BENCHMARKING THE PREPROJECT PLANNING PRACTICE FOR THE BUILDING CONSTRUCTION INDUSTRY IN TAIWAN

  • Yu-Ren Wang;Yi-Jao Chen;Chun-Yin Yu;Shin-Si Jang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.324-329
    • /
    • 2011
  • Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.

  • PDF

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Conflict Management in Planning phase of Remodeling Project through Multi-Agent based on Fuzzy Inference. (퍼지추론 기반 멀티 에이전트를 통한 리모델링 사업 전 추진단계에서의 갈등관리)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.202-203
    • /
    • 2015
  • To promote the remodeling project it is important to get apartment residents' consent. It is significant variable to determine project to progress smoothly from planning stage which committee of association establishment sets up to establishment stage of association. On average, it takes about 1~1.6 year in planning phase which means before construction phase of remodeling. Therefore, it is very important issue to get apartment residents' consent in planning phase. In this research, we focused on residents' opinion and proposed solution of conflict with gathering residents' opinion to proceed remodeling project. By setting particular remodeling situation, related residents represented as agents made effort to efficient coordination to reduce total duration of decision making. Therefore, we proposed multi-agent based on fuzzy inference to simulate behavior of decision making on remodeling project effectively. From this method, optimal alternative is selected by considering each agents' attributes which represented by fuzzy set. This research will develope to further research for realizing concrete multi-agent based on fuzzy inference considering all stakeholders in remodeling project.

  • PDF

Cooperative Design Method for Building Projects (건축 프로젝트의 협력설계 방안)

  • Kim, Eun-Youn;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.67-76
    • /
    • 2011
  • Two main features of the recent building project are the enlargement of the size and the technological complexity. Due to these features, the number or the size of organizations participating in building project is also increasing and the relationships between the organizations are becoming more interdependent than ever. Owing to these features, some delays or errors in the decision-making process in the phase of planning of a building project may influence many subjects related to the project. The most important factor for a successful project is to arbitrate confrontations and build cooperative relationships between parties who have different interests with one another in the project. Efforts were made to find out general features of building project and the features in the phase of planning in order to set a direction of this research. To solve problems in the phase of planning, the concept of 'cooperative design', which means that different features and interests of various organizations should be reflected from the phase of planning, was introduced. By introducing cooperative design in building projects, more rapid and objective decision-makings are possible.

  • PDF

Development of Remodeling Prototype Plans in 1st-Phase New Town Aged Apartment - Based on '2 Bay Type' of 1st-Phase New Town Representatives - (1기 신도시 노후 공동주택 리모델링 평면 프로토타입 개발에 관한 연구 - 2 Bay 형식의 1기 신도시 대표유형을 중심으로 -)

  • Choi, Jaepil;Choi, Junho;Kim, Youngsun;Moon, Sunghoon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.6
    • /
    • pp.67-76
    • /
    • 2018
  • A prototype of remodeling floor plans are proposed in this study. They are researched base on the majority floor plan type which forms 19% out of representatives 1st-Phase New Town Aged Apartment compositions. In order to examine possible scenarios of the prototypes, prototype planning model is derived from the president studies on aged apartment remodeling. The prototype plans reflect residents' preference survey and lead 6 different kinds of prototype plans regarding 3 different remodeling scenarios. Prototypes consider characteristics of multi-complex buildings and households which applicably various remodeling planning options; story-Increase remodeling, residents custom remodeling etc. The study has significance to be basic planning materials for remodeling of association and local government.

Possible effect of North Pacific Oscillation on Summer Tropical Cyclone Activity over the Western North Pacific (북서태평양에서 여름철 태풍활동에 대한 북태평양 진동의 영향)

  • Choi, Ki-Seon;Lee, Kyungmi;Kim, Jeoung-Yun;Park, Cheol-Hong
    • Journal of Environmental Science International
    • /
    • v.24 no.3
    • /
    • pp.339-352
    • /
    • 2015
  • This study analyzed the change in tropical cyclone (TC) activity according to the fluctuation in July-to-September average North Pacific Oscillation index (NPOI) and its underlying large-scale environment during the last 37 years from 1977 to 2013. For this purpose, seven years with highest index NPOI value (positive NPOI phase) and another seven years with lowest NPOI index value (negative NPOI phase) among the 37 years were selected as sample after excluding the ENSO years. During the positive NPOI phase, TCs were created in the east of tropical and subtropical western North Pacific and moved to the west from the Philippines toward the southern region in China or toward far eastern sea of Japan. Meanwhile, during the negative NPOI phase, TCs tended to proceed to the north toward Korea or Japan passing East China Sea from the eastern sea of the Philippines. As a result, also in the TC recurvature, TCs in positive NPOI phase showed a tendency of recurving toward more eastern direction compared to TCs in negative NPOI phase. Hence, TC intensity was stronger in negative NPOI phase which allowed more time for obtaining energy from the ocean.

A Multi-objective Production Planning Model in a Flexible Manufacturing System Using Multiple Criteria Analysis (다기준(多基準) 분석(分析)을 이용(利用)한 유연생산(柔軟生産)시스템에서의 다목적(多目的) 생산계획(生産計劃) 모형(模型)에 관한 연구(硏究))

  • Lee, Yeong-Gwang
    • Journal of Korean Society for Quality Management
    • /
    • v.20 no.1
    • /
    • pp.126-135
    • /
    • 1992
  • The decision making process for production planning in FMS usually involves multiple conflicting objectives and criteria. This study consists of prescreening and analytical phase. In the prescreening phase, criteria are used to reduce the set of alternative system configuration down to a small number of candidates. After this phase, a multiobjected programming model is formulated for each remainning configuration.

  • PDF

Trajectory Optimization for Autonomous Berthing of a Twin-Propeller Twin-Rudder Ship

  • Changyu Lee;Jinwhan Kim
    • Journal of Ocean Engineering and Technology
    • /
    • v.37 no.3
    • /
    • pp.122-128
    • /
    • 2023
  • Autonomous berthing is a crucial technology for autonomous ships, requiring optimal trajectory planning to prevent collisions and minimize time and control efforts. This paper presents a two-phase, two-point boundary value problem (TPBVP) strategy for creating an optimal berthing trajectory for a twin-propeller, twin-rudder ship with autonomous berthing capabilities. The process is divided into two phases: the approach and the terminal. Tunnel thruster use is limited during the approach but fully employed during the terminal phase. This strategy permits concurrent optimization of the total trajectory duration, individual phase trajectories, and phase transition time. The efficacy of the proposed method is validated through two simulations. The first explores a scenario with phase transition, and the second generates a trajectory relying solely on the approach phase. The results affirm our algorithm's effectiveness in deciding transition necessity, identifying optimal transition timing, and optimizing the trajectory accordingly. The proposed two-phase TPBVP approach holds significant implications for advancements in autonomous ship navigation, enhancing safety and efficiency in berthing operations.

Community Health Program Planning and Local Public Health System : The MAPP Model (지역사회보건기획과 지역보건체계 강화: MAPP 모형의 사례)

  • Kwak, Min-Son;Yoo, Seung-Hyun
    • Korean Journal of Health Education and Promotion
    • /
    • v.27 no.3
    • /
    • pp.59-66
    • /
    • 2010
  • Objectives: This paper aims to describe a public health planning model, Mobilizing for Action through Planning and Partnership(MAPP), and to discuss its application in Korea with a specific focus on the Local Public Health System (LPHS) component of MAPP. Methods: Literature content review was performed on research papers on MAPP development and application, MAPP handbook and guides, the guidelines for the 5th Phase Community Health Plan, and a research report on public health center evaluation system. Results: MAPP has been applied to public health planning (the 5th Phase Community Health Plan) and a performance evaluation system for public health center in Korea. The current application is limited to the early stages of the MAPP. Limited or partial application affects the integrity of the model. Follow-through should be strengthened especially for evaluation planning. Conclusion: Systems thinking approaches should be considered for the development of LPHS and strengthening logical and practical linkage between planning and evaluation of community health planning.

Trajectory Planning and Fuzzy Controller Design of a Re-entry vehicle on Approach and Landing phase (재진입 비행체의 진입 및 착륙단계 경로 생성 및 퍼지제어기 설계)

  • Min, Chan-Oh;Jo, Sung-Jin;Lee, Dae-Woo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.38 no.2
    • /
    • pp.150-159
    • /
    • 2010
  • The approach and landing phase of a re-entry vehicle is composed of Steep Glideslope phase, Circular Flare phase, Flare Maneuver phase. The trajectory planning algorithm with geometric parameters is studied in this paper for on-board trajectory planning. This algorithm generate reference trajectory rapidly considering safe landing of re-entry vehicle. In this paper, the Mamdani Fuzzy PD type controller for longitudinal and lateral control is designed which has robustness of nonlinear system. In addition, the simulation is performed including initial downrange and crossrange errors, and the results shows that the proposed fuzzy logic controller has good performance.