• Title/Summary/Keyword: operational quantity

Search Result 105, Processing Time 0.025 seconds

Optimal Ballasting in the Preliminary Ship Design Stage (초기설계 단계에서의 최적 발라스트 용량에 관한 연구)

  • Gang, Won-Su
    • 한국기계연구소 소보
    • /
    • s.15
    • /
    • pp.117-125
    • /
    • 1985
  • It is usual practice to ballast a sip to maintain requires operational safety at sea. However, excessive ballasting may reduce the operational economy of a ship. Therefore, The determination of the optimal location and quantity of ballast water is one of the important works at the preliminary design stage. To provide a convenient tool to ship designers the program for the determination of the optimal location and program the effect of the change of ballast water quantity in each tank on some characteristics of a ship, such as trim, initial stability and heel, is investigated and the minimum quantity of ballast water for each tank which satisfies the operational safety requirements is calculated.

  • PDF

The Study on analysis methodology of optimal performance and quantity for Mission-Based drones (임무 기반 드론의 최적성능 및 소요량 분석 방법론 연구)

  • Ha, Young-Seok
    • Journal of Internet Computing and Services
    • /
    • v.21 no.1
    • /
    • pp.231-236
    • /
    • 2020
  • This paper addresses the analysis method about optimal performance and required quantity for Mission-Based drones. In the case of drones, although scientific verification of operational performance and quantity of demanded, such as total flight time, total operation time, and appropriate required quantity, is required depending on the operation concept, there is no methodology for analyzing them systematically. That is the reason this research was carried out. Through the suggestion and study about Mission-Based six step analysis method and, this study can present the optimal ROC (Required Operational Capability) and the required quantity based on the operational concept of drones, and technical and economic effects were suggested.

The Optimal Inventory Level of the Maintenance Float to Achieve a Target Operational Availability of Korean-Made Helicopter (한국형 헬기의 목표 운용가용도 달성을 위한 정비대충장비 최적 재고수준 결정)

  • Lee, Sang-Jin;Kim, Seong-Won
    • Korean Management Science Review
    • /
    • v.24 no.2
    • /
    • pp.81-93
    • /
    • 2007
  • Achieving a target operational availability is more economical and efficient than having many quantities of the weapon system, since the cost of weapon system becomes expensive. The intent of this study is twofold; first, we develop the simulation model to determine the optimal inventory level of the maintenance float while achieving a target operational availability of the Korean-made helicopter. The quantity decision model considers following factors such as a reliability. a turn around time(TAT). a protection level for inventory, and so on. Second, we analyze whether the existence of a lateral transshipment among bases and the reduction of TAT relate to an inventory level and the operational availability. The research result shows that both TAT and lateral transshipment have an effect on reducing the inventory level of the maintenance float and improving an operational availability.

Provisioning Quantity Determination of Consumable Concurrent Spare Part Under Availability Constraint and Cannibalization Allowed (운용가용도 제약하에서 동류전용이 허용될 때 소모성 동시조달부품의 적정구매량 결정)

  • Oh, Geun-Tae;Na, Yoon-Kyoon;Kim, Myung-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.199-207
    • /
    • 2010
  • In this paper considered is the provisioning quantity determination problem of consumable concurrent spare parts (CSP) of a new equipment system to minimize the procurement cost under the operational availability constraint. When a part fails, repair of the failed part is impossible and the part is replaced and cannibalization is allowed. The failure of a part is assumed to follow a Poisson process and the operational availability in CSP is defined. The solution procedure consists of two parts. Firstly, a heuristic algorithm is developed under the assumption that the failure rate is constant during the CSP period. Secondly, proposed is a simulation search procedure which improves the heuristic solution to the near optimal solution in a reasonable amount of time. An illustrative example is shown to explain the solution procedure.

Optimal Provisioning Quantity Determination of Consumable Concurrent Spare Part under the Availability Limitation (운용가용도 제약하에서의 소모성 동시조달부품의 최적구매량 결정)

  • 오근태;김명수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.113-122
    • /
    • 1998
  • In this paper we consider the CSP requirements determination problem of new equipment(machine) system. For the newly procured equipment systems, mathematical analyses are made for the system which is constructed with the consumable parts to derive the associated CSP requirement determination model in mathematical expression. Based on these analyses, a mathematical model is derived for making an optimal CSP requirement determination subject to tile constraint of satisfying any given operational availability limitation. We assume that the failure of a part follows a Poisson process. Firstly, the operational availability concept in CSP is defined and the relation between the general system availability and the operational availability is established. Secondly, the problem is formulated as the cost minimization problem that should satisfy the operational availability limitation, and then, using the generalized Lagrange multipliers method, the optimal solution procedure is derived.

  • PDF

An Operational Strategy for Inventory Control of Networked Regional Distribution Centers (지역통합 네트워크관리하의 재고통제 운용전략에 관한 연구)

  • Kim, Byeong-Chan;Choi, Jin-Yeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.3
    • /
    • pp.110-116
    • /
    • 2008
  • Operational strategy for inventory control in the distribution system has been given attention. If an individual enterprise implements the strategy, it is not easy to gain scale merits because of limited quantity or burden of inventory. In this study, we propose an operational strategy for inventory control that considers managerial integration of regional distribution centers (RDCs) and present a model of it. In a network of several RDCs, they could share inventory information and supply parts for others in case of an inventory shortage. And a numerical example of the network is illustrated, which compares two operational strategies, integration management of RDCs and individual management of them. The result shows total cost reduction in the strategy of integration management through the efficient inventory control of multi-echelon distribution.

Optimal Provisioning Quantity Determination of Concurrent Spare Parts including Consumable Items and Repairable Items under the Availability Limitation (운용가용도 제약하에서 소모성부품과 수리순환부품이 혼재된 동시조달부품의 최적구매량 결정)

  • 오근태;김명수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.59
    • /
    • pp.53-67
    • /
    • 2000
  • In this paper we consider the CSP requirements determination problem of new equipment(machine) system. For the newly procured equipment systems, mathematical analyses are made for the system which is constructed with the consumable parts and the repairable parts to derive the associated CSP requirement determination model in mathematical expression. Based on these analyses, a mathematical model Is derived for making an optimal CSP requirement determination subject to the constraint of satisfying any given operational availability limitation. We assume that the failure of a part follows a Poisson process and the repair time has an exponential distribution. Firstly, the operational availability concept in CSP is defined and the relation between the general system availability and the operational availability is established. Secondly, the problem is formulated as the cost minimization problem that should satisfy the operational availability limitation, and then, using the generalized Lagrange multipliers method, the optimal solution procedure Is derived.

  • PDF

Optimal Provisioning Quantity Determination of Concurrent Spare Part under the Funds Limitation (자금 제약하에서의 동시조달부품의 최적 구매량 결정)

  • 오근태
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.41
    • /
    • pp.123-134
    • /
    • 1997
  • In this paper we consider the CSP requirements determination problem of new equipment system. The CSP we deal with in the paper are restricted to the demand-based spare parts. For the newly procured equipment systems, mathematical analyses are made for the system which is constructed with the repairable items to derive the associated CSP requirement determination model in mathematical expression, respectively. Based on these analyses, a mathematical model is derived for making an optimal CSP requirement determination subject to the constraint of satisfying any given funds limitation. We assume that the failure of a part follows a Poisson process. Firstly, the operational availability concept in CSP is defined and the relation between the general system availability and the operational availability is established. Secondly, the problem is formulated as the operational availability maximization problem that should satisfy the funds limitation, and then, using the generalized Lagrange multipliers method, the optimal solution procedure is derived.

  • PDF

Provisioning Quantity Determination of Consumable Concurrent Spare Part with Objective Availability Limitation under Cannibalization Allowed (부품재활용이 허용될 때 목표운용가용도 조건을 갖는 소모성 동시조달부품의 구매량 결정)

  • Oh, Geun-Tae;Kim, Myeong-Su
    • Journal of Applied Reliability
    • /
    • v.4 no.2
    • /
    • pp.91-104
    • /
    • 2004
  • In this paper we consider the concurrent spare part(CSP) requirements problem of new equipment system. When a part fails, the part is replaced and the repair of failed part is impossible and cannibalization is allowed. We assume that the failure of a part knows a Poisson process. The operational availability concept in CSP is defined, and derive a formula to calculate the operational availability using expected machine operating time during CSP period. A mathematical model is derived for making an CSP requirement determination subject to the constraint of satisfying any given operational availability limitation and an heuristic solution search procedure is derived. An illustrative example is shown to explain the solution procedure.

  • PDF

Provisioning Quantity Determination of Consumable Concurrent Spare Part under Cannibalization Allowed (부품재활용이 허용될 때 소모성 동시조달부품의 적정구매량 결정)

  • Oh Geun-Tae;Na Yoon-Kyoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.1
    • /
    • pp.97-104
    • /
    • 2005
  • Considered is the concurrent spare part(CSP) requirements problem of new equipment system. In the considered system, when a part fails, the part cannot be repaired and should be replaced. In addition, cannibalization is allowed. It is assumed that the failure of a part follows a Poisson process. The operational availability concept in CSP is defined, and a formula is derived to calculate the operational availability using expected machine operating time during CSP period. The problem is formulated as the operational availability maximization problem with available budget constraint and a heuristic solution search procedure is developed. An illustrative example is shown to explain the solution procedure.