직접 PC슬래브설치를 통한 철도지하횡단 공법의 적용 연구 (Railway Underground Crossing Method Using PC Slab)

  • 민경주;이방우;박병룡
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2439-2449
    • /
    • 2011
  • Existing grade crossings between railway and roadway area gradually changed to grade separation systems by the law. In the case of new roadway construction which crosses railways, it shall be grade separation system in principle. With the railway underground crossing method, many practices have been developed which can minimize rail displacements and avoid rail release. With these methods, the effects to the train can be reduced. The underground crossing methods can be identified as open-cut methods and non open-cut methods. The open-cut methods include temporary support methods and special rail construction methods. Also the non open-cut methods includes pipe roof methods, front jacking methods, messer shield methods, NTR methods and JES methods. Among these, the most suitable method is applied considering safety, economy, class of each rail system (train passing frequency and velocity), etc. In the non open-cut methods, the cost and duration shall be increased to keep existing rail system during construction. In the open-cut methods which use plate girders, the rail speed shall be restricted due to the displacement and vibration of the girder. In this study new grade separation methods were developed. With this method, the safety during construction can be increased. This method refines temporary support methods, but pc slab girder with huge stiffness is applied instead of plate girders. With this method, the rail displacement can be reduced and higher safety can be obtained during construction. Also construction cost and duration can be minimized because the temporary work and the overburden soil depth can be reduced.

  • PDF

Experimental study to determine the optimal tensile force of non-open cut tunnels using concrete modular roof method

  • Jung, Hyuk-Sang;Kim, Jin-Hwan;Yoon, Hwan-Hee;Sagong, Myung;Lee, Hyoung-Hoon
    • Geomechanics and Engineering
    • /
    • 제29권3호
    • /
    • pp.229-236
    • /
    • 2022
  • In this study, a model experiment and field experiment was conducted to introduce the optimal tensile force when constructing a non-open cut tunnel according to the ground conditions of sandy soil. CMR (Concrete Modular Roof) method is economical because of the high precision and excellent durability, and corrosion resistance, and the inserted parts can be used as the main structure of a tunnel. In addition the CMR method has a stable advantage in interconnection because the concrete beam is press-fitted compared to the NTR (New Tubular Roof) method, and the need for quality control can be minimized. The ground conditions were corrected by adjusting the relative density of sandy soil during the construction of non-open cut tunnels, and after introducing various tensile forces, the surface settlement according to excavation was measured, and the optimal tensile force was derived. As a result of the experiment, the amount of settlement according to the relative density was found to be minor. Furthermore, analysis of each tensile force based on loose ground conditions resulted in an average decrease of approximately 22% in maximum settlement when the force was increased by 0.8 kN per segment. Considering these results, it is indicated that more than 2.0 kN tensile force per segment is recommended for settlement of the upper ground.

강관압입후 슬롯 홀을 갖는 비개착 터널공법의 현장적용에 관한 연구 (A Study on Sites Application of Non-open-cut Tunnel Method with Slot Holes in Steel Pipe Pumping)

  • 채영석;송관권;민인기
    • 한국안전학회지
    • /
    • 제30권1호
    • /
    • pp.47-51
    • /
    • 2015
  • In the study, a new non-open cut tunnel steel pipe method using slot hole has been developed. As is overcomes shortcomings of conventional methods, it is applied to the field. The main concept of the new method is the steel pipe pumping system with slot holes which, by means of formation slot holes between each steel pipe, applied to the magnitude of the relaxed earth pressure caused by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through several ways as numerical analysis and site test. The new method was applied to the construction of a 11.5m wide, 7.4m high and 50m long section that passes side subway and large buildings in inner city. By applying the new method, tunnel construction was successfully completed in 6 months. It decreases the construction period to 30% compared to that of conventional methods, and ground was almost negligible.

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • 제32권1호
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.

공사에 따른 광장형 교차로의 교통운영방안 (Proposing New Traffic Operation Method at the Large Intersection Under Consturction)

  • 박용진;김종식
    • 대한교통학회지
    • /
    • 제21권6호
    • /
    • pp.57-65
    • /
    • 2003
  • 본 연구는 지하철 역사 공사가 이루어지는 교통량이 많은 광장형 교차로에서의 공사중 처리 방안을 제시하는 것으로 대부분의 지하철 역사는 혼잡한 교차로에서 위치하게 되어 기존의 복공식 교통처리방안으로 할 경우에는 공사로 인한 차선감소와 차선변경으로 인한 차량지체나 사고의 위험성이 많으며 공사가 단계별로 이루어지기 때문에 공사기간도 길어지고 공사비용도 많이 소요된다. 따라서, 본 연구에서는 충분한 공사 작업공간의 확보와 원활한 교통소통을 제공하기 위하여 현대식 로터리에 신호운영을 도입한 방식(SMR)을 사례지점인 두류네거리에 적용하여 기존의 복공식 교통처리방안과 SMR방식에 대한 효율성을 비교${\cdot}$분석하였다. 신호로 운영되는 현대식 로터리(SMR)의 도입은 공사중 교통처리방안이 기존 복공식 교통처리방식과 대등한 교통처리 효과를 나타낼 수 있으면서, 공사를 위한 공간확보 및 공사비, 공사기간 절감 효과를 기대할 수 있는 교통처리방안이다. 본 연구에서 제시된 SMR방식은 기존의 교통처리방식의 문제점인 공사기간과 공사 작업공간 협소, 교통혼잡, 교통소통을 증진시키는 새로운 운영방식으로서 향후 광장형 교차로에서 지하철공사 뿐만 아니라 공사시 교통처리 방안으로서 광범위하게 적용될 수 있다.

세미 오픈컷 역타공법의 현장적용에 관한 연구 (Study on the Application of Semi-open cut Top-Down Construction for Framework)

  • 소광호
    • 한국공간구조학회논문집
    • /
    • 제11권2호
    • /
    • pp.129-138
    • /
    • 2011
  • 지하공사는 상부층의 구조물과 연계된 시공순서에 따라 Bottom-Up공법, Up-Up공법 그리고 Top-Down 공법으로 대별할 수 있다. 탑다운 공법을 사용하면 건물의 본구조를 흙막이지보공으로 이용하면서 상층에서 하층으로 굴착과 구체구축을 반복하여 시공함으로써 인접구조물이나 주변 지반의 변위를 극소화 시킬 수 있다. 이는 토류벽의 안정성이 높으며, 각층의 바닥슬래브를 작업공간으로 사용하여 도심지 공사에서 작업장 확보가 용이하다. 그러나 굴토작업이 슬래브 하부에서 진행되므로 작업 능률 및 작업환경이 저하되고, 어스앵커 공법보다 경제성이 없다는 이유로 다소 회피하는 경우가 종종있다. 따라서 본 논문에서는 터파기 공사는 세미오픈컷 공법을 적용하고 흙막이 공법에는 지하연속벽(슬러리월)을 그리고 지보공으로는 C.W.S공법을 적용한 역타공법으로 대상현장을 중심으로 기존 역타공법과 경제성, 공사기간 및 작업성 등을 분석 제시하였다. 토사운반 및 철골설치공사 작업의 용이성과 PRD 공사의 정밀도 향상 등의 품질관리가 우수하며, 공기단축이 가능하였다.

지하철 선로부 토피 8m의 경우 NATM공법설계를 개착공법으로 대체한 실례 (1. NATM design changed into open type excavation on the 8 meter overburden of subway construction.)

  • 허진
    • 화약ㆍ발파
    • /
    • 제10권2호
    • /
    • pp.3-7
    • /
    • 1992
  • Concerning to Taeku city subway construction project(1-4 site), the original design was adapted NATM Tunnel method to the 8 meter thickness of overburden. Surveyor checked sity and design material and finally decided to change into Open Cut method because overburden is not only below 1 1/2 times thickness of comparate Tunnel width but there is no traffic conjunction in job site.

  • PDF

서울 지하철공사 발파공법의 표준화 (Blasting Standardization works for NATM on the Seoul Subway Construction by Dr, Ginn Huh)

  • 허진
    • 기술사
    • /
    • 제16권3호
    • /
    • pp.5-23
    • /
    • 1983
  • On the Seoul Metropolitan Subway Construction of No. 3, 4 Line, the total length is 57 Km and it is now undergoing almost 55% progress. The working method is classified into Open Cut of 70% and the rest of 30% tunnelling method in the 48 job site. Above tunnelling method is execute by American Steel Support System and the rest of 10 job site carried out by New Austria Tunnelling Method. This paper describes Blasting Standardizations works on the above Tunnelling ' Open Cut Method under big slogan, first safety, second execution. As a superintendent, I strived standardization of works with Better powder, Better Drills ' Better Pattern. Geological structure of Seoul area is composed by Jurassic Granite and also the above rockgroup are over burden by Alluviums as a Unconformity. First of all, I carried out the standard amount of powder and burden through experimental standard blasting by each powder as following Blasting works in the subway construction is surrounding shop Building, under pass the city river and also under pass highest building basement floor. I made allowable Blasting Vibration Value by West-Germany Vornorm DIN 4150, Teil 3 and should measure each blasting works as fellows all of powder is used basically Low-Gravity and Low Velocity such as Slurry, Ammonium Nitrate ' Finex I, II. for Smooth Blasting Instead of Gelatin Dynamite. Electric Detonation Cap is used basically M/S Delay Cup instead of Electric delay ' Simultaneous cap. I applied following formula V=KW3/4 $D^{-2}$ V=Particle Velocity (Cm/sec) K=Ginh Huh's Value W=Delay Charge (Kg) D=Distance(m) In the Open Cut, within 1m distance from H-pile I made to use the Concrete breaker, as following V=7W/$^{0.5}$V/$^{-1.75}$ On the Concentrate Building area, I advise to use Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.e Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.

  • PDF

서울지하철 터널의 T.R.c.M. 공법 적용 사례 연구 (An application of the tubular roof construction method for Seoul subway tunnel construction)

  • 지홍근;유광호;박연준
    • 한국터널지하공간학회 논문집
    • /
    • 제6권4호
    • /
    • pp.345-356
    • /
    • 2004
  • 지하구조물을 축조하는 공법으로 기존에 가장 많이 사용해 온 것이 개착식 공법이나, 지상교통 흐름을 방해하고 공사소음 및 주변 지반의 침하로 인한 민원 발생 등 많은 문제점을 야기해 왔다. 많은 경우에 있어 지중에 매설된 상수도관 하수도관 도시가스관 고압 전력구 통신 케이블 등 지중 매설물의 위치가 정확하게 파악되지 않아서 안전한 시공에 어려움이 크고, 개착공사 시 지하지장물의 이설로 인한 공지지연 및 추가공사비가 소요될 것으로 판단되다. 따라서 본 논문에서는 기존 지하구조물 축조공법을 개선하여 슬래브강관과 PC벽체 트렌치를 이용한 터널축조공법 (T.R.c.M.)을 서울지하철 현장에 적용한 시공사례를 소개하고자 한다. 연구결과, T.R.c.M.공법은 진동과 소음을 최소화하여 주변환경과 교통의 흐름에 전혀 지장을 주지 않고 안정적으로 터널을 축조할 수 있는 공법임을 알 수 있었다.

  • PDF

석회석광산에서 노천채굴에 따른 광해 발생을 감소시키기 위한 대책 (Measures to Reduce Mine Hazards Caused by Open- cut Mining of Limestone Mines)

  • 원연호;안진만
    • 화약ㆍ발파
    • /
    • 제24권2호
    • /
    • pp.75-82
    • /
    • 2006
  • 우리나라 석회석 광산 대부분은 광상의 부존조건, 채광실수율, 안전조업, 경제성 등을 고려하여 노천채굴 방식을 채택하고 있으나, 광산개발 과정에 따른 진입로 확보, 발파 및 장비굴착, 암석의 파쇄 및 분쇄, 운반, 선광 등으로 인한 먼지의 날림, 소음, 진동, 폐석사면 붕괴에 의한 농경지 훼손 등의 광해를 발생시켜 환경적인 문제를 유발시키고 있다. 본 연구에서는 석회석 노천채굴 작업에 따른 주변의 환경피해 최소화와 광해에 따른 경제적 손실을 감소시키기 위해 현장 시공과정에서 체험하였던 광해저감 방법들을 제시하였다.