• Title/Summary/Keyword: plant operation

Search Result 2,281, Processing Time 0.037 seconds

Analysis of Fuel Marginal Price for Biomass Power Plant - On the Basis of China Biomass Power Plant - (바이오매스 발전소 연료한계단가 분석 - 중국 바이오매스 발전소를 중심으로 -)

  • Kim, Cheol;Sa, Jae-Hwan;Kim, YunSoung;Jeon, Eui-Chan
    • Journal of Climate Change Research
    • /
    • v.1 no.3
    • /
    • pp.219-226
    • /
    • 2010
  • This study is analyzed the financial feasibility of biomass power plant in China in terms of fuel marginal price of biomass power plant. The range of fuel price is 150~300 RMB and IRR(Internal Rate of Return), NPV(Net Present Value), DSCR(Debt Service Coverage Ratio) and operation time are analyzed by 10 RMB from 150 RMB. The sensitivity of IRR went down by 1.35 on average. The sensibility of NPV showed big difference by 20% on 260 RMB and 270 RMB. In addition, DSCR of loan is at 1.0 at raw cost of 242 RMB and at lower than 1.0 when the raw cost over 242 RMB. It means that the pay-off of principal and interest of the loan is expected to be difficult in that case. The operation time of power plant should be 88% against standard operation time to maintain over 1.0 of DSCR. Therefore, the factors affecting the cost of raw material to build the power plant and to operate it should be prioritized.

The Research on Activation Plan for Seawater Desalination Plant Application in Korea (국내 해수담수화 플랜트 적용 활성화 방안 연구)

  • Sohn, Jinsik;Yang, Jeong-Seok;Park, Jinseo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.2
    • /
    • pp.251-255
    • /
    • 2009
  • Foreign and domestic seawater desalination plant market investigation was performed to analyze the worldwide trend of seawater desalination plant market and to establish the activation plan for seawater desalination plant application. Water demand and seawater desalination related laws and regulations were investigated and analyzed for the activation plan. RO type and large scale plants are popular nowadays however there are only small plants in island region in Korea. There will be about $1 million\;m^3/day$ deficit in 2015 according to the water demand forecasting from Ministry of Environment and Ministry of Land, Transportation, and Maritime Affairs in Korea. Therefore, it is necessary to activate the domestic application of seawater desalination plant to secure stable water resources. To activate the domestic application of seawater desalination plant, first, we need to establish regulations, support system in the water service law for seawater desalination plant. Second, related Ministry should increase the support for the operation and management of seawater desalination plant and suggest the construction of seawater desalination plant for water resources security near seaside region.

The Development of Model to Calculate Maximum Power for Tidal Power Plant Operation (조력발전 운영을 위한 최대 발전량 산정 모델개발)

  • Oh, Min-Hwan;Kim, Hual-Soo;Kim, Jae-Hoon;Song, Gyu-Seok
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.505-508
    • /
    • 2006
  • Recently, concern for tidal power is being increased by newly recycled energy. It is important to decide on the maximum power estimate operation and it's stop by applying the difference of water level between tide level and artificial reservoir for the administration of tidal development. For maximum output of power through turbine generator, administrative variables and process on efficiency of hydraulic turbine and inflow discharge of reservoir is quite complicated because it is run through the connection of discharge-gate and turbine On the development of this model, the administrative process is decided, Operation block is presented for it's maximum power estimate.

  • PDF

A Domestic Power Companies' Strategy to Enter Asian Thermal Power Plant Market (국내 발전기업의 아시아 화력발전플랜트 시장 진출전략)

  • Park, Chang-Hyun;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.58-66
    • /
    • 2011
  • The power plant companies reached the culmination for growth in the domestic market. Besides, we have faced many challenges such as an electricity opening market trend for overseas, banning the use of coal due to the United nations framework convention on climate change, and the meticulous attention regarding the government's electricity charge plan. On the other hand, the overseas business has been a critical issue since China and many other developing countries expanded their projects abroad. Another factor is that power plant industry is being privatized, and it made the market regulation a bit loose. Thus, the market environment became favorable toward those companies which planned many overseas businesses. In this research, the power plant company's current condition for construction and operation as well as its technical competitiveness were analyzed, and an alternative plan using SWOT analysis for entering an oversea market was made. It dealt with both internal and external factors. Also, examined was the current situation under the power plant industry dealing with restructure for electric industry, lack of fossil fuel, and the United nations framework convention on climate change. From the research, it was suggested that many successful strategies to enter the overseas business by using the market trend I researched.

  • PDF

Comparison of properties at Fossil Power Plant by On-Line Real Time Performance Monitoring System (On-Line 실시간 성능감시 시스템을 이용한 화력발전소 운전 Parameter 값 비교분석)

  • Jung, Hoon;Park, Doo-Yong
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.3501-3505
    • /
    • 2007
  • As the power plant industry has been changed into competition structure, power generation companies do more with less by increasing capacity and lowering operation costs. In order to achieve this goals, an on-line real-time performance monitoring system has been needed to introduced to fossil power plant. The system represents a suite of related software modules which consist of on-line data, and on-line performance modules. This system can help the plant staff get the most out of their facilities by continuously monitoring deviations in equipment performance and the impact on those deviations on plant power, heat rate and operating cost. This paper shows the comparison of design value with acceptance test and current(measured) value.

  • PDF

A Study on Power Plant Modeling for Control System Design

  • Kim, Tae-Shin;Kwon, Oh-Kyu
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1449-1454
    • /
    • 2003
  • For many industrial processes there are good static models used for process design and steady state operation. By using system identification techniques, it is possible to obtain black-box models with reasonable complexity that describe the system well in specific operating conditions [1]. But black-box models using inductive modeling(IM) is not suitable for model based control because they are only valid for specific operating conditions. Thus we need to use deductive modeling(DM) for a wide operating range. Furthermore, deductive modeling is several merits: First, the model is possible to be modularized. Second, we can increase and decrease the model complexity. Finally, we are able to use model for plant design. Power plant must be able to operate well at dramatic load change and consider safety and efficiency. This paper proposes a simplified nonlinear model of an industrial boiler, one of component parts of a power plant, by DM method and applies optimal control to the model.

  • PDF

Dynamic Model for Ocean Thermal Energy Conversion Plant with Working Fluid of Binary Mixtures

  • Nakamura, Masatoshi;Zhang, Yong;Bai, Ou;Ikegami, Yasuyuki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.2304-2308
    • /
    • 2003
  • Ocean thermal energy conversion (OTEC) is an effective method of power generation, which has a small impact on the environment and can be utilized semi-permanently. This paper describes a dynamic model for a pilot OTEC plant built by the Institute of Ocean Energy, Saga University, Japan. This plant is based on Uehara cycle, in which binary mixtures of ammonia and water is used as the working fluid. Some simulation results attained by this model and the analysis of the results are presented. The developed computer simulation can be used to actual practice effectively, such as stable control in a steady operation, optimal determination of the plant specifications for a higher thermal efficiency and evaluation of the economic prospects and off-line training for the operators of OTEC plant.

  • PDF

Construction of an International Standard-Based Plant Data Repository Utilizing Web Services Technology (웹 서비스 기술을 활용한 국제 표준 기반의 플랜트 데이터 저장소의 구현)

  • Mun, Du-Hwan;Kim, Byung-Chul
    • IE interfaces
    • /
    • v.23 no.3
    • /
    • pp.213-220
    • /
    • 2010
  • As the market becomes increasingly globalized and competition among companies increases in severity, various specialized organizations are participating across the process plant lifecycle, including the stages of design, construction, operation and maintenance, and dismantlement, in order to ensure efficiency and elevate competitiveness. In this regard, it is an important technical issue to develop services or information systems for sharing process plant data among participating organizations. ISO 15926 is an international standard for integration of lifecycle data for process plants including oil and gas facilities. ISO 15926 Part 7, a part of the ISO 15926 standard, specifies an implementation method called a facade that uses Web Services and ontology technologies for constructing plant data repositories and related services, with the aim of sharing lifecycle data of process plants. This paper discusses the ISO 15926-based prototype facade implemented for storing equipment data of nuclear power plants and servicing the data to interested organizations.

Analysis of Several Digital Network Technologies for Hard Real-time Communications in Nuclear Plant

  • Song, Ki-Sang;No, Hee-Cheon;Kim, Dong-Hun;Koo, In-Soo
    • Nuclear Engineering and Technology
    • /
    • v.31 no.2
    • /
    • pp.226-235
    • /
    • 1999
  • Applying digital network technology for advanced nuclear plant requires deterministic communication for tight safety requirements, timely and reliable data delivery for operation-critical and mission-critical characteristics of nuclear plant. Communication protocols, such as IEEE 802/4 Token Bus, IEEE 802/5 Token Ring, FDDI, and ARCnet, which have deterministic communication capability are partially applied to several nuclear power plants. Although digital communication technologies have many advantages, it is necessary to consider the noise immunity from electromagnetic interference (EMI), electrical interference, impulse noise, and heat noise before selecting specific digital network technology for nuclear plant. In this paper, we consider the token frame loss and data frame loss rate due to the link error event, frame size, and link data rate in different protocols, and evaluate the possibility of failure to meet the hard real-time requirement in nuclear plant.

  • PDF

A Study on Feasibility Evaluation for Prognosis Systems based on an Empirical Model in Nuclear Power Plants

  • Lee, Soo Ill
    • International Journal of Safety
    • /
    • v.11 no.1
    • /
    • pp.26-32
    • /
    • 2012
  • This paper introduces a feasibility evaluation method for prognosis systems based on an empirical model in nuclear power plants. By exploiting the dynamical signature characterized by abnormal phenomena, the prognosis technique can be applied to detect the plant abnormal states prior to an unexpected plant trip. Early $operator^{\circ}{\emptyset}s$ awareness can extend available time for operation action; therefore, unexpected plant trip and time-consuming maintenance can be reduced. For the practical application in nuclear power plant, it is important not only to enhance the advantages of prognosis systems, but also to quantify the negative impact in prognosis, e.g., uncertainty. In order to apply these prognosis systems to real nuclear power plants, it is necessary to conduct a feasibility evaluation; the evaluation consists of 4 steps (: the development of an evaluation method, the development of selection criteria for the abnormal state, acquisition and signal processing, and an evaluation experiment). In this paper, we introduce the feasibility evaluation method and propose further study points for applying prognosis systems from KHNP's experiences in testing some prognosis technologies available in the market.