest index and the relationship between harvest index and yield determination factors by different planting times in the determinate soybean cultivars, Shinpaldal and Danbaeg. Optimum planting were 23 May in 1995 and 1996. Late planting were 13 June in 1995 and 6 June in 1996. Growth period from planting to physiological maturity (R7) was shortened as planting time was delayed in two cultivars due to shortening of reproductive growth period in Shinpaldal, and of vegetative growth period in Danbaeg. Stem weight was distinctly decreased in late planting compared to optimum planting, but seed weight of both cultivars was not different between planting times. Also, seed number per pod and harvest index were significantly increased in late planting and the high correlation was found between two factors. It was suggested that increase of harvest index in late planting would be related with high assimilate use efficiency due to increase of sink capacity. The results of correlation and principal component analysis for yield determination factors showed that main factor on yield determination was pod number per plant at R5 stage associated with dry matter accumulation during early reproductive growth period, seed number per pod and harvest index were the second factor, and one hundred seed weight was the third factor. The result of this experiment indicated that yield determination in soy-bean was dependent mainly on pod number per plant related to dry matter accumulation by early reproductive growth period, and the increase of seed number per pod and harvest index could compensate for yield decrease by shortening of vegetative growth period in late planting. Such result suggests that optimum planting date can be delayed from mid May to early June in improved soybean cultivars in Korea.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.