Recently, global market competition of iron and steel products is ever increasing due to over-supply from increased number of industries in rapidly growing countries, such as China, Brazil, and Indonesia. To occupy the big market, major industries are trying to develop high quality, high performance steel products via developing a new iron and steel making process. In other words, development of a new and innovative steel plant is a key to cope with the tough situation. Design and development for the life cycle of iron and steel making plant is very much complex and multi-disciplinary. In this paper, Plant Systems Engineering (PSE), a tailored SE process for industrial plant based on ISO/IEC 15288 is used for the design of Continuous Casting Process (CCP) Plant system. The CCP is a crucial process in steel making plant, whose design technology is occupied by the advanced foreign companies. For the sake of increasing engineering capability for the design of CCP, we applied PSE Process for the renovation of the existing CCP Process. Through the study, we were convinced that the applied method can be used for other plant systems, and SE is really the way of thinking, design, and development of modern complex and multi-disciplinary systems where high risk factors are present throughout the whole life cycle.
대한전자공학회 2001년도 The 6th International Symposium of East Asian Resources Recycling Technology
/
pp.387-392
/
2001
Kobe Steel, LTD. and Midrex Technologies Inc. jointly developed the FASTMET$\circledR$ process as a steel mill waste recycle technology in which the DRI product meets BF feed material or BOF/EAF feed material requirements. FASTMET(R) process turns value-less wastes into valuable DRI and sellable zinc oxide, and gives the solution for the steel mill wastes recycling from both economical and environmental viewpoints. During the development of the process, Laboratory, Pilot Plant and Demonstration Plant tests were carried out from 1990 to 1998. The first FASTMET(R) commercial plant began operation in April, 2000 and the second commercial plant started in April, 2001 Both commercial plants have proceeded successfully preying that FASTMET$\circledR$ is a suitable process for recycling steel mill waste and for producing DRI as an iron source.
In this paper, the present condition for localization of process pumps and the enhancement method of the localization ratio of process pumps for refinery and chemical plant market were studied. The market of plant industry in the world has grown rapidly since 2000. However, the profit of domestic plant EPC compaies cound not have been increased as much as the market scale because they procured most of equipment from overseas. To make remarkable profit of plant EPC companies in the petrochemical industry, localization of equipments is required. Suitable equipment for localization is process pump applied API 610 standard. An purchased amount of pumps from overseas by domestic plant EPC companies in the last two years were 230 billion won. If process pumps are localized then an profit of plant EPC project will increase.
Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.375-380
/
2009
Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.
In steel making plant, sampling system for raw material such as iron ore, limestone is necessary for quality control purpose. For the sake of efficiency and productivity, automation of the sampling system is highly desirable. From technical standpoint, the development of the automated system requires multi-disciplinary domain knowledge such as mechanical engineering, industrial engineering, information technology and computer engineering. Up to present time, the development has been mainly carried out by a single domain expert with project manager. The automated system developed in this way caused problems in the final system. This paper suggests a systems engineering approach to the development of automation for raw material sampling plant via a tailored process called Plant Systems Engineering (PSE) Process based on ISO/IEC 15288. Through the PSE process, we could derive right requirements and architecture of the Systems Of Interest (SOI), and we were convinced that the PSE Process can be applied to many other Plant Systems.
International journal of advanced smart convergence
/
제7권1호
/
pp.42-47
/
2018
Recently, as the demand for limited resources continues to rise and problems of resource depletion rise worldwide, the importance of renewable energy is gradually increasing. In order to solve these problems, various methods such as energy conservation and alternative energy development have been suggested, and biogas, which can utilize the gas produced from biomass as fuel, is also receiving attention as the next generation of innovative renewable energy. New and renewable energy using biogas is an energy production method that is expected to be possible in large scale because it can supply energy with high efficiency in compliance with energy supply method of recycling conventional resources. In order to more efficiently produce and manage these biogas, a biogas plant has emerged. In recent years, a large number of biogas plants have been installed and operated in various locations. Organic wastes corresponding to biogas production resources in a biogas plant exist in a wide variety of types, and each of the incoming raw materials is processed in different processes. Because such a process is required, the case where the biogas plant process is inefficiently operated is continuously occurring, and the economic cost consumed for the operation of the biogas production relative to the generated biogas production is further increased. In order to solve such problems, various attempts such as process analysis and feedback based on the feedstock have been continued but it is a passive method and very limited to operate a medium/large scale biogas plant. In this paper, we propose "CNN-based production yield prediction algorithm for increasing process efficiency of biogas plant" for efficient operation of biogas plant process. Based on CNN-based production yield forecasting, which is one of the deep-leaning technologies, it enables mechanical analysis of the process operation process and provides a solution for optimal process operation due to process-related accumulated data analyzed by the automated process.
ISO 15926 is an international standard for the representation of process plant lifecycle data. However, it is not easy to implement the part 2-data model and the part 4-initial reference data because of their complexity in terms of data structure and shortages of related development toolkits. To overcome this problem, ISO 15926-7(part 7) is under development. ISO 15926-7 specifies implementation methods for sharing and exchange of process plant lifecycle data, which is based on semantic web technologies such as OWL, Web Services, and SPARQL. For the application of ISO 15926-7, this paper discusses how to represent technical specifications of process plant equipment by defining user-defined reference data and object information model with an example of reactor coolant pumps located in the reactor coolant system of an APR 1400 nuclear power plant.
This study was conducted to evaluate the effects of physical characteristics. Twelve specific odorous compounds and various sources of bacteria were tested via treatment of food waste using an ultra-thermophilic aerobic composting process. Food waste was mixed with seed material and operated for 47 days. During composting, the temperature was maintained at $80-90^{\circ}C$. The variations in $O_2$, $CO_2$ and $NH_3$ production suggested typical microorganism-driven organic decomposition patterns. After composting, the concentrations of 12 specific odorous compounds other than ammonia did not exceed the allowable exhaust limits for odor. After composting, thermophiles represented 50% of all bacteria. After composting, the percentage of thermophile bacterial increased by 15%. Therefore, both stable composting operation and economic benefit can be expected when an ultra-thermophilic composting process is applied to food waste.
In this study, we divided the process operation scenarios into three categories based on raw water temperature and turbidity. We will select and operate the process operation scenario according to the characteristics of the raw water. The number of algae in the DAF treated water has been analyzed to be less than 100 cells/mL. These results indicated that the DAF process is effective in removing the algae. In addition, the scenario of the integrated management decision algorithm of the DAF process was developed. DAF pilot plants ($500m^3/day$) process has shown a constantly sound performance for the treatment of raw water, yielding a significantly low level of turbidity (DAF treated water, 0.21~1.56 NTU).
With rapid growth of the world plant market, an increasing attention is paid on the plant engineering. Up to present time, Korean plant engineering technology has been concerned with the down stream part of the plant engineering, so called EPC, considered as a lower value chain compared with the up stream, composed of FEED(Front End Engineering Design) and PMC(Project Management Consultancy). In other words, a key issue for Korean plant industry is how to catch up the FEED technology, currently occupied by the advanced countries. In this paper, we propose an SE(Systems Engineering) approach, conventionally applied for aerospace and defense industry, to the FEED for plant engineering. Specifically, we proposed a new SE process composed of: 1) SPA matrix for reverse systems engineering, and 2) PPA matrix for forward systems engineering. To illustrate the proposed method, a case study for an environmental plant is performed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.