The number of domestic e-commerce transactions has been breaking its own record by an annual average growth rate of over 20% based on volume for the past 5 years. Due to the rapid increase in e-commerce market, retail companies that have difficulty meeting consumers in person are in fierce competition to take the lead in the last mile service, which is the only point of contact with customers. Especially in the delivery area, where competition is most intense, the role of the fulfillment center is very important for service differentiation. It must be capable of fast product preparation ordered by consumers in accordance with the delivery service level. This study focuses on the order picking system for rapid order processing in the fulfillment center as an alternative for companies to gain competitive advantage in the e-commerce market. A mixed integer programming model was developed and implemented to optimize the stock replenishment in order picking facilities. The effectiveness was scientifically and objectively verified by simulation using the actual operation process and data.
Objectives:EEG coherence could imply the connectivity between two different areas of the brain, which is known to be important in the pathophysiology of bipolar I disorder(BPD I) and schizophrenia. The authors investigated EEG coherence in patients with BPD I and schizophrenia to examine the connectivity of the neural circuit. Methods:EEGs were recorded in 15 schizophrenia and 14 bipolar disorder patients, and 14 age-matched normal control subjects from 16 electrodes with linked-ear reference. Spectral parameters and coherence were calculated for the alpha bandwidth(8-13Hz) by a multi-channel autoregressive model using 20 artifact-free 2-seconds epochs and the differences were compared among three groups by two different statistical methods;F-test and Kruskal-Wallis test. Furthermore, when there were significant differences among three groups, Scheffe's multiple comparison tests were provided and Jonckheere-Terpstra tests for the ordered alternative were given. Results:In the intra-hemispheric comparison, left frontal coherence was increased in order of control, BPD I and schizophrenia. In the inter-hemispheric comparison, 1) inter-prefrontal coherence in BPD I was signifi- cantly higher than in normal controls, and 2) inter-prefrontal coherence in schizophrenia was significantly lower than in controls. Conclusion:These results suggest that 1) both schizophrenia and BPD I are diseases having the abnormality of neural circuit connectivity in both frontal and prefrontal lobes, and 2) the abnormality is more severe in schizophrenia than in BPD I. Furthermore, the data support that a common pathogenetic process may reside in both schizophrenia and BPD I.
VTIS(Value-added Traffic Information System), among the sub-systems of ATIS, is an Advanced Traffic System which innovates efficiency and safety. And this system, having marketability and publicness, is very important. Moreover, This system offers definite traffic information according to the demand of specified users. And it is expected to produce additional spread effects because of high participation rate of private sector. However, the VTIS service media are varied and there are varied optimal Prices and payment methods according to each medium. Because of that, there needs the study on these problems or optimal criteria. But because existing studies were devoted to estimate the optimal route, the study toward the optimal price which was considered part of user and service use demand do not exist. Accordingly, we surveyed under imaginary alternative pricing scenarios and forecasted the use demand of VTIS by using Binary Logit model. Also, for the users who answered that they would use VTIS service in survey, we classified their use's behaviors as four categories and estimated the use ratio to each category by using Ordered Probit model. Last, using sensitivity analysis for results form above, we derived the optimal price that is 2800won in monthly. 145won in payment per call. Then, VTIS service use rate is respectively 65%, 75%.
Jo, Choong Hyun;Jung, Yong Sik;Kim, Wook Hwan;Cho, Young Shin;Ahn, Jung Hwan;Min, Young Gi;Jung, Yoon Seok;Kim, Sung Hee;Lee, Kug Jong
Journal of Trauma and Injury
/
v.22
no.1
/
pp.77-86
/
2009
Purpose: The appropriate management of traumatic truncal arterial injury is often difficult to determine, particularly if the injury is associated with severe additional truncal lesions. The timing of repair is controversial when patients arrive alive at the hospital. Also, there is an argument about surgery versus stent-graft repair. This study's objective was to evaluate the appropriate method and the timing for treatment in cases of truncal abdominal injury associated with other abdominal lesions. Methods: The medical records at Ajou University Medical Center were reviewed for an 8-year period from January 1, 2001, to December 31, 2008. Twelve consecutive patients, who were diagnosed as having had a traumatic truncal arterial injury, were enrolled in our study. Patients who were dead before arriving at the hospital or were not associated with abdominal organ injury, were excluded. All patients involved were managed by using the ATLS (Advanced Trauma Life Support) guideline. Data on injury site, the timing and treatment method of repair, the overall complications, and the survival rate were collected and analyzed. Results: Every case showed a severe injury of more than 15 point on the ISS (injury severity score) scale. The male-to-female ratio was 9:3, and patients were 41 years old on the average. Sites of associated organ injury were the lung, spleen, bowel, liver, pelvic bone, kidney, heart, vertebra, pancreas, and diaphragm ordered from high frequency to lower frequency. There were 11 cases of surgery, and one case of conservative treatment. Two of the patients died after surgery for truncal organ injury: one from excessive bleeding after surgery and the other from multiple organ failure. Arterial injuries were diagnosed by using computed tomography in every case and 9 patients were treated by using an angiographic stent-graft repair. There were 3 patients whose vessels were normal on admission. Several weeks later, they were diagnosed as having a truncal arterial injury. Conclusion: In stable rupture of the truncal artery, initial conservative management is safe and allows management of the major associated lesions. Stent grafting of the truncal artery is a valuable therapeutic alternative to surgical repair, especially in patients considered to be a high risk for a conventional thoracotomy.
To respond effectively to climate change following the launch of the new climate system, the government is seeking to expand the use of distributed power resources. Among them, the district heating system centered on Combined Heat and Power (CHP) is accepted as the most realistic alternative. On the other hand, the government recently announced the change of energy paradigm focusing on eco-friendly power generation from the base power generation through $8^{th}$ Basic Plan for Long-term Electricity Supply and Demand(BPE). In this study, we analyzed the quantitative effects of profit and loss on the CHP operating business by changing patterns of the heat production, caused by the change of energy paradigm. To do this, the power market long-term simulation was carried out according to the $7^{th}$ and $8^{th}$ BPE respectively, using the commercialized power market integrated analysis program. In addition, the CHP operating model is organized to calculate the power and heat production level for each CHP operation mode by utilizing the operating performance of 830MW class CHP in Seoul metropolitan area. Based on this, the operation optimization is performed for realizing the maximum operating profit and loss during the life-cycle of CHP through the commercialized integrated energy optimization program. As a result, it can be seen that the change of the energy paradigm of the government increased the level of the ordered power supply by Korean Power Exchange(KPX), decreased the cost of the heat production, and increased the operating contribution margin by 90.9 billion won for the 30 years.
At its thirty-second session(Vienna, 17 May-4 June 1999), the UNCITRAL decided that the priority items for the Working Group(Arbitration and Conciliation) should include enforceability of interim measures and the requirement of written (on for the arbitration agreement. The Working Group, at its forty-third session(Vienna, 3-7 October 2005), it had undertaken a detailed review of the text of the revised article 17 of UNCTTRAL Model Law on International Commercial Arbitration, and it had resumed discussions on a draft model legislative provision revising article 7, paragraph (2) of UNCITRAL Model Law. The purpose of this paper is to make research on the contents and issues of the draft legislative provisions on interim measures and preliminary orders, and on the form of arbitration agreement which the Working Group discussed and adopted at its forth-fourth session(New York, 23-27 January 2006). The draft legislative provisions on interim measures and preliminary orders are composed of the following provisions : Article 17-power of arbitral tribunal to order interim measures; article 17 bis-conditions for granting interim measures; article 17 ter-applications for preliminary orders and conditions for granting preliminary orders; article 17 quater-specific regime for preliminary orders; article 17 quinquies- modification, suspension, termination; article 17 sexies-provision of security; article 17 septies-disclosure; article 17 octies-costs and damages; article 17 novies recognition and enforcements; article 17 decies-grounds for refusing recognition or enforcement; article 17 undecies-court-ordered interim measures. There are the following issues in the draft legislative provisions on interim measures and preliminary orders : form of issuance of an interim measures in article 17(2); conditions for granting interim measures in article 17 bis; purpose, function and legal regime of preliminary orders in article 17 ter; obligation of arbitral tribunal to give notice, and non-enforceability of preliminary orders in article 17 quater; burden of proof, interplay between article 17 decies and article 34, and decision on the recognition and enforcement of the interim measures in article 17 decies; placement of article 17 undecies; amendment of scope exception of application in article 1(2). The draft legislative provisions on the form of arbitration agreement are composed of the following provisions : article 7(1) definition of arbitration agreement; article 7(2) arbitration agreement in writing; article 7(3) arbitration agreement if its terms(content) are (is) recorded in any form; article 7(4) arbitration agreement by an electronic communication; article 7(5) arbitration agreement in an exchange of statements of claim and defence; article 7(6) reference to any document containing an arbitration clause. There are the following issues in the draft legislative provisions on the form of arbitration agreement : arbitration agreement in writing in article 7(2); terms or contents of arbitration agreement in article 7(3); arbitration agreement by electronic communication in article 7(4); existence of arbitration agreement in article 7(5); reference to any document containing an arbitration clause in article 7(6); the alternative proposal on article 7; amendment to article 35(2).
There was a new wave in grocery business with development of information and technology, thus a movement from traditional stores to online stores, In order to expand the scale of traditional supermarket and to satisfy the customers' needs, they provide offline and online services simultaneously. This paper is based on the previous studies which had been researched in developed countries from late 1990s to early 2000s and the purpose of this study is to introduce the idea and operation system of e-Grocery business. Moreover, we suggest the alternatives on delivery service methods in order to satisfy the customers' needs through analyzing the current condition of e-Grocers in Korea. According to the result of this study, Korean e-Grocers offer only attended home delivery services. In our opinion, Korean supermarkets have to take hybrid model which Tesco.com is using. There are some alternatives to increase the profits of Korean e-Grocers and to provide better services to their customers as follows: As an alternatives for delivery services, picking service is the easiest and cheapest way to apply for supermarkets. This is very useful for working women and also it is possible to order by smartphone recently. They can order the goods to the closest local supermarkets from working place, and then they pick them up on the way home from working off. In order to improve the quality of delivery services, to use the reception box will be the way to provide better services to the customers. The reception box is a way to protect the quality of goods such as fresh-cut product, which require the freshness through the temperature adjustment, and also to keep the safety of ordered goods through locking system Through this system, supermarkets are able to use attended or unattended services under the customers' satisfaction. However, using the reception box is expensive, so shared reception box will be an alternative. As an alternative for development of e-Grocery business, the advertisement for e-Grocery business has to be supported in order to attract potential customers in e-Grocery business. Furthermore, the main concerns of e-Grocery business such as the sanitation and safety of goods, and convenience must be guaranteed in order to keep the loyal customers and to attract new customers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.