• Title/Summary/Keyword: plant risk management

Search Result 292, Processing Time 0.026 seconds

Assessment and Management System for Various Risks in Plant Projects (플랜트 프로젝트 리스크의 평가 및 관리시스템에 관한 연구)

  • An, Seung Kyoo;Cho, Dong-Hwan;Hur, Jin-Huek;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.6 no.1
    • /
    • pp.56-63
    • /
    • 2010
  • While the local plant market is reducing its volume, the plant market over the world since 2000s is rapidly expanding. The nation's construction companies, aggressively dedicated in launching out overseas plant market, increase the volume of orders in that sector, but there also are much difficulty in the project management as those projects ordered are gradually large scaled with more cutting-edge high-tech requirements along with comparatively higher risk. Though the local construction companies have developed their own types of measures to analyze the risk evaluation putting into practice, the specialized decision-making model for the overseas plant market or the risk measure understandable easily and applicable practically is not yet shown. This paper aims at providing the methodology to evaluate the risk by way of constructing the risk evaluation process in order to induce risk measuring elements through appropriate indexing system. Furthermore, through studying the risk management system, it aims to seek for a thorough risk management method from beginning of the project to the end.

  • PDF

On the Analysis of Risk Management for a Utility Construction Work in Plant Projects (플랜트 유틸리티 시공에서 리스크 관리에 관한 연구)

  • Han, Ki-Don;Hur, Jin-Huek;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.6 no.1
    • /
    • pp.64-70
    • /
    • 2010
  • From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.

  • PDF

A Study on Reduction of Hazard Conditions on Plant Work of Steel Industry (철강 제조업의 플랜트 공사 중 유해.위험 저감 방안)

  • Seo, Seong-Hwa;Weon, Jong-Il;Woo, Heung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.4
    • /
    • pp.61-69
    • /
    • 2011
  • The hazard conditions on plant works of the steel industry have been investigated to efficiently prevent from industrial accidents. The plant works are eventually carried out by workers of smaller service companies where the safety management systems are not well established, on behalf of the main steel company. Based on the preliminary risk assessment on the plant working and open literature reviews, the safety management systems, which can be applied to the plant workplace of each process, are studied and then the step-by-step 4M check-list method is established. Accordingly, the risk assessment technique using 4M checklist for the plant workplace is proposed. In addition, a standardized flow-chart for safety management of plant work is introduced. These risk assessment technique and flow-chart can definitely contribute to the reduction of industrial accidents, considering the risk characterization and the unsafe conditions in small and medium-sized plant workplace, as effective safety management tools and safety guide line.

Analysis of Construction-phase Risk Factors for SMEs' Advance into the Overseas Plant Construction Projects

  • Park, Moonsun;Lee, Kyosun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.328-331
    • /
    • 2017
  • The purpose of this study is to derive construction-phase risk factors in SMEs' advance into overseas plant construction projects. For this, construction-phase risk factors were investigated on the basis of the analysis of Korean construction companies, overseas plant industry-related research institutes, and overseas data. In addition, major risk factors were derived from the investigated construction-phase risk factors, and quantitative risk factors and qualitative risk factors were analyzed and derived from these major risk factors, by the use of three rounds of the Delphi analysis.

  • PDF

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

Risk Assessment and Contingency Prediction considering Work Characteristics for Modular Plant Construction Projects (모듈러 플랜트의 업무특성을 고려한 위험 평가 및 예비비 예측)

  • Kang, Hyunwook;Kim, Jongwook;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.81-89
    • /
    • 2018
  • The purpose of this study is to assess the risk and predict the contingency for modular plant construction projects. Considering the work characteristics of the modular plant, The adapted research method is that suggest models for assessment impact of risk and predict the contingency considering risk. Based on the proposed models, It is selected one modular plant construction project and assessment impact of risk factors and predicted the contingency. The results of this study are as follows: Assessment the probability of occurrence of risk factors and intensity of impact, and extract 15 important risk factors. These are classified as Engineering, Procurement, Fabrication, Transportation, Construction phases to consider the work characteristics of the modular plant. The predicted contingency is that 6.739%(Engineering 2.850%, Procurement 6.225%, Fabrication 6.211%, Transportation 4.165%, Construction 8.168%) to prepare the basic business expense. The model is used as a way to derive quantitative results in the decision-making process for risk management in construction projects.

Research on Risk-Based Piping Inspection Guideline System in the Petrochemical Industry

  • Tien, Shiaw-Wen;Hwang, Wen-Tsung;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • v.7 no.2
    • /
    • pp.97-124
    • /
    • 2006
  • The purpose of this research is to create an expert risk-based piping system inspection model. The proposed system includes a risk-based piping inspection system and a piping inspection guideline system. The research procedure consists of three parts: the risk-based inspection model, the risk-based piping inspection model, and the piping inspection guideline system model. In this research procedure, a field plant visit is conducted to collect the related domestic information (Taiwan) and foreign standards and regulations for creating a strategic risk-based piping inspection and analysis system in accordance with the piping damage characteristics in the petrochemical industry. In accordance with various piping damage models and damage positions, petrochemical plants provide the optimal piping inspection planning tool for efficient piping risk prediction for enhancing plant operation safety.

RISK FRAMEWORK FOR NEXT GENERATION NUCLEAR POWER PLANT CONSTRUCTION

  • John Walewski ;Stuart Anderson;Jaeheum Yeon;Amy Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.451-458
    • /
    • 2013
  • This research documents the initial findings and recommendations for developing a risk management tool to assess and quantify the risks associated with the construction of the next generation of nuclear power plants. The proposed tool builds upon the Construction Industry Institute's International Project Risk Assessment (IPRA) Best Practice. This paper provides an overview of the investigation to assess the unique risk elements pertaining to nuclear power plant construction and documents the preliminary findings from historical project performance data to better understand the function and use of the IPRA's Relative Impact value.

  • PDF

The establishment of R&D management system for Gas Plant R&D Center (가스플랜트 사업단에서 연구관리스템 구축)

  • Hwang, Seong Ha;Yoo, Sun Il;Nam, Tae Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.1
    • /
    • pp.19-29
    • /
    • 2008
  • Traditionally gas plant R&D has had a world-wide weak position in terms of high technology. Especially System engineering did not exactly apply to gas plant construction. So, Gas Plant R&D Center is determined to make the establishment of the system engineering for the standard of gas plant. Gas Plant R&D Center has two projects. Firstly, the establishment of the R&D management system. Secondly, the system engineering which is included in the VE concept of EPC parts. But Gas Plant R&D Center exists in the particular conditions for successful development of the new process and core equipments. Now we will describe the establishment of R&D management system and particular conditions(Risk Conditions) for gas plant.

  • PDF

A Study on the Effects of Risk Perception and Opportunism on the Project Performance (위험인식과 기회주의 행동이 프로젝트 성과에 미치는 영향에 관한 연구)

  • Yoon, Chang Soo;Jo, Dong Hyuk
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.1
    • /
    • pp.63-76
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.