• Title/Summary/Keyword: peak travel time

Search Result 89, Processing Time 0.026 seconds

A Forecasting Model for the Flood Peak Stage and Flood Travel Time by Hydraulic Flood Routing

  • Yoon, Yong-Nam;Park, Moo-Jong
    • Korean Journal of Hydrosciences
    • /
    • v.4
    • /
    • pp.11-19
    • /
    • 1993
  • The peak flood discharge at a downstream station and the flood travel time between a pair of dams due to a specific flood release from the upper reservoir are computed using a hydraulic river channel routing method. The study covered the whole large reservoir system in the Han River, Korea. The computed flood discharges and the travel times between dams were correlated with the duration and the magnitude of flood release rate at the upstream reservoir, and hence a multiple regression model is proposed for each river reach between a pair of dams. The peak flood discharge at a downstream location can be converted to the peak flood stage by a rating curve. Hence, the proposed regression model could be used to forecast the peak flood stage at a downstream location and the flood travel time between dams using the information on the flood travel time, release rate and duration from the upper dam.

  • PDF

Forecasting of Peak Flood Stage at Downstream Location and the Flood Travel Time by Hydraulic Flood Routing (수리학적 홍수추적에 의한 댐 방류시 하류수위 및 주요 하도구간별 홍수도달 시간의 예측)

  • 윤용남;박무종
    • Water for future
    • /
    • v.25 no.3
    • /
    • pp.115-124
    • /
    • 1992
  • The peak flood discharge at a downstream station and the flood travel time between a pair of dams due to a specific flood release from the upper reservoir are computed using a hydraulic river channel routing method. The study covered the whole reservoir system in the Han River. The computed peak flood discharges and the travel times between dams were correlated with the duration and the magnitude of flood release rate at the upstream reservoir, and hence a multiple regression model is proposed for each river reach between a pair of dams. The peak flood discharge at a downstream location can be converted to the peak flood stage by rating curve. Hence, the proposed regression model could be used to forecast the peak flood stage at a downstream location and the flood travel time between dams using the information on the flood release rate and duration from the upper dam.

  • PDF

Estimation and Application of the Value of Travel Time by Time Period: A Case Study of Downtown Highway Expansion Project (시간대별 통행시간가치 추정 및 적용: 도심부 도로 확장 사업 사례연구를 중심으로)

  • Lee, Jae-Young;Choi, Keechoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.7-15
    • /
    • 2011
  • The travel time value is important factor for the evaluation of feasibility the transportation facility investment. The existing method for calculation of the travel time for each mode uses daily average trip purpose. So the value of travel time is constant because it is estimated with only daily average proportion. This daily constant time value can distort the results of future demands of toll roads or economic appraisals for the projects. The proportion of the trip purpose varies by time periods. Accordingly the value of travel time also varies by time periods. In this study, times periods are classified as morning peak, evening peak, business time off-peak, and non-business time off-peak. And trip purpose proportions are sorted by each time period from raw data of Seoul household trip study, then the value of travel time for each time period is estimated with these sorted purpose proportions. A case study of Seoul Jung-gu and Yongsan-gu performed with newly estimated time value by time periods. The result of benefit calculation with the daily constant time value is overestimated approximately annual 2.5 billion Won compared by time values by time periods. The demands of toll roads are also overestimated with the existing daily constant time value by daily 3,500 vehicles and total revenue of toll roads are overestimated by annually 1 billion Won. In conclusion, the value of travel time by each time period enables the more precise economic evaluation of the transportation facility investment projects, mode choice behavior, and route choice behavior especially for toll roads.

A study of comparing the travel time between urban railways and arterials in the Seoul metropolitan area (수도권 교통축별 도시철도와 간선도로 승용차 이용자 통행속도 비교연구)

  • 김양지;김경철
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.17-23
    • /
    • 2001
  • The aim of tins study is to compare the travel time of urban railway with that of arterial roads in the Seoul metropolitan area, focusing on the five main railways and arterials - Ilsan, Bundang, Kwacheon, Kyoungwon, and Kyoungin in order to make suggestions about improvements of railways. We found that the travel times of railways and arterials are about one and a half hour and an hour respectively, also the ratio of railway travel time to arterial travel time is 1.34 at peak and 1.58 at off-peak. We conclude that the competitiveness of the railroads is lower than the arterials. It will be necessary that we research the ways to improve the service of railways and investment ranking among the five main railways.

  • PDF

도시 소하천 개발에 따른 유출 변화량의 모의기법에 관한 연구

  • 김성원;조정석
    • Journal of Environmental Science International
    • /
    • v.7 no.4
    • /
    • pp.451-460
    • /
    • 1998
  • The objectives of this study Is to evaluate the total runoff yield, peak flow and peak flow travel time depending on the urbanization, return period and rainfall patterns at the downstream of Manchon urban watershed in TaeGu City. SWM(Storm Water Management Model) is used for runog analysis based on 5 different steps of urbanization and 4 different types of Hufrs quartile according to 8 return periods. It is analyzed that the order of total runoff yield according to raiun patterns is Huffs 4, Huffs 2. Huffs 3 and Huffs 1 quartile, that of peak flow magnitude is Huffs 2, Huffs 1, Huffs 4 and Huffs 3 quartile at present development ratio. under the 60, 70, 80 and 90ft of urbanization to the 50% of urbanization by means of the rainfall patterns, the mean Increasing ratio of total runoff yield for each case is 4.55, 11.43, 16.07 and 20.02%, that of peak flow is 5.82, 13.61, 17.15 and 18.83%, the mean decreasing ratio of peak flow travel time Is 0.00, 2.44, 5.07 and 6.26%, the mean increasing ratio of runoff depth Is 4.51, 11.42, 16.02 and 20.05% respectively. the mean increasing ratio of total runoff yield by means of each and 19.71%. Therefore, as the result of this study. it can be used for principal data as to storm sewage treatment and flood damage protection planning in urban small watershed.

  • PDF

Analysis of Runoff Effect of Drainage System at Urban Watershed due to Urbanization (도시화에 따른 도시유역 배수계통의 유출영향분석에 관한 연구)

  • Seo, Kyu Woo;Heo, Jun Haeng;Cho, Won Cheol
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.11 no.4
    • /
    • pp.80-90
    • /
    • 1997
  • The ILLUDAS and SWMM models were applied to the developing area of Dongsucheon for comparisons of the total runoff, peak discharge and travel time. For this purpose, the present and future urbanization rates were assumed 70% and 90%, respectively. The runoff analysis of two models has been performed based on 10, 20, 30 and 50 return periods and Huff's 4 quantiles for time distribution pattern of design rainfalls. As results, the total runoff based on Huff's pattern had an decreasing order of 1, 4, 3 and 2 quantiles for both models. The SWMM model showed that there were 4.3% increasing of the total runoff, 4.9% increasing of peak discharge, and 6.6% decreasing of travel time. Similarly, for ILLUDAS model, there were 7.3% and 9.2% increasing of total runoff and peak discharge, respectively and 9.1% decreasing of travel time.

  • PDF

A Study on the Optimum Design of the Arterial-Based Signal System for the Relief of Transportation Problems in Metropolitan Areas (대도시 교통문제 완화를 위한 간선도로별 신호체계의 최적설계에 관한 연구)

  • Kim, T.G.
    • Journal of Korean Port Research
    • /
    • v.8 no.2
    • /
    • pp.1-35
    • /
    • 1994
  • The main arterial which runs through the in City of Pusan, carries about 60% of downtown traffic or more, maintains about 20% yearly increase in traffic is severely suffering from the traffic congestion because of concentrated traffic volumes regardless of peak-time periods. The purpose of this study was to grasp the traffic, geometric, and signal conditions of the main arterial through the Videologging System Techniques, perform the transportation system analyses, and finally suggest the improvements which could increase the travel capacity, reduce the average delay and fuel consumption with the optimal conditions of signal system. The following conclusions were drawn : firstly the traffic system should be shifted for the travel distribution on the arterial during the peak time periods, secondly the roadway system of the arterial reviewed for left-turn traffic during the peak time periods, and thirdly the signal system of intersection reconstructed for signal optimization or progression within the range of cycle length suggested.

  • PDF

Scenario Analysis of Flood Travel Time using Hydraulic Model in Downstream of Nakdong River (수리학적 모형을 이용한 낙동강 하류구간에서의 홍수도달시간 시나리오 분석)

  • Choi, Hyungu;Lee, Eulrae
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.3
    • /
    • pp.197-207
    • /
    • 2015
  • Modification of travel time is necessary in all Nakdong river basin because hydrological conditions of Nakdong river basin were changed after major rivers project. Also calculation of flood travel time at between sections of weirs is necessary. In this study, flood travel time was calculated using hydraulic model and the latest topographical data from Changnyeong-Haman weir to Nakdong river estuary bank. Analysis of discharge and stage conditions were carried out. 84 of the scenarios were organized according to flow rate, discharge type, boundary conditions, and tributary conditions. Flood travel time of initial and peak were calculated with discharge and stage conditions, respectively. The results of this study will be available in practical business work such as flood forecast warning and weir operation on algae removal.

A Study on Development of Bus Arrival Time Prediction Algorithm by using Travel Time Pattern Recognition (통행시간 패턴인식형 버스도착시간 예측 알고리즘 개발 연구)

  • Chang, Hyunho;Yoon, Byoungjo;Lee, Jinsoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.833-839
    • /
    • 2019
  • Bus Information System (BIS) collects information related to the operation of buses and provides information to users through predictive algorithms. Method of predicting through recent information in same section reflects the traffic situation of the section, but cannot reflect the characteristics of the target line. The method of predicting the historical data at the same time zone is limited in forecasting peak time with high volatility of traffic flow. Therefore, we developed a pattern recognition bus arrival time prediction algorithm which could be overcome previous limitation. This method recognize the traffic pattern of target flow and select the most similar past traffic pattern. The results of this study were compared with the BIS arrival forecast information history of Seoul. RMSE of travel time between estimated and observed was approximately 35 seconds (40 seconds in BIS) at the off-peak time and 40 seconds (60 seconds in BIS) at the peak time. This means that there is data that can represent the current traffic situation in other time zones except for the same past time zone.

A Study of Flood Runoff Variation by Travel Times Estimation Methods (도달시간 산정방법에 따른 홍수유출특성 변화에 관한 연구)

  • Park, Ki-Bum;Ko, Jin-Seuk;Jee, Hong-Gee
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.9 no.1
    • /
    • pp.34-45
    • /
    • 2006
  • In this study comparison estimates travel times with observed travel time. In generally, peak flood discharges decrease become travel times longer. It is closely related to storage constant for the watershed routing of a flood. There are so many empirical formulas available for the estimation of travel time, storage coefficients and lag time but results computed generally show great different depending on individual formulas. When calculated flood discharge depend on the travel times varying the discharge. In this study the Wichun travel time shorter optimization travel time than observed travel time for the rusa and memi. There are showed good results for flood discharges, water level and velocity of the memi at the Younggok.

  • PDF