Park, Hang-Soon;Kim, Woo-Jung;Chong, Young-Whan;Won, Seo-Kyung
Proceedings of the Korean Institute of Building Construction Conference
/
2013.05a
/
pp.268-270
/
2013
The construction project can be defined as a network combined between elements which are engineering, procurement, construction, start-up, and has a plenty of subjects and partners. For the successful project management in construction industry, it is necessary to adopt various management methods, such as lean production, information network system, SCM(Supply Chain Management), which can increase the efficiency of project management. During recent years, even though various management techniques have been applied, the SCM system has not formulated in construction industry. Especially, the Nuclear Power Plant Construction which requires high regulations of the safety and security has not applied SCM. Therefore, this study aimed to propose technology area of SCM in Korean Nuclear Power Plant Construction.
International conference on construction engineering and project management
/
2017.10a
/
pp.328-331
/
2017
The purpose of this study is to derive construction-phase risk factors in SMEs' advance into overseas plant construction projects. For this, construction-phase risk factors were investigated on the basis of the analysis of Korean construction companies, overseas plant industry-related research institutes, and overseas data. In addition, major risk factors were derived from the investigated construction-phase risk factors, and quantitative risk factors and qualitative risk factors were analyzed and derived from these major risk factors, by the use of three rounds of the Delphi analysis.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.229-230
/
2016
The Nuclear Power Plant construction industry has the related to Information-integration field. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each life-cycle phase. Particularly this paper related to the construction information of component.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.725-728
/
2008
According to this plant construction trends, the future plant construction will be very complex, specialization and oversize, so it is expected that future plant construction will create high-profits and require the connection between high-technology and construction method. To catch this advance, more detail business management plan and knowledge sharing technology are needed as basic element. Consequently, this study will analyze the status of current plant industry and develop the educational curriculum for plant business participants, and based on study outcome, this study will propose that web-based portal system by Knowledge Management System(KMS) prototype to fit each company's characteristics.
Keun-Hyung Park;Moon-Sun Park ;Moon-Hwan Hwang;Yong-Su Kim
International conference on construction engineering and project management
/
2009.05a
/
pp.1576-1581
/
2009
The purpose of this study is to provide the problems of insurance system of maritime facilities(Gas Plant) in korea. In order to find out the problems of insurance system of construction work, the literature research and case study on the maritime facility construction are adopted as research method. And this study analyzed the construction cases of maritime facilities(Gas Plant) to which the national contract law was applied for the first time. The findings of this study are as follows: In the case analysis of 00 facility construction, the contractor pay additional insurance fees for the construction. And the regulations on insurance registration are not stated clearly relating to the enforcement ordinance of the national contract law.
Recently, plant construction industries are enjoying a favorable business climate centering around developing countries and oil producing countries rich in oil money. This paper proposes a methodology of implementing case-based reasoning(CBR) system for managing knowledge like lessons learned and various documents accumulated in performing power plant construction projects which are receiving a lot of order from foreign countries such as the Middle East, etc. Our methodology is consisted of 10 steps : user requirement gathering, information modeling, case modeling, case base design, similarity function design, user interface design, case base building, CBR module development, user interface implementation, integration test. Also, to illustrate the effectiveness of proposed methodology, the real CBR system is implemented for the plant business division of 'H' company which has international competitiveness in the field of plant construction industry. At present, the implemented CBR system is successfully utilizing as storing, sharing, and reusing knowledge which is accumulated in performing power plant construction projects in the target enterprise.
The purpose of this study is to provide basic data to help ensure the safety and enhance industrial competitiveness of plant construction projects by analyzing the safety management status of, mainly, chemical engineering plant construction projects, and proposing specific measures and models to reduce human/educational, technical/systemic, institutional disasters. This study was done using literature research and case study/empirical study methods. The results of this study are summarized as follows. First, we classified the major disasters from the quarterly released 'major diaster cases in construction business' from Korea Occupational Safety and Health Agency according to the type of construction and presented the causes and prevention measures.
Proceedings of the Korean Institute of Building Construction Conference
/
2012.11a
/
pp.229-231
/
2012
The supply chain in plant construction project can be defined as a network combined between elements which is engineering, procurement, construction, start-up. For successfully leading construction project, close relation and mutual cooperation should be preceded and Supply Chain Management(SCM) system is needed to improve the relation. In particular, because safety is a top priority for the companies work in the construction of Nuclear Power Plant(NPP), it is necessary to control all parties realated with NPP construction systematically. In this situation, it is important to purchase high-quality equipment in timely manner by developing Integrated cooperative systems. Therefore, this study aimed to propose developing solutions of SCM such as JIT and Envelop Design system, which can reduces difficulties of decision making between the parties involved in the project and will increase the efficiency of the engineering process in NPP.
International conference on construction engineering and project management
/
2015.10a
/
pp.700-701
/
2015
Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.
The goal of this study was to investigate some significant factors to influence level of safety at plant construction field and analyze degree of risk by work classification. Currently, there are lots of construction fields for the nuclear power plant for electricity generation, and our government also planned constructing more nuclear power plant in near future. However, much of the safety literature neglected the degree of risk factors on the plant construction field. Safety managers participated in the brainstorming session for drawing decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for drawing most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including number of workers, working environments, skill of craft and accident experience. Third, the results of AHP showed Architecture work is the most dangerous work among 6 work types. The results could be used to reduce degree of risk in construction field of the nuclear power plant.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.