This study proposed the new method of discerning the assembled parts and presuming the position of central point in a Cowl Cross Bar (CCB) using a Charge-Couple Device (CCD) camera attached to a robot in the auto assembly line. Three control points of an ellipse were decided by three reference points, which were equally distanced. The radii of these reference points were determined by the size of the object, and the repeated presumption secured the precise determination. The comparison of the central point of ellipse presumed by Randomized Hough Transform (RHT) with the part information stored in a database was used for determining the faulty part in an assembly. The method proposed in this study was applied for the real-time inspection of elliptical parts, such as bolt, nut hole and so on, connected to a CCB using a CCD camera. The findings of this study showed that the precise decision on whether the parts are inferior or not can be made irrespective of the lighting condition of industrial site and the noises of the surface of the part. In addition, the defect decision on the individual elliptic parts assembled in a CCB showed more than 98% accuracy within a 500-millisecond period at most.
Journal of Korean Association for Spatial Structures
/
v.18
no.1
/
pp.67-75
/
2018
Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.
For the past decade, South Korea had experienced catastrophic building fires, which resulted in consider-ably high number of casualties. This motivated research to develop fire-safe wall assemblies. In this study Fire Risk Analysis (FRA) is conducted as part of the project designing phase to ensure fire safety of the final product. Traditional approach was to consider fire performance at the end of the designing stage, when PASS/FAIL fire test results are required to be submitted to the Authority Having Jurisdiction (AHJ). By applying a fire risk analysis to guide the designing phase, overall fire safety of a wall assembly can be achieved more systematically as conducting FRA allows designers to clearly identify elements that are more vulnerable to fire and simply replace them with other practical options. Severity of fire risk is determined by considering the fire hazards of a wall assembly such as the exterior layer, insulation, vertical connectivity, and external ignition sources (e.g., photovoltaic panels). Frequency of fire risk is assessed based on the factors affecting fire likelihood, which are air cavity and fire-stopping applied in the design, and random design changes occurring during on-site construction. Fire risk matrix is proposed based on these fire risk factors and efforts to reduce the fire risk level associated with the wall assembly are given by systematically assessing the fire risk factors identified from fire risk analysis. Current study demonstrates how fire risk analysis can be applied to develop fire-safe walls by reducing the relevant fire risks- both severity and frequency.
Korean Journal of Construction Engineering and Management
/
v.22
no.1
/
pp.13-26
/
2021
To promote the off-site construction (OSC) in Korea, technical innovation applied to each phase, such as design, engineering, factory production, and site assembly, is important and equally necessary is the development of management and operation methods that are different from existing construction production methods. However, the current OSC-related studies in Korea are conducted from the technical development viewpoints, such as construction methods. Additionally, few studies have been conducted to derive a management measure for successful OSC projects. Therefore, studies to derive a management measure based on a clear understanding of the core success factors of OSC projects are required. This study aims to analyze several studies related to the success factors of OSC projects conducted overseas and to show its core implications for the successful management of OSC projects in Korea. We expect this study to improve the viability of OSC projects, which will be expanded in Korea in the future.
Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
Land and Housing Review
/
v.10
no.3
/
pp.77-87
/
2019
In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.253-254
/
2023
The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.
The present annexed parking lot standards for buildings in Parking Act are categorized in 9 groups in terms of recreation, culture and assembly, housing, factory, and so on, in which same grouped facilities have uniform parking standards. The local governments have authority to itemize groups and adjust parking standards within ${\pm}50%$ ranges. These days diversity in building types and functions need more fractionated parking standards; however, most local governments focusing merely on applying strengthened parking standards in general without systematic rules of consistency. The current problem of parking standards being used is lack of regarding facility characteristics; expecially, a large sized high-tech manufacturing facility located in industrial site is still applied by same parking standards as normal manufacturing facility, even though most part of manufacturing process is automated and hence less manpower is employed. This paper presents a systematic method of analyzing parking generation unit for factory facilities in industrial site in terms of facility use and scale characteristics.
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.1D
/
pp.37-44
/
2010
The present annexed parking lot standards for buildings in Parking Act are categorized in 9 groups with 13 parking standards in terms of recreation, culture and assembly, housing, factory, warehouse, and so on, in which same grouped facilities have same parking standards. These days diversity in building types and functions need more fractionated parking standards; however, most local governments focusing merely on applying strengthened parking standards in general without systematic rules of consistency. The current problem of parking standards being used is lack of regarding facility characteristics; expecially, a large sized high-tech manufacturing facility located in industrial site is still applied by same parking standards as normal manufacturing facility, even though most part of manufacturing process is automated and hence less manpower is employed. This paper presents a parking generation forecasting model for factory facilities in industrial site in terms of facility use and scale characteristics.
Korean Journal of Construction Engineering and Management
/
v.22
no.6
/
pp.96-106
/
2021
The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.
International conference on construction engineering and project management
/
2017.10a
/
pp.192-200
/
2017
With the acceleration of construction industrialization, the buildings that China has adopted the construction of industrialization technology are increasing day by day, and Precast Concrete (PC) Structure technology is one of the main technologies of construction industrialization. Compared with the traditional cast-in-place concrete structure, PC structure is more conducive to shorten the construction period, reduce the number of construction workers and the site construction waste. Nevertheless, PC structure improves the requirements of hoisting machinery in the construction site, and the lay-out and selection of hoisting machinery become an important factor influencing the construction cost. The paper regards the typical tower crane in China as the research object, and establishes the time optimization model for the lifting scheme. The influence of the different precast rate on the selection of the tower crane is analyzed. This paper obtains the time variation of the tower crane under different precast rate, provides a theoretical basis for the design of precast concrete structures under the influence of assembly construction, and lays the foundation for the selection of tower crane under the precast rate.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.