• 제목/요약/키워드: plan-based model

검색결과 1,642건 처리시간 0.027초

Cohort-based evacuation time estimation using TSIS-CORSIM

  • Park, Sunghyun;Sohn, Seokwoo;Jae, Moosung
    • Nuclear Engineering and Technology
    • /
    • 제53권6호
    • /
    • pp.1979-1990
    • /
    • 2021
  • Evacuation Time Estimate (ETE) can provide decision-makers with a likelihood to implement evacuation of a population with radiation exposure risk by a nuclear power plant. Thus, the ETE is essential for developing an emergency response preparedness. However, studies on ETE have not been conducted adequately in Korea to date. In this study, different cohorts were selected based on assumptions. Existing local data were collected to construct a multi-model network by TSIS-CORSIM code. Furthermore, several links were aggregated to make simple calculations, and post-processing was conducted for dealing with the stochastic property of TSIS-CORSIM. The average speed of each cohort was calculated by the link aggregation and post-processing, and the evacuation time was estimated. As a result, the average cohort-based evacuation time was estimated as 2.4-6.8 h, and the average clearance time from ten simulations in 26 km was calculated as 27.3 h. Through this study, uncertainty factors to ETE results, such as classifying cohorts, degree of model complexity, traffic volume outside of the network, were identified. Various studies related to these factors will be needed to improve ETE's methodology and obtain the reliability of ETE results.

BIM 라이브러리를 활용한 철도 인프라의 모델링 자동화 기술 개발 (Development of Automation Technology for Modeling of Railway Infrastructure using BIM Library)

  • 김윤옥;문소영;윤희택;박영곤;김지영
    • 한국BIM학회 논문집
    • /
    • 제12권3호
    • /
    • pp.18-29
    • /
    • 2022
  • Recently, research on the application of BIM has continuously been active not only in architecture but also in civil engineering in order to improve work efficiency across the project's planning, design, construction and maintenance phases. However, the empirical applications of BIM targeting to civil engineering scope of construction sites still lags compared to architectural sized projects. This is because BIM tools are mainly based upon vertical structures of architecture, thereby most of them have difficulties and limitations to get utilized on horizontal structures of civil engineering. Therefore, this study intends to propose automation technology of design using BIM library and to indicate its field availability through case application on a railway project representing linear infrastructure. In addition, it put forward the utilization plan of the automation technology upto 4D and 5D by continue making use of the BIM model created in the project's design stage up through the maintenance stage. The novel method of the technology proposed in this paper incorporates the automatic creation of the BIM library based on two-dimensional tunnel cross-sections and sweeping of it over three-dimensional alignment to create a BIM model of linear infrastructure. The proposed technology is anticipated to improve the efficiecny of modeling process of railway projects based on linear structures.

일반항공 비행교관 역량별 행동지표 및 비행교관 교육요구 분석 (Identifying Behavior Indicators for Flight Instructor Competencies and Training Needs Analysis for General Aviation Flight Instructor)

  • 강금석;박형준;김경태
    • 한국항공운항학회지
    • /
    • 제31권1호
    • /
    • pp.68-78
    • /
    • 2023
  • This study aims to provide information necessary for developing a "Competency-Based Training and Evaluation Plan" for general aviation flight instructors in Korea. General aviation training experts designed a survey by selecting "Behavior Indicators" from the ICAO Flight Instructor Competency Model. This study analyses the importance of Behavioral Indicators, the level of instructor performance, and the training needs for flight instructors. According to the factor analysis, ICAO "Flight Instructor Competency Model" is found as a valid tool to measure general aviation flight instructor competencies. According to the training needs analysis, flight instructors training program needs to be improved on "Training Environment Management", "Teaching Method", and "Interaction" competencies. When compared with trainee group, flight instructors & examiners have a higher training demand for "Teaching & Learning Environment Management". This study suggests the flight instructor training program requires to be reorganized based on the competencies related to the flight instructor duties in the training environments.

A Study on Correlation between the CMMI SPs and GPs at Maturity Levels 2 and 3

  • Lee, Min Jae;Rhew, Sung-Yul
    • 시스템엔지니어링학술지
    • /
    • 제7권1호
    • /
    • pp.9-21
    • /
    • 2011
  • Assuming that the Capability Maturity Model Integration for Development v1.2 (CMMI) could be applied to an organization more effectively if the content similarities among practices were improved in terms of structure and composition, this paper presents the analysis of the correlations between the CMMI Specific Practices (SP) and Generic Practices (GP) for the Maturity Level 2 and 3 Process Areas using the Chi-square independence test. According to the analysis, a 22.2% correlation was observed. To minimize the problem of repeatedly applying similarities, 6 GPs that are highly correlated with the SPs were grouped together. Then, three different improvement plans: 1) development of a standard template-based project plan, 2) establishment of a configuration management system based on open source software to control work products and leverage experience, and 3) establishment of project assurance through an independent quality assurance-based organization and intensive review by higher-level management - were defined.

MAS 기반 피난시뮬레이션을 이용한 분산대피 비교 연구 (A comparative Study for dispersion model in evacuation plan by using MAS-based evacuation simulation)

  • 장재순;이동호
    • 한국안전학회지
    • /
    • 제29권1호
    • /
    • pp.59-63
    • /
    • 2014
  • Smoke is one of the most critical factor when escaping from the fire since it reduces visibility and interrupts finding emergency exit lights. Therefore, it is recommended that an evacuation simulation program should incorporate the smoke factor. In addition, it is suggested that the program should include not only the unilateral damage by the smoke but also the detour evacuation by risk communication. In this study, MAS (Multi Agent System)-based simulation program which incorporates the reduced walking speed by smoke and adopts the dispersion evacuation logic during escaping from the fire. To make comparison, a commercial evacuation program, Pathfinder was used. It was found that the simulation results of MAS (Multi Agent System)-based program is better than Pathfinder in terms of safe evacuation. It means that evacuation simulation need a additional evaluation categories that include not only quick evacuation time but also safe evacuee number.

감성 소재 기반의 스포츠 휠체어 소재 적용에 관한 연구 (A study on the application of sports wheelchair materials based on emotional materials)

  • 송성일
    • 한국결정성장학회지
    • /
    • 제31권1호
    • /
    • pp.43-54
    • /
    • 2021
  • 본 연구는 제품 개발의 소재 적용에 있어 트렌드 리서치를 기반으로 하는 감성 소재의 요소를 도출하는 프로세스를 제안하였다. 케이스 모델인 한국형 스포츠 휠체어 개발에 적용하고자 하였으며, CMF(Color, Material, Finish) 기반의 리서치 중 소재 부분에 초점을 맞추어 연구하였다. 메가트렌드, 경쟁사 제품 및 파트별 분석, 심리 색채 분석 등 리서치 방법론을 통해 소재 적용의 최적화 및 검증, DB화를 연구하였으며 FGI 검증을 통한 최종 적용안을 도출하였다.

A CP-BASED OPTIMIZATION MODEL FOR CONSTRUCTION RESCHEDULING PROBLEMS

  • Shu-Shun Liu;Kuo-Chuan Shih
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.941-946
    • /
    • 2005
  • It is essential for project managers to make schedule adjustment based on their professional experience, in terms of rescheduling action discussed in this paper. This paper discusses the topics of resource-constrained construction rescheduling by modifying the concepts of manufacturing rescheduling. Moreover, the influence factors of construction rescheduling problems are investigated and identified in this paper. According to initial schedule plan and present progress, a new rescheduling mechanism based on Constraint Programming (CP) techniques is developed to reschedule projects with the objective of minimizing total project cost or duration, under three rescheduling policies. Through case study, the behavior of three different rescheduling policies is analyzed and discussed in this paper.

  • PDF

격자기반 강우-유출-유사 모형의 유사량 산정에 관한 적용성 평가 (Applicability Evaluation to Grid-based Rainfall-Runoff-Sediment Model for Sediment Discharge Estimation)

  • 최현구;박준형;한건연
    • 한국습지학회지
    • /
    • 제19권1호
    • /
    • pp.132-143
    • /
    • 2017
  • 유사의 침식 이송 퇴적으로 인해 발생할 수 있는 문제를 최소화하기 위해 하천에서의 정기적인 유사량 자료의 획득이 필수이다. 하지만 현재 국내에서의 유사량 측정 계획으로는 유사량 추정에 어려움이 있어 이를 대체하기 위해 경험식이나 수치모형을 활용하고 있다. 따라서 본 논문에서는 유역에서의 유사량 산정과 자료의 연속성 확보를 위해 국내에서 개발된 격자기반 강우-유출-유사 모형인 K-DRUM 모형을 적용하였다. 17개의 중권역에 대한 유량과 유사량을 산정하고 실측자료와 비교를 통해 모형의 적용성을 검토하였다. 정량적인 평가를 위해 NSE, PBIAS, RSR 등을 기준항목으로 사용하였으며, 유량에 대한 모의결과는 강우의 경향을 잘 반영하며 높은 통계값을 나타내었다. 유사량의 경우 유역의 토양침식과정을 물리적으로 잘 반영하였으며, 실측자료를 이용하여 보정을 수행하였을 때 그 유역에서 연속적인 유사량 자료를 산정하는데 적용성이 우수한 것으로 나타났다.

SWRO 플랜트의 RAM 분석을 위한 시뮬레이션 모델 연구 (A Study on Simulation Model for RAM Analysis of SWRO Plant)

  • 김용수;박정원;최석호;강준규
    • 한국시뮬레이션학회논문지
    • /
    • 제28권4호
    • /
    • pp.1-10
    • /
    • 2019
  • 해수담수화(SWRO, Sea Water Reverse Osmosis) 플랜트는 장기적이고 지속적인 담수 생산을 위하여 설계단계부터 플랜트의 가용도를 고려하여야 하며, 시간의 흐름에 따라 다양한 형태의 노후 현상이 진행되어 시스템 성능의 저하가 발생하므로 가용도 유지를 위한 고장정비 및 예방정비 계획 수립 등이 필요하다. 해수담수화 플랜트와 같이 복잡한 공학구조로 구성된 플랜트 분야에서는 시스템의 신뢰도 혹은 가용도를 수리적인 방법으로 추정하는데 어려움이 있다. 본 연구는 해수담수화 플랜트에 특화된 소프트웨어 개발을 위하여, RAM 분석 프레임워크와 모델링 방법을 개발하고, 가용도 산출을 위한 이산사건 시뮬레이션 모델을 제안한다. 플랜트 정비의 특성을 고려하여 고장 정비 발생 시, 단일 부품의 수리/교체 뿐만 아니라 분해 정비 수준에 따라 접근 가능한 모든 부품을 동시 정비하는 예방정비 정책을 제안하고, 제안된 방법론에 따라 시뮬레이션 모델 및 프로토타입을 개발하였다. 이를 활용하여 국내외에 건설된 해수담수화 플랜트의 현장 데이터를 기반으로 시스템의 가용도 및 가동률 등을 추정 사례 연구를 수행하였고, 그 결과 실제 플랜트의 가용도와 근접한 결과를 얻었다.

스마트워크센터 성공 평가에 관한 연구 (A Study on Measuring the Success of Smart Work Center)

  • 이한찬;이소현;김희웅
    • 경영정보학연구
    • /
    • 제14권3호
    • /
    • pp.99-114
    • /
    • 2012
  • 저출산 고령화, 낮은 노동 생산성, 고질적인 대도시 교통 혼잡으로 인한 사회적 손실 등의 현안을 해결하고자 정부는 스마트워크 활성화 전략을 수립하여 전체 노동인구의 30%까지 스마트워크 근무율을 높여나가기로 했다. 따라서 본 연구는 스마트워크센터의 인프라와 서비스 측면에서 스마트워크센터의 성공요인들이 무엇인지 실증적으로 연구를 실시하였다. 정보시스템 성공모형(IS Success Model)을 기반으로 스마트워크센터의 성공적인 사용(활성화)에 영향을 주는 요인은 사용자에게 직접적으로 영향을 주는 출입통제나 온라인 좌석 예약시스템 등의 운영 인프라 품질이 직접적으로 영향을 미치는 것으로 연구결과 도출되었고, 물리적인 시설인프라 품질과 각종 어플리케이션을 제공하는 IT인프라 품질은 사용자 만족에 직접적인 영향을 미치고 사용자 만족은 스마트워크 센터 사용에 영향을 미침으로서 시설인프라 품질과 IT인프라 품질은 간접적으로 스마트워크센터 사용에 영향을 주는 것으로 연구결과 밝혀졌다.

  • PDF