• Title/Summary/Keyword: parallel construction

Search Result 430, Processing Time 0.027 seconds

A Case Study on the Construction of Concrete Structures in Parallel with Tunnel Blasting (터널발파-구조물 병행시공을 위한 영향평가 연구)

  • 류창하;최병희;김양균;유정훈
    • Explosives and Blasting
    • /
    • v.21 no.4
    • /
    • pp.11-21
    • /
    • 2003
  • An experimental study was carried out in order to reduce the period and cost of construction of Missiryung tunnel, which is a relatively long one 3.6 km long. An allowable vibration level for curing concrete was established based on the extensive case studies done over the world. and assessment was performed on the possibility of constructing concrete structures like lining during tunnel blasting. Attenuation relationships were obtained by processing more than 130 measurement data from a series of tunnel blasting in the site. A Guideline for safe construction work was suggested. To verification, low small concrete blocks with a constant standoff distance were installed in the floor of the tunnel After the blocks were exposed to blast vibrations for 28 days, compressive strength tests were performed on 20 specimens taken from the blocks. It was shown that the suggested guideline was appropriate for the safe construction work at the site.

Efficient Elitist Genetic Algorithm for Resource-Constrained Project Scheduling

  • Kim, Jin-Lee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.235-245
    • /
    • 2007
  • This research study presents the development and application of an Elitist Genetic Algorithm (Elitist GA) for solving the resource-constrained project scheduling problem, which is one of the most challenging problems in construction engineering. Main features of the developed algorithm are that the elitist roulette selection operator is developed to preserve the best individual solution for the next generation so as to obtain the improved solution, and that parallel schedule generation scheme is used to generate a feasible solution to the problem. The experimental results on standard problem sets indicate that the proposed algorithm not only produces reasonably good solutions to the problems over the heuristic method and other GA, but also can find the optimal and/or near optimal solutions for the large-sized problems with multiple resources within a reasonable amount of time that will be applicable to the construction industry. This paper will help researchers and/or practitioners in the construction project scheduling software area with alternative means to find the optimal schedules by utilizing the advantages of the Elitist GA.

Experimental and Numerical Study of Interactions Between Parallel Tunnels (평행근접터널의 상호거동에 대한 실험 및 수치해석적 연구)

  • Kim, Sang-Hwan
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.181-187
    • /
    • 2003
  • This paper describes a study of the influence of shield tunnel construction on the displacements and stresses induced in the linings of existing nearby parallel tunnels. The paper presents a brief review of a set of laboratory scale model research programme investigating the influence of tunnel proximity and alignment, liner stiffness on the nature of the interactions between closely spaced tunnels in clay. A total of two sets of carefully controlled physical model tests were performed. A cylindrical test tank was developed and used to produce clay samples of Speswhite kaolin. In each of the tests, three model tunnels were installed in order to conduct two interaction exts that have been carried out to investigate the interaction problem between parallel tunnels. The results of these tests are compared with the results of finite element analysis to investigate the techniques that must be used to obtain reliable numerical solutions to this type of problem.

Characteristics of Deformation and Shear Strength of Parallel Grading Coarse-grained Materials Using Large Triaxial Test Equipment (대형삼축시험에 의한 상사입도 조립재료의 변형 및 전단강도 특성)

  • Jin, Guang-Ri;Snin, Dong-Hoon;Im, Eun-Sang;Kim, Ki-Young
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.12
    • /
    • pp.57-67
    • /
    • 2009
  • Along with the advanced construction technologies, the maximum size of coarse aggregate used for dam construction ranges from several cm to 1m. Testing the original gradation samples is not only expensive but also causes many technical difficulties. Generally, indoor tests are performed on the samples with the parallel grading method after which the results are applied to the design and interpretation of the actual geotechnical structure. In order to anticipate the exact behavior characteristics for the geotechnical structure, it is necessary to understand the changes in the shear behavior. In this study, the Large Triaxial Test was performed on the parallel grading method samples that were restructured with river bed sand-gravel, with a different maximum size, which is the material that was used to construct Dam B in Korea. And the Stress - Strain characteristics of the parallel grading method samples and the characteristics of the shear strength were compared and analyzed. In the test results, the coarse-grained showed strain softening and expansion behavior of the volume, which became more obvious as the maximum size increased. The internal angle of friction and the shear strength appeared to increase as the maximum size of the parallel grading method sample increased.

Applicability Verification of High-strength Parallel Wire Strands by Tensile Tests (인장 실험을 통한 현수교 주케이블용 고강도 평행선스트랜드의 적용성 검토)

  • Yoo, Hoon;Seo, Ju-Won;Lee, Sung-Hyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6A
    • /
    • pp.435-447
    • /
    • 2011
  • This paper discusses the problems in application of a parallel wire strand with high performance steel wires, which have the tensile strength of 1960 MPa grade, as a major component of the main cables in suspension bridges. Construction methods of main cables in suspension bridges are briefly reviewed by comparing the pros and cons of available methods. Required items for performance and quality of parallel wire strands are described based on the established references. Ultimate tensile strength tests are carried out for seven specimens in order to analyze the behavior of high-performance parallel wire strands. The test results demonstrate that the properties of test specimens are satisfied with performance indexes specified in this paper. The high-performance parallel wire strands are acceptable for application in main cables of suspension bridges.

Development of an Imaging Based Gang Protection System

  • Grimm, M.;Pelz, M.
    • International Journal of Railway
    • /
    • v.1 no.4
    • /
    • pp.149-156
    • /
    • 2008
  • During maintenance or construction works in or at the tracks of railways, high risks for passengers and railway staff, especially for the workers on the construction site exist. The high risks result out of the movement of rail vehicles, like trains or construction vehicles, which must be faced by using any available technical and operational technologies for securing them against the environment. Therefore, it is necessary to evaluate the level of protection continuously and to identify new and innovative methods and technologies for the protection of the gang (construction worker, machines and material). Especially on construction sites at line sections with two or more parallel tracks but also with single tracks, there are still a lot of incidents and accidents mostly with seriously injured persons or fatalities. These were mainly gang members that breach the railway-loading gage. By using proper warning or protection systems, the avoidance of such accidents must be achieved. The latest developments. in gang protection systems concern on the one hand fixed barriers in the middle between the construction site and the operated track and on the other hand construction vehicles equipped with automatic warning systems. The disadvantage of such protection methods is that the gang can be warned against an approaching train but a monitoring of the gang members cannot be performed. Only one part of a potential dangerous situation will be detected. If the gang members will overhear the acoustic warning signal of the security staff and the workers will not leave the danger zone in the track, the driver of the approaching train had no chance to react to the dangerous situation. An accident is often inevitable. While the detection of acoustic warning signals by the gang members working on a construction site is very difficult, the acoustical planning of an automatic warning system has to be designed for an acoustic short range level of one meter besides the construction vehicle. The decision about the use of today's technical warning system (fixed systems, automatic warning systems, etc.) must be geared to the technical feasibility and the level of safety which is needed. Criteria for decision guidance to block a track should be developed by danger estimation and economical variables. To realize the actual jurisdiction and to minimize the hazards of railway operations by the use of construction vehicles near the tracks further developments are needed. This means, that the warning systems have to be enhanced to systems for protection, which monitor the realization of the warning signal as a precondition for giving a movement authority to a train. This method can protect against accidents caused by predictable wrongdoing. The actual state of the art technique of using a collective warning combined with additional security staff is no longer acceptable. Therefore, the Institute of Transportation System of the German Aerospace Center in Braunschweig (Germany) will develop a gang warning and protection system based upon imaging methods, with optical sensors such as video in visible and invisible ranges, radar, laser, and other. The advantage of such a system based on the possibility to monitor both the gang itself and the railway-loading gauge either of the parallel track or of the same track still in use. By monitoring both situations, the system will be able to generate a warning message for the approaching train, that there are obstacles in the track, so that the train can be stopped to prevent an accident. And also the gang workers will be warned, while they breach their area.

  • PDF

Evaluation of Torsional Behaviour for the Catwalk System on A Suspension Bridge by Cross Bridge Interval (크로스 브릿지 간격에 따른 캣워크 시스템의 비틀림 거동 평가)

  • Lee, Ho;Kim, Ho Kyung;Kim, Gi Nam
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.4
    • /
    • pp.371-376
    • /
    • 2015
  • This study was conducted for the torsional behavior of catwalk system which is a temporary structure on a suspension bridge. The torsional deformation of the catwalk structure has a significant effect on the workability and safety of workers during main cable erection. For this reason, the torsional deformation of catwalk is controlled to be acceptable levels below by adjusting the cross bridge interval in design stage. This study analyzed the effect of separation between cross bridge associated with twist safety of catwalk system. For the analytical approach, a detailed analysis model was created including cross bridge. Both wind load within the wind velocity range that allows the construction and eccentric load of Prefabricated Parallel Wire Strand were analyzed by analysis model. Result of study shows that separation between cross bridges has a significant effect on the torsional behavior of the catwalk.

Constructibility Analysis of Self-supported Steel Joint for Automated Construction System (건축물 시공 자동화 시스템을 위한 자립형 철골 접합부의 시공성 분석)

  • Kim, Dong-Keon;Yang, Sung-Woo;Kim, Tae-Hoon;Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.1-4
    • /
    • 2009
  • Construction automation and robotics are being introduced as an efficient alternative to overcome troubles caused by lack of skilled labors. To accomplish effective automated construction system, design for automation(DFA) should be performed in parallel with the development of core technologies such as control and sensing of robots. In Korea, the development of robotic crane-based construction automation(RCA) system is progressing, and the research group has recently developed newly designed steel joint to improve the efficiency of the system. However, performance of the new system should be examined prior to its application on construction sites. Therefore, This study analyzed performance of the new steel frame focused on its constructibility by carrying out mock-up test. As a result, the steel frame satisfied the standards of allowable stress and deflection. It also enables to reduce the time for installation.

  • PDF