• Title/Summary/Keyword: overseas power plant

Search Result 72, Processing Time 0.024 seconds

A Domestic Power Companies' Strategy to Enter Asian Thermal Power Plant Market (국내 발전기업의 아시아 화력발전플랜트 시장 진출전략)

  • Park, Chang-Hyun;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.58-66
    • /
    • 2011
  • The power plant companies reached the culmination for growth in the domestic market. Besides, we have faced many challenges such as an electricity opening market trend for overseas, banning the use of coal due to the United nations framework convention on climate change, and the meticulous attention regarding the government's electricity charge plan. On the other hand, the overseas business has been a critical issue since China and many other developing countries expanded their projects abroad. Another factor is that power plant industry is being privatized, and it made the market regulation a bit loose. Thus, the market environment became favorable toward those companies which planned many overseas businesses. In this research, the power plant company's current condition for construction and operation as well as its technical competitiveness were analyzed, and an alternative plan using SWOT analysis for entering an oversea market was made. It dealt with both internal and external factors. Also, examined was the current situation under the power plant industry dealing with restructure for electric industry, lack of fossil fuel, and the United nations framework convention on climate change. From the research, it was suggested that many successful strategies to enter the overseas business by using the market trend I researched.

  • PDF

Promotion of the Overseas Biomass Plant Business for a Domestic Power Company (국내 발전기업의 해외 바이오매스 플랜트 사업진출 방향)

  • Kim, Yeongsang;Moon, Seungjae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.3
    • /
    • pp.42-47
    • /
    • 2011
  • One of domestic power generation companies, Korea East-West Power Corporation(EWP) had no performance in overseas business just two short years ago. However, EWP has accomplished breakthrough results with the profit of KRW 17.8 billion in 2010, only overseas business part. With overseas power plant growing fast, there is a possibility that EWP may face the limitation of sustainable growth with the current low income structure, which is mainly focused on commissioning and power plant management. Accordingly, this study was made on overseas biomass plant business participation plan through the establishment of joint venture. The characteristics of a joint venture establishment was searched, choosing business partner; the ideas of how to organize a joint venture was drawn, what the role of each partner in joint venture is, and what proper capital share is; and chose business field, considering changing global energy mix, renewable energy market scale, and growth prospects. Considering government policy for renewable energy vitalization and renewable energy market share, We chose the European union as a market to which our business entered.

  • PDF

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob;Kim, Doo-Young;Hwang, Kwang-Won;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.2
    • /
    • pp.119-125
    • /
    • 2017
  • Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.

Risk Classification and Relational Database Schema in Overseas Power Plant Construction (해외 발전플랜트 리스크 분류체계 및 관계형 데이터베이스 구축 방안)

  • Kim, Min;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.192-193
    • /
    • 2014
  • Due to the decreasing domestic construction market since 2007, Korean construction companies are expanding overseas market. As a result, the international market share by Korea has been continuously increased and achieved 65.2 billion dollars in 2013. Despite of such visible results, profitability concerns are constantly arising. It is pointed out that the low-priced bid competition between Korean construction companies and various unpredictable risks are the most crucial factors which aggravate the profitability in the overseas projects. From this point of view, predicting the risks in advance and controling them could be the most important tasks to improve the profitability. This research proposed 202 risk factors with a hierarchy and relational database schema for power plant construction, which is based on the 24 risk classifications in previous research (Kim & Jung 2013). Proposed risk classification and relational database schema could be utilized as the basic data in risk management system.

  • PDF

Management in the EPC Business for Overseas Power Plant Projects (해외 발전플랜트 EPC 사업의 리스크 분석 및 관리방안)

  • Park, Euiseung;Yoo, Hoseon;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.7 no.3
    • /
    • pp.48-64
    • /
    • 2011
  • In this work, risks in EPC project for overseas power plant projects are analyzed and risk management methods are suggested to reduce cost and to shorten time. 79% of risks occurred in the engineering phase for S project located in South-East Asia. The impact scales of risks on major project objectives which are cost, time, scope, and quality are analyzed as 3.5, 3.8, 2.7, and 3.7, respectively. The level of impact scales is very similar to each other except the impact scale of scope. The risk management methods suggested in this study have to be applied at the appropriate time to manage risks effectively. After that, risks are managed continuously by monitoring.

  • PDF

Configuration Management and Domestic and International nuclear power plant trends (형상관리와 국내외 원전 동향)

  • Ko, Min-Hyuck;Lee, Daesung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.10a
    • /
    • pp.351-353
    • /
    • 2022
  • There have been several nuclear accidents at home and abroad so far, and there have been major and small damages. Overseas, in order to reduce such accidents, the safety and reliability of nuclear power plant operations have been improved by introducing a technology called Configuration Management. Through basic information on Configuration Management and successful cases of introducing Configuration Management from overseas nuclear power plants, this paper checks the technical parts applicable to Korea and examines whether they can be newly applied by supplementing them for domestic nuclear power plants.

  • PDF

Application of 275kV XLPE Power Cables for Overseas Protect (275kV XLPE절연 전력케이블의 해외프로젝트 적용)

  • Kwon, B.I.;Seong, J.K.;Han, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07c
    • /
    • pp.1736-1738
    • /
    • 2002
  • Oil-filled power cables and XLPE power cables have been globally applied for extra-high-voltage underground power transmission lines. The application of XLPE cables for the transmission lines have been largely increased at the domestic and overseas projects because of some issues. O.F cables have some week points, related with the issues of the environmental pollution and the needed maintenance work, even though they have been applied for several ten years and their reliability has been proven. Meanwhile, the demands on XLPE power cables increase as their manufacturing technologies have been improved and their simplicity of installations has been focused on. In Korea, for the first time, the 275kV XLPE cable is to be applied at an overseas power plant project. This paper introduces the project profile, the design of the XLPE cable and its accessories, the cable system design and the installation design.

  • PDF

A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System (성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구)

  • Lee, Sang-Hyun;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

The Development of Boiler Fuel Control Algorithm and Distributed Control System for Coal-Fired Power Plant (석탄화력발전소 보일러 연료제어 알고리즘과 분산제어시스템의 개발)

  • Lim, Gun-Pyo;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.62 no.1
    • /
    • pp.36-44
    • /
    • 2013
  • This paper is written for the development and application of boiler fuel control algorithm and distributed control system of coal-fired power plant by the steps of design, coding, simulation test, site installation and site commissioning test. Fuel control algorithm has the upper algorithm and it is boiler master control algorithm that controls the fuel, feed water, air by generation output demand. Generation output demand by power load influences fuel control. Because fuel can not be supplied fast to the furnace of boiler, fuel control algorithm was designed adequately to control the steam temperature and to prevent the explosion of boiler. This control algorithms were coded to the control programs of distributed control systems which were developed domestically for the first time. Simulator for coal-fired power plant was used in the test step. After all of distributed control systems were connected to the simulator, the tests of the actual power plant were performed successfully. The reliability was obtained enough to be installed at the actual power plant and all of distributed control systems had been installed at power plant and all signals were connected mutually. Tests for reliability and safety of plant operation were completed successfully and power plant is being operated commercially. It is expected that the project result will contribute to the safe operation of domestic new and retrofit power plants, the self-reliance of coal-fired power plant control technique and overseas business for power plant.

The Development of Boiler Furnace Pressure Control Algorithm and Distributed Control System for Coal-Fired Power Plant (석탄화력발전소 보일러 노내압력 제어알고리즘과 분산제어시스템의 개발)

  • Lim, Gun-Pyo;Hur, Kwang-Bum;Park, Doo-Yong;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.62 no.3
    • /
    • pp.117-126
    • /
    • 2013
  • This paper is written for the development and application of boiler furnace pressure control algorithm and distributed control system of coal-fired power plant by the steps of design, coding, simulation test, site installation and site commissioning test. The control algorithms were designed in the shape of cascade control for two parts of furnace pressure control and induced draft fan pitch blade by standard function blocks. This control algorithms were coded to the control programs of distributed control systems. The simulator for coal-fired power plant was used in the test step and automatic control, sequence control and emergency stop tests were performed successfully like the tests of the actual power plant. The reliability was obtained enough to be installed at the actual power plant and all of distributed control systems had been installed at power plant and all signals were connected mutually. Tests for reliability and safety of plant operation were completed successfully and power plant is being operated commercially. It is expected that the project result will contribute to the safe operation of domestic new and retrofit power plants, the self-reliance of coal-fired power plant control technique and overseas business for power plant.