• Title/Summary/Keyword: pipe test

Search Result 1,229, Processing Time 0.022 seconds

Winter to replace the hydraulic test and pneumatic test comparative analysis of study on the optimal pressure (동절기 수압시험을 대체하는 공기압시험의 적정압력 비교분석에 관한 연구)

  • Kwoun, Young-Hee;Hwang, Dong-Hwan;Kim, Tae-Gil;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.2
    • /
    • pp.211-216
    • /
    • 2014
  • Using a high-rise building water piping after hydrostatic test of the reliability of the leak to be completed if the pressure is maintained until the leak is not commercially available considered. Due to the nature of high-rise buildings and the construction period will take several years from the lower levels of use of the water supply and fire fighting water pipe construction is in progress, the order of which I do most of the first pipe to the construction and more than three years. So kind of riser pipe is complete, install the valve in the basement by installing an automatic pump to maintain a constant pressure after hydrostatic test and after each floor plumbing piping is complete, the progress of the hydrostatic test without undergoing a separate branch pipe the valve is opened automatically when the number of the pressing pressure of the structure. I kind of do and keep working pressure of pipe until the completion of the construction work to keep the damage to human error when it is intended to prepare. In winter, the frost protection and an alternative to drainage water pipe is damaged or deformed, even if unaware of the finishing work to the building, the use of the damage caused by a leak in a after construction of finish work to be expected. Alternative to reduce this damage if the pressure test without fear of freezing to help maintain long-term commercial pressures may be considered.

A Study on Percent Agent in Pipe as a Criterion to Evaluate Limitations and Performance of Gaseous Fire Extinguishing Systems (가스계 소화설비의 제한사항 및 성능평가를 위한 배관 내 약제비율에 관한 연구)

  • Son, Bong-Sei;Kim, Hee-Woo
    • Fire Science and Engineering
    • /
    • v.21 no.4
    • /
    • pp.1-11
    • /
    • 2007
  • This study aims to investigate, review, and summarize the definition, development, and applications of "percent agent in pipe", "percent of agent in pipe" which is used as a key factor in testing and evaluating the performance of gaseous fire extinguishing agents, including Halon 1301 and $CO_2$. This study also analyzes and compares the local and international standards on testing and evaluating the performance of gaseous fire extinguishing systems, as well as the results of system performance tests conducted as a part of performance evaluation and approval programs for gaseous fire extinguishing systems, especially, Korean Gaseous Fire Extinguishing System Performance Approval Program called KFI Approval. Percent agent in pipe was defined first in NFPA 12A, Standard on Halon 1301 Fire Extinguishing Systems, dating back to the 1970's. After the phaseout of Halon 1301 systems in 1994 in the developed countries, the percent agent in pipe has been widely used in Halon 1301 alternative clean agent fire extinguishing systems, both halocarbon clean agent systems and inert gas clean agent systems, as an essential criterion to assure the system design accuracy, determine the limitations and performance of a system, and to predict the system performance results accurately, especially, in association with their system flow calculations. Underwriters Laboratories has their own standards such as UL 2127 and 2166 applying percent agent in pipe in testing and evaluating the performance of clean agent fire extinguishing systems. As a part of a system performance test and approval program called KFI Approval System, Korea also has started to apply the percent agent in pipe as a key factor to test, evaluate, and approve the performance of gaseous fire extinguishing systems, including both high and low pressure $CO_2$ systems, from the early 2000's. This study outlines and summarizes the relevant UL and KFI standards and also describes the actual test resultant data, including the maximum percents of agent in pipe for gaseous fire extinguishing systems. As evidenced in lots of tests conducted as a part of the system performance test and approval programs like KFI Approval System, it has been proven that the percent agent in pipe may work as a key factor in testing, evaluating, and determining the limitations and performance of gaseous fire extinguishing systems, especially compared with the hydraulic flow calculations of computer design programs of gaseous fire extinguishing systems, and will remain as such in the future. As one thing to note, however, there are some difficulties in using the unified percent agent in pipe to determine the maximum lengths of pipe networks for gaseous fire extinguishing systems, because the varying definitions used by some of the flow calculations (not in accordance with NFPA 12A definition) make it impossible to do any direct comparison of pipe lengths based on percent agent in pipe.

A Study on the Measurement of the Crack Length Using the DCPD Method for the Fracture Test of the Pipe Specimen (직류전위차법을 이용한 배관 균열 길이 측정에 관한 연구)

  • Park, Jae-Sil;Seok, Chang-Sung
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.28 no.5
    • /
    • pp.640-647
    • /
    • 2004
  • In order to perform elastic-plastic fracture mechanical analyses, fracture resistance curves for concerned materials are required. The unloading compliance method and the DCPD(Direct Current Potential Drop) method have been widely used for measuring the crack length and the extension for a standard specimen fracture resistance curve test. However it is difficult to apply the unloading compliance method to a real pipe fracture resistance curve test. The objective of this paper is to propose the calibration equation between the normalized crack length and the normalized electric potential, and to apply to pipe fracture experiments. For these, finite element analyses were performed with various current input locations and crack front configurations. Also the 4-point bending jig was manufactured for a pipe test and the DCPD method was used to measure crack extensions and crack lengths for a pipe test. The calculated crack length by the DCPD method agreed with the measured crack length within 5% error.

Study on Pullout Behavior of Pipe Anchor (파이프형 앵커의 인발거동에 대한 연구)

  • Bae, Wooseok;Lee, Bongjik;Kwon, Youngcheul;Lee, Jundae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.1
    • /
    • pp.5-10
    • /
    • 2008
  • In this study, laboratory model test was performed to estimate pullout behavior of pipe type anchor with surface roughness, embedment and diameter. The design of buried pipe anchors in areas of vertical ground movement is governed, in part, by magnitude of the forces imposed on the pipe and displacements at which they are developed. In this paper, uplift resistance and displacement characteristics of pipe anchors caused by ground condition and embedment ratio, surface roughness, pipe diameter through the analysis of pipe anchor model test were compared and analyzed. The test results of the buried pipe showed that as the relative density increases, ultimate uplift resistance increase in 20%. When pipe anchor is failed with the relative density of the ground, the change of surface roughness, it was shown that the deformation increases as the ratio of penetration increases from 2 to 8 in five times approximately. And most anchor-based theories overestimate the breakout factor.

  • PDF

Manufacturing Procedure and Characteristic of Sintered Wick for Heat Pipe (히트파이프용 소결윅의 제작과정 및 특성)

  • Yun, Ho-Gyeong;Moon, Seok-Hwan;Hwang, Gunn;Choy, Tae-Goo
    • Proceedings of the KSME Conference
    • /
    • 2001.06d
    • /
    • pp.365-370
    • /
    • 2001
  • There are various wick types for heat pipe. In the present study, the manufacturing technology of a sintered wick among various wick types is discussed. The sintering technology using metal has been applied broadly in the field of electronic-telecommunication as well as heat pipes. A study of manufacturing procedure and characteristic of sintered wick for heat pipe have been performed. Copper powder was used as wick material and stainless steel as a mandrel. A manufacturing technology of the mandrel for arranging vapor core in heat pipe, a sintering technology by first or second times and operating temperature for sintering, the measurements of a porosity, pore size, and pore distribution of sintered wick were considered. In the meantime, a heat pipe with sintered wick has been manufactured and a performance test of the heat pipe has been performed in order to review cooling performance. The performance test results for the 4mm diameter heat pipe with the sintered wick shows the stability since the temperature difference between a evaporator and a condenser of the heat pipe is less than $4.4^{\circ}C$, and thermal resistance is less than $0.7^{\circ}C/W$.

  • PDF

Prediction of Failure Behavior for Nuclear Piping Using Curved Wide-Plate Test (흰 광폭평판 시험을 이용한 원자력 배관의 파괴거동예측)

  • Huh, Nam-Su;Kim, Yun-Jae;Choi, Jae-Boong;Kim, Young-Jin;Lim, Hyuk-Soon;Chung, Dae-Yul
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.28 no.4
    • /
    • pp.352-361
    • /
    • 2004
  • One important element of the Leak-Before-Break analysis of nuclear piping is how to determine relevant fracture toughness (or the J-resistance curve) for nonlinear fracture mechanics analysis. The practice to use fracture toughness from a standard C(T) specimen is known to often give conservative estimates of toughness. To improve the accuracy, this paper proposes a new method to determine fracture toughness using a nonstandard testing specimen, curved wide-plate in tension. To show validity of the proposed curved wide-plate test, the J-resistance curve from the full-scale pipe test is compared with that from the curved wide-plate test and that from the C(T) specimen. It is shown that the J-resistance curve form the curved wide-plate tension test is similar to, but that from the C(T) specimen is lower than, the J-resistance curve from the full-scale pipe test. Further validation is performed by investigating crack-tip constraint conditions via detailed 3-D FE analyses, which shows that the crack-tip constraint condition in the curved wide-plate tension specimen is indeed similar to that in the full-scale pipe under bending.

Performance Test for the Performance Reliability of the Heat Pipe for Cooling Power Semiconductors (전력반도체 냉각용 히트파이프의 성능안정성 파악을 위한 성능시험)

  • 강환국
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.9 no.3
    • /
    • pp.203-212
    • /
    • 2004
  • The heat pipe for cooling power semiconductor is required no performance changing during the life cycle up to 20 years. For the long reliable performance of the heat pipe, my reasons that has possibility to generate non condensable gases we not allowed. In this research, the maximum heat transport rate and operation characteristics that are related to various geometric and thermal conditions are carried out. Also the test items, specifications and methods to guarantee the long life cycle of the heat pipe for power semiconductor cooling device are provided and the tests are performed.

Formulation of Cyclic Plasticity Model and FE Analysis for SM490 TMC (SM490 TMC 강재의 반복소성모델의 정식화 및 유한요소해석)

  • 장갑철;장경호
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.10a
    • /
    • pp.84-89
    • /
    • 2004
  • In this paper, cyclic plasticity model of SM490 TMC was formulated by basing on monotonic loading test and cyclic loading test. For exact description of cyclic performance and plastic deformation capacity of steel member using SM490 TMC, formulated cyclic plasticity model and finite deformation theory were applied to 3-dimensional elastic-plastic FE analysis. Cyclic plastic behavior of pipe-section steel column using SM490 TMC was clarified by carrying out numerical analysis. Also, in order to clarifying seismic performance of pipe-section steel column using SM490 TMC, analysis results were compared with analysis results of pipe-section steel column using SM490. A comparison of analysis results shows that SM490 TMC pipe-section steel column has a better cyclic performance for strength and energy dissipation than SM490 pipe-section steel column under cyclic loading

  • PDF

Evaluation of HIC/SSCC Resistance for API-X70 Pipe Manufactured by JCO Bending Process and SA Welding (JCO 밴딩과 SA용접으로 제조된 API-X70급 강관의 HIC/SSCC 저항성 평가)

  • Ryoo, Hoi-Soo;Kim, Hee Jin;Lee, Dong-Eon
    • Journal of Welding and Joining
    • /
    • v.32 no.5
    • /
    • pp.1-6
    • /
    • 2014
  • This study aims at manufacturing SA welded API-X70 line-pipe with sour gas resistance. A pipe was manufactured by JCO bending process and SA welding using the API-X70 plate guaranteed HIC resistance. SA welded pipe was expanded in order to reduce the residual stress. The evaluation of a pipe for resistance to HIC and SSCC were performed by the RS D 0004 and RS D 0005 standards. For verification that a pipe has acceptable resistance to HIC, fullscale test was carried out. Results showed no cracking for the HIC and SSCC.

Experimental Study on the Performance Improvement of Aluminum Grooved Heat Pipe due to increased number of Grooves (그루브수 증가에 따른 알루미늄 그루브 히트파이프의 성능향상에 관한 실험적 연구)

  • 홍진관;최상곤;김대성;정원복;변윤식;영권옥
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.13 no.6
    • /
    • pp.474-481
    • /
    • 2001
  • Aluminum/Freon22 grooved hat pipes which have 26 axial grooves in a cross-section were manufactured and tested. The performance test was conducted by varying filling ratio and tilt angle. Operation limit, thermal resistance, overall heat transfer coefficient were investigated. The experimental result was compared with previous study which conducted in the case of a heat pipe with combined wick. The experimental result shows that thermal resistance of this heat pipe is twice smaller than that of the heat pipe with combined wick and operation limit is increased about 75%, comparing with that of heat pipe with combined wick.

  • PDF