• Title/Summary/Keyword: pile driving

Search Result 185, Processing Time 0.023 seconds

Evaluation of Pile Bearing Capacity using Calibration Chamber Test (모형토조실험을 통한 말뚝지지력의 평가)

  • 이인모;이명환
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1992.03a
    • /
    • pp.13-40
    • /
    • 1992
  • Static formulae based on limiting equilibrium theories often provide misleading predictions of pile bearing capacity in cohesionless soils due to the incorrect basic assumptions or oversimplification of actual soil conditions. Soil conditions prior to pile driving are significantly changed after pile installation and imposition of high stress levels. Therefore soi1 parameters at failure rather than those obtained at initial conditions should be used in application of static formulae. In this research. model pile test data were analyzed and compared with the predicted values obtained from the various static formulae. The results showed that the proper choice of soil parameters remarkably improve the reliability of static formulae.

  • PDF

Experimental Study for Prediction of Ground Vibration Responses by the Low-Vibration Pile Driving Methods (저진동 파일시공법에 따른 지반진동 응답 예측을 위한 실험적 연구)

  • Park, Sun-Joon;Kang, Sung-Hoo;Jung, Seug-Gyu
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2010.10a
    • /
    • pp.201-207
    • /
    • 2010
  • In this study, the SIP (Soil-cement Injected precast Pile) method among the Low-vibration & Low-noise pile driving methods was decided into study compensation. Ground vibrations by the SIP methods step by step divide and were analyzed. Quantitative response values and ground vibration equations with reliability were presented from findings of this study. Also, vibration responses that are occurred by the SIP method of construction were compared as quantitative with vibration responses by general method of construction that are presented in existent study. Ground vibration values by the SIP method correspond to level of 17 ~ 57% of values that are assumed by the Attewell & Famer's equation, respectively, and these result compares in reliability 50% and separated distance 10 ~ 50 m. Also, those values were analyzed that correspond to level of 14 ~ 96% of ground vibration values by the Prof. Park's equation, respectively. Construction limit extents, separation distances from vibration occurs position, were presented that can satisfy domestic criteria for vibration control for the SIP methods. Those presented in this paper were divided newly according to reliability.

  • PDF

Evaluation and Adjustment of Dynamic Pile-Driving Formulas (말뚝 지지력 산정을 위한 동역학적 공식의 정확도 분석 및 수정)

  • Chung, Choong Ki;Kim, Myoung Mo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.5 no.4
    • /
    • pp.23-30
    • /
    • 1985
  • Dynamic pile-driving formulas are widely used in predicting the load capacity of piles in cohesionless soils. However, the accuracy of the formulas has been questioned for a long time due to their oversimplified assumptions and empirical parameters involved in the formulas. The allowable pile capacities calculated by 6 different dynamic pile-driving formulas are compared statistically with the capacities measured in the field, in this paper, to find out the correlations between the calculated capacities and the measured values. The statistical data are then used to evaluate and to adjust the formulas to improve their accuracy. For the greatest accuracy and simplicity of use, it is recommended that the adjusted form of Gates formula be used. When the result of this recommended formula is compared with that of the existing Olson's modified formula, the former is found to be conservative by more than 10 percents.

  • PDF

Dynamic Behavior of Large Diameter steel Pipe Piles during driving (대구경 강관말뚝의 항타시 동적 거동)

  • 이영남;이종섭
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.4
    • /
    • pp.141-148
    • /
    • 2000
  • For the construction of 4.8km long Multi-Purpose Jamuna Bridge in Bangladesh, 2 or 3 large diameter open-ended steel pipe piles were used for the foundation of piers. A total of 123 piles were driven for 50 piers and 2 test piles from the river bed through the normally-consolidated upper sand layer and rested n top of gravel layer. Two types of piles, having 3.15 or 2.50m diameter and variable wall thickness in the range of 40 to 60mm, were driven to the depths of 69 to 74m with the rake of 6:1 by connecting 2 or 3 pieces of short piles. Dynamic pile tests were performed on 24 selected piles during pile driving and soil plug length inside the pile was also measured after driving of each short section.These piles were plugged with soil to, though slightly affected by pile diameters, about 75% of total length of pile driven. Active plug at the tip of pile contributed substantial amount of inner skin friction to the total capacity. Piles soon after driving showed a skin-friction dominant pile behaviour, tat is, 90% of total capacity being developed by skin resistance. Quakes values and Smith damping factors were almost constant regardless of pile diameters. This result reflects the influence of uniform soil condition at the site.

  • PDF

Movement range and behavior characteristics of Pagrus major by acoustic telemetry in Byeonsan Peninsular, Korea (음향 텔레메트리에 의한 변산반도에서의 참돔(Pagrus major)의 이동 범위 및 행동 특성)

  • HEO, Gyeom;HEO, Min-A;KANG, Kyoungmi;HWANG, Doo-Jin;SHIN, Hyeon-Ok
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.57 no.1
    • /
    • pp.34-44
    • /
    • 2021
  • In order to collect basic information of response behavior of red seabream (Pagrus major) during pilling, works for constructing wind power station in Byeonsan Peninsular, Korea were investigated. Four cultured red seabream CRB1 to CRB4 [total length (TL): 27.1 ± 1.0 cm; body weight: 359 ± 30 g] were tagged with an acoustic tag and used in experiment. CRB1 and CRB2 to CBR4 were released on the sea surface at same time around the constructing site of the wind power plant on September 22, 2017 and July 18, 2018, respectively. The tracking of the CRB1 to CRB2 and CRB3 to CRB4 were conducted for two hours, approximately, using VR100 receiver including a directional hydrophone and VR2W receivers array consisted of 19 presence/absence receivers (VR2W receivers), respectively. The underwater noise level before (no pile driving works) and during pile driving works was measured 116.0-118.0 dB (re 1��Pa) and a maximum of 160 dB (re 1��Pa), respectively. CRB1 moved about 6.0 km with average swimming speed of 80.2 ± 20.5 cm/s for 2.1 hours without pile driving work. The average water depth of the sea bed on the route of CRB1 was 9.1 ± 0.4 m. CRB2 moved about 7.3 km with the average swimming speed of 96.8 ± 27.1 cm/s for 2.1 hours with pile driving work. The water depth of the sea bed on the route of CRB2 was 11.9 ± 0.6 m. At results of the Rayleigh's z-test two fishes CRB1 and CRB2 showed significant directionality in the movement (p < 0.01). Movement mean angles of CRB1 and CRB2 were 92.7 and 251.8°, respectively. CRB2, CRB3 and CRB4 exhibited the escaping behavioral response from the noise of source during the pile driving work. The swimming speed of the CRB2 exposed on the heavy underwater noise stimuli due to the pile driving work was 1.21 times faster than that of the CRB1 exposed on the ambient underwater noise in the study site.

Evaluation of abutment types on highway in terms on driving comfort

  • Nam, Moon S.;Park, Min-Cheol;Do, Jong-Nam
    • Geomechanics and Engineering
    • /
    • v.13 no.1
    • /
    • pp.43-61
    • /
    • 2017
  • The inverted T-type abutments are generally used in highway bridges constructed in Korea. This type of abutment is used because it has greater stability, with more pile foundations embedded in the bedrock, while simultaneously providing support for lateral earth pressure and vertical loads of superstructures. However, the cross section of inverted T-type abutments is large compared with the piers, which makes them more expensive. In addition, a differential settlement between the abutment and embankment, as well as the expansion joints, causes driving discomfort. This study evaluated the driving comfort of several types of abutments to improve driving comfort on the abutment. To achieve this objective, a traditional T-type abutment and three types of candidate abutments, namely, mechanically stabilized earth wall (MSEW) abutment supported by a shallow foundation (called "true MSEW abutment"), MSEW abutment supported by piles (called "mixed MSEW abutment"), and pile bent and integral abutment with MSEW (called "MIP abutment"), were selected to consider their design and economic feasibility. Finite element analysis was performed using the design section of the candidate abutments. Subsequently, the settlements of each candidate abutment, approach slabs, and paved surfaces of the bridges were reviewed. Finally, the driving comfort on each candidate abutment was evaluated using a vehicle dynamic simulation. The true MSEW abutment demonstrated the most excellent driving comfort. However, this abutment can cause problems with respect to serviceability and maintenance due to excessive settlements. After our overall review, we determined that the mixed MSEW and the MIP abutments are the most appropriate abutment types to improve driving comfort by taking the highway conditions in Korea into consideration.

A Study on the Formulae for the Compressive Stresses in Concrete Piles during Driving (콘크리트말뚝 타입시 발생하는 압축응력의 산정식에 관한 연구)

  • 임종석
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.1
    • /
    • pp.5-13
    • /
    • 1999
  • Maximum stress in pile is developed when it is driven. If the stress is greater than allowable stress of the pile, the pile will be damaged and result in stability problem. Therefore, the stress should be estimated correctly beforehand and overstress should be prevented during pile driving. There are many methods to estimate compressive stresses in concrete piles when they are driven. Nowadays, computer analysis on wave equation offers a satisfactory results. But. under certain circumstances, application of this method is difficult. Then, estimation of the stress utilizing simple formulae might be practical. In this study, relatively reasonable formulae were selected and the stresses which were measured in situ and calculated from the formulae were compared and analysed. The results show that the calculated values from Uto and Huyuki's formula were reasonably accurate and more accurate values were acquired if the values are modified by multiplying the reduction factors according to ground and construction conditions.

  • PDF

Experimental study on axial response of different pile materials in organic soil

  • Canakci, Hanifi;Hamed, Majid
    • Geomechanics and Engineering
    • /
    • v.12 no.6
    • /
    • pp.899-917
    • /
    • 2017
  • Sixty four tests were performed in a steel tank to investigate the axial responses of piles driven into organic soil prepared at two different densities using a drop hammer. Four different pile materials were used: wood, steel, smooth concrete, and rough concrete, with different length to diameter ratios. The results of the load tests showed that the shaft load capacity of rough concrete piles continuously increased with pile settlement. In contrast, the others pile types reached the ultimate shaft resistance at a settlement equal to about 10% of the pile diameter. The ratios of base to shaft capacities of the piles were found to vary with the length to diameter ratio, surface roughness, and the density of the organic soil. The ultimate unit shaft resistance of the rough concrete pile was always greater than that of other piles irrespective of soil condition and pile length. However, the ultimate base resistance of all piles was approximately close to each other.

Case Study on the Characteristics of Vertical Bearing Capacity for Steel Pipe Pile Installed by PRD (PRD 강환 말뚝의 연직지지력 특성에 관한 사례 연구)

  • 최용규;정창규;정성기;김동철;정태만
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.225-232
    • /
    • 1999
  • Construction case of PRD (Percussion Rotary Drill) pipe pile and matters to be attended in construction of PRD pile were reviewed. The compressive and uplifting static pile load tests for PRD piles were performed and, also, analysis by Pile Driving Analyzer was done. Based on these results, bearing components in each resisting part (that is: steel toe, external skin, and internal skin) were measured separately. The measured resisting force was compared to the value calculated by the estimated formula. The pile capacity was mobilized in steel toe area and the external skin friction and the internal friction were not produced. Thus, it could be considered that toe of PRD pile should be supported in hard bearing stratum (for example, the fresh soft rock).

  • PDF