• Title/Summary/Keyword: pilot plant

Search Result 713, Processing Time 0.031 seconds

Optimum Operation of a PVDF-type Hollow Fiber Membrane Bioreactor for Continuous Sewage Treatment

  • Shin, Choon-Hwan
    • Journal of Environmental Science International
    • /
    • v.19 no.11
    • /
    • pp.1315-1322
    • /
    • 2010
  • A membrane bioreactor (MBR) was designed using polyvinylidene fluoride(PVDF)-type hollow fiber membrane modules with a treatment capacity of 10 ton/day. A pilot plant was installed in a sewage treatment plant and was operated with an intermittent aeration method which avoids any concentration gradient of suspended solids (SS) in the MBR. For continuous operation, the pilot plant was first tested with influent (mixed liquor suspended solid:MLSS of 1000-2000 mg/L) of aeration tanks in the sewage treatment plant. The MBR was pre-treated with washing water, 10% ethanol solution, 5% NaOCl solution and finally washing water, one after another. To demonstrate the effect of the MBR on sewage treatment, compared with conventional activated sludge processes, we investigated the relationships among permeate amount (LMH), change in operation conditions, influent MLSS level and sludge production. It was found that the optimum aeration rate and suction pressure were $0.3\;m^3$/min and 30~31 cmHg, respectively. Under stable conditions in aeration, suction pressure, influent flow rate and drainage, the SS removal efficiency was more than 99.99% even when the MLSS loading rate changes. Compared with conventional activated sludge processes, the MBR was more effective in cost reduction by 27% based on permeate amount and by 51.5% on sludge production.

Efficiency Assessment of Turbine for Tidal Current Power Plant by In-Field Experimental Test (현장계측에 의한 조류 발전용 수차의 효율 평가)

  • Han, Sang-Hun;Lee, Kwang-Soo;Yum, Ki-Dai;Park, Woo-Sun;Park, Jin-Soon;Yi, Jin-Hak
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.517-520
    • /
    • 2006
  • The Korean peninsula has a number of coastal sites where the rhythmic rising and lowering of water surface due to tides results in strong tidal current. The kinetic energy of these currents can be efficiently exploited by use of tidal current turbines. The pilot tidal current power plant is to be constructed at the Uldolmok narrow channel between J info and Haenam, Our ins next Year, and extensive coastal engineer ing research works have been carried out. This paper describes and analyzes some observation results of field test about the efficiency of Helical turbine for tidal current power plant. The efficiency of turbine, which is diameter 2.2m and height 2.5m, is evaluated meximum RPM, torque, and current velocity. The tested turbines had the maximum efficiencies of the bounds of 25 to 35% in the current velocity range between 1.4 and 2.6 m/s. This result shows that the pilot tidal current power plant needs three helical turbines with diameter 3.0m and height 3.6m to produce electric power 500kW.

  • PDF

Design Parameters for Pilot Tests of 1MW Tidal Current Power Generation (1MW급 조류발전 실증실험을 위한 설계인자 도출)

  • Oh, Myoung-Hak;Lee, Kwang-Soo;Yum, Ki-Dai;Park, Woo-Sun;Han, Sang-Hun;Park, Jin-Soon;Yi, Jin-Hak
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.130-133
    • /
    • 2006
  • It is well-known that the resources for tide and tidal current energy are abundant in Korea. The south coast in Korea is recognized as one of the most appropriate places in the world for developing tidal current energy. The target site for harnessing tidal current energy is the Uldolmok, where the strongest tidal current in Korea occurs. In order to commercialize and industrialize the tidal current power generation, the construction of pilot tidal current power plant of 1MW has been started in April 2006, and is expected to be completed by May 2007. Extensive works including field investigation, field experiment for evaluating the efficiency of helical turbine and numerical analysis have been performed. This paper present the several design parameters for constructing the Uldolmok pilot tidal current power plant.

  • PDF

The Improvement of Flocculation Basin in Water Treatment Process (정수처리공정에서 플록형성지의 효율향상 연구)

  • Gang, Chang-Ho;Lee, Hyeon-Dong;Yu, Jae-O
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.3
    • /
    • pp.231-240
    • /
    • 2001
  • The problem of the flocculation basin was induced by installing the pilot plant using tracer test at Yang-Duck water treatment plant in Pohang cite. The flocculation basin model downscaled as 1/20 was made of acryl and evaluated hydraulically by transforming the section of the effluent in the flocculation basin. The optimum section of the effluent was suggested and applied to the plant. The efficiency of the flocculation basin according to improvement was evaluated by the particle counter which can count the number of particles each size fraction. The results of this study are as follows : First, it was desirable to make the retention time as short as possible because the flow and the index value were similar regardless of the retention time. Second, after the modification in Yang-Duck water treatment plant, the problem of destruction of floe was improved and the plant was operated satisfactorily. The hydraulic experiment with tracer test can be applied to the performance evaluation as well as improvement of facility in unit process of existing water treatment plant. Additionally, it can be used to find a design factor in the new water treatment plant.

  • PDF

Ecotoxicity Assessment for Livestock Waste Water Treated by a Low Impact Development(LID) Pilot Plant (파일럿 규모의 LID공법을 적용한 축산폐수 처리수에 대한 생태독성 평가)

  • Park, Da Kyung;Chang, Soon-Woong;Choi, Hanna
    • Korean Journal of Environmental Biology
    • /
    • v.35 no.4
    • /
    • pp.662-669
    • /
    • 2017
  • This study evaluated the ecotoxicological properties of livestock waste water treated by a LID (Low Impact Development) system, using a mixture of bio-reeds and bio-ceramics as suitable bed media for a subsequent treatment process of a livestock wastewater treatment plant. The relationship between the pollutant reduction rate and the ecotoxicity was analyzed with the effluents from the inlet pilot plant, with vegetated swale and wetlands and the batch type of an infiltration trench. Each pilot plant consisted of a bio process using bio-reeds and bio-ceramics as bed media, as well as a general process using general reeds and a bed as a control group. The results indicated that, after applying the HRT 24 hour LID method, the ecotoxicity was considerably lowered and the batch type pilot plant was shown to be effective for toxicity reduction. The LID method is expected to be effective for water quality management, considering ecotoxicity by not only as a nonpoint source pollution abatement facility but also, as a subsequent treatment process linked with a livestock manure purification facility. It is necessary to take the LID technic optimization study further to apply it as a subsequent process for livestock wastewater treatment.

The Study on the Non-Point Pollutants Reduction Using Friendly Bank Protection Anaerobic/Aerobic Contact Filtration Zone (혐기/호기 접촉여과대를 이용한 자연형 하천호안공법의 비점오염 저감 특성 연구)

  • Chang, HyungJoon;Kim, SungDuk
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.1
    • /
    • pp.23-34
    • /
    • 2019
  • It is an urgent issue to manage and reduce non-point pollution sources for improving the water quality of stream and lakes in rural areas. In this study, in order to reduce non-point pollution sources in rural area, Gabion mattresses was proposed to provide protection of riverbanks with anaerobic and aerobic area. The utilization of this was assessed by lab scale model test and pilot plant test. After filling the inside of the gabion mattresses with aggregate, the filtration zone under anaerobic and aerobic conditions was formed to treat the contaminants. In addition, vegetation was deposited on the surfae of the gabion to prevent the inflow of soil and to promote purification by the plant. COD and nitrogen content (T-N, $NH_4{^+}$, -N, $NO_3{^-}N$) were monitored in model and field tests. The lab scale model test showed removal efficiency of 17% of TCOD, 35% of SCOD, 14% of TN, 62% of $NH_4{^+}$, -N, and 33% of $NO_3{^-}$ N. Also, pilot plant test showed removal efficiency of 24% of TCOD, 29% of SCOD, 47% of TN, 50% of $NH_4{^+}-N$, 33% of $NO_3{^-}$, N and 29% of TP.

A Pilot-Scale Study of Multiple Stage of Constructed Wetland Treatment System and Modeling for Nutrient Removal (Pilot 규모 연속배열형 인공습지의 영양염류 제거효능 규명 및 평가모델 연구)

  • Choi, Seung Il;Iamchaturapatr, Janjit;Rhee, Jae Seong
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.5
    • /
    • pp.781-788
    • /
    • 2010
  • A pilot study was performed to examine the feasibility of multiple stage of constructed wetland (CW) for nutrient removal. The system is composed of six wetland cells connected with water-ways. The hydraulic of wetland cells is designed as free water surface flow. The treatment capacity was $25m^3d^{-1}$ at HRT of about one day for each cell. The magnitude of nutrient removal was related with the length of wetlands and plant density. Total N and P removal rates were 1353 and $246mg\;m^{-2}d^{-1}$ respectively. The pilot-scale reactor was model as continuous flow system containing contribution of CSTR and PFR typed-reactors. The $k-C^*$ model equation was applied to predict N and P reduction. The result indicated the equation was well guided to estimate reduction of $NO_3-N$ and $PO_4-P$.

A Study on Removal of Organics, Nitrogen and Phoschorus of Domestic Wastewater in Pilot-Scale Upflow Packed Bed Column Reactor (Pilot 규모의 상향류식 충전탑 반응기를 이용한 생활오수의 유기물 및 질소, 인 처리에 관한 연구)

  • Seon, Yong-Ho
    • KSBB Journal
    • /
    • v.22 no.4
    • /
    • pp.191-196
    • /
    • 2007
  • This study used biofilm process, which needs simple operation, maintenance and smaller facility area than conventional activated sludge process with the small plant operation, in the treatment of increasing sewage with the rapid industrial growth. The reactor used in this study consists of one anaerobic and one aerobic chamber filled with waste ceramic and waste vinyl as media and the treated sewage was from restaurant source. The experiment was scaled up from lab. to pilot scale and lasted for about 100 days. We focused on the removal efficiency of organics, nitrogen and phosphorus with constant HRT and continuous aeration. The removal efficiency of $BOD_5$ and SS were 94.33% and 87.77% respectively, which was a satisfaction level. However the removal efficiency of $COD_{Cr}$ was 81.46% somewhat below the desired level of 90%, and that of T-N and T-P showed 71.92% and 21.10% respectively, that was below the expected value. The removal efficiency of $COD_{Cr}$ and T-N in the pilot scale was about 10% low compared with the lab.-scale.

Effect of specific growth rate on the extracellular expression of Baccillus stearothermophillus Ll lipase in recombinant Saccharomyces cerevisiae

  • An, Jeong-O;Jang, Hyeong-Uk;Lee, Hong-Won;An, Ik-Seong;Ham, Seung-Ju;Jeong, Jun-Gi
    • 한국생물공학회:학술대회논문집
    • /
    • 2001.11a
    • /
    • pp.367-369
    • /
    • 2001
  • Recombinant lipase gene (pYEGA ${\alpha}$ -lip) originated from Bacillus stearothermophillus Ll was overexpressed in Saccharomyces cerevisiae. The lipase gene expression level was compared by controlling a constant specifjc growth rates( ${\mu}$ = 0.03, 0.05, 0.07 and $0.1h^{-1}$. Cell g개wth was successfully controlled at the desired rates by feeding rate of glucose and the formation of by-product or accumulation of the glucose was not observed. Above the growth rate of $0.1h^{-1}$. the desired growth rate could not be achieved caused accumulation of by-products(ethanol). The lipase production increased as the specific growth rate decreased. The specific production rate at the lowest specific growth rater(${\mu}$ =0.03) was above 2- folds than the others.

  • PDF