• Title/Summary/Keyword: offshore pipelines

Search Result 74, Processing Time 0.021 seconds

Research on the Analysis Method of Thermal Buckling of Subsea Pipeline Structures (해저 파이프라인 열좌굴 해석방법에 관한 연구)

  • Yang, Seung-Ho;Jung, Jong-Jin;Lee, Woo-Sub;Do, Chang-Ho
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.47 no.2
    • /
    • pp.225-232
    • /
    • 2010
  • The requirement of design of High-Pressure/High-Temperature(HP/HT) pipelines on an seabed increases in recent years. The need of research on the analysis method to improve the design capacity is increasing. The purpose of this study is the development of the analysis method of thermal buckling of subsea pipeline structures. The analysis method of thermal buckling was established by using the commercial FEM code(ABAQUS) which shows the outstanding performance in non-linear static FE analysis. The developed method has been applied to the installation of subsea pipeline on the offshore project. For a validation, the comparative study has been carried out. This application to offshore project demonstrates the superiority of the analysis method of thermal buckling of subsea pipeline structures and testifies the application to detail design.

A Parametric Study on Ice Scouring Mechanism for Determination of Pipeline Burial Depths

  • Park, Kyung-Sik;Lee, Jong-Ho
    • Journal of Ship and Ocean Technology
    • /
    • v.8 no.2
    • /
    • pp.29-40
    • /
    • 2004
  • Interaction of grounded ice ridges with underlying seabed is one of the major considerations in the design of Arctic pipeline system. Previously several ice scour models were developed by researchers to describe the ice scour-seabed interaction mechanism. In this paper, a parametric study on ice scouring mechanism is performed and the limitation of ice scour-seabed interaction models is discussed. Simple laboratory tests are carried out and then the shape pattern of deposited soil around the ice is redefined. New ice scour model assumes trapezoidal cross section based on the field observation data. Ice scour depth and soil resistance forces on seabed are calculated with varying the keel angle of a model ice ridge.

A Comparative Study of Ice Scour-Seabed Interaction Models (빙쇄굴-해저지반 상호작용 모델 비교연구)

  • 최경식;이종호
    • Journal of Ocean Engineering and Technology
    • /
    • v.16 no.1
    • /
    • pp.27-35
    • /
    • 2002
  • The interaction of grounded ice ridges with underlying seabed is one of the major considerations in the design of Arctic pipeline system. Previously several ice scour models were developed by researchers to describe the ice scour-seabed interaction mechanism. In view of possible improvements, a comparative study of those ice scour models is performed and their limitation in modeling is discussed. Simple laboratory tests are carried out and then the shape pattern of deposited soil around the ice model is newly defined. Unlike the rectangular idealization of an ice block, in this modified ice scour model, trapezoidal cross sections are assumed to represent the typical shape of an ice ridge based on the field observation data. With the horizontal and vertical motion of ice model, the ice scour depth and soil reacting forces on seabed are calculated with varying the keel angle of an ice ridge.

Review on Oil Spills and Their Effects

  • Lee, Hwa-Woon-;Nobuhisa-Kabayashi;Ryu, Cheong-Ro
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 1991.07a
    • /
    • pp.47-50
    • /
    • 1991
  • With increasing offshore oil exploration, drilling, and production activities, and with a huge amount of petroleum being transported by tankers and pipelines through the ocean and coastal environment and resoures has been realized among government decision makers, oil industry personnel, and the general public. Assessment must be made of the potential risk of damage resulting from the exploration, development and transportation activities, based on predictive impact evaluations of the fate of hypothetical or real oil spills.(omitted)

  • PDF

Experimental study on vortex induced vibration of risers with fairing considering wake interference

  • Lou, Min;Wu, Wu-gang;Chen, Peng
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.2
    • /
    • pp.127-134
    • /
    • 2017
  • Vortex Induced Vibration (VIV) is a typical flow-structure interference phenomenon which causes an unsteady flow pattern due to vortex shedding at or near the structure's natural frequency leading to resonant vibrations. VIV may cause premature fatigue failure of marine risers and pipelines. A test model was carried out to investigate the role of a stationary fairing by varying the caudal horn angle to suppress riser VIV taking into account the effect of wake interference. The test results show significant reduction of VIV for risers disposed in tandem and side-by-side. In general, fairing with a caudal horn of $45^{\circ}$ and $60^{\circ}$ are efficient in quelling VIV in risers. The results also reveal fairing can reduce the drag load of risers arranged side-by-side. For the tandem configuration, a fairing can reduce the drag load of an upstream riser, but will enlarge the drag force of the downstream riser.

Application of dual offshore pipelines in curved route (곡선구간의 복합 해저관로 적용 사례)

  • Jo, Chul-H.;Kim, Jae-W.
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.129-133
    • /
    • 2002
  • 곡선 구간에 복합 해저관로를 설치하기 위해서는 한 개의 관로를 설치하는데 필요한 설계 및 장치보다 더 많은 상황들을 고려해야 한다. 본 논문은 두 개의 복합 해저관로를 설치하는데 필요한 각종 설치 설계 및 장치 설계를 비롯하여 개발된 특수 장치들을 소개한다. 두 개의 해저관로의 외경은 30 inch, 두께는 17.5 mm, 콘크리트 코팅은 70mm이고 3.007km의 노선 중 약 1km가 곡선 구간이다. 최대 수심은 34m이고 약 7.5m의 조수간만의 차를 갖고 있는 지역이다. 해저 곡선구간에는 18개의 해저 가이드 파일을 설치하여 곡선부에서 요구되는 반경을 확보하였다.

  • PDF

Development of Third-Party Damage Monitoring System for Natural Gas Pipeline

  • Shin, Seung-Mok;Suh, Jin-Ho;Im, Jae-Sung;Kim, Sang-Bong;Yoo, Hui-Ryong
    • Journal of Mechanical Science and Technology
    • /
    • v.17 no.10
    • /
    • pp.1423-1430
    • /
    • 2003
  • In this paper, we develop a real time monitoring system to detect third-party damage on natural gas pipeline. When the damage due to third-party incidents causes an immediate rupture, the developed on-line monitoring system can help reducing the sequences of event at once. Moreover, since many third-party incidents cause damage that does not lead to immediate rupture but can grow with time, the developed on-line monitoring system can execute a significant role in reducing many third-party damage incidents. Also, when the damage is given at a point on natural gas pipeline, the acoustic wave is propagated very fast about 421.3 m/s. Therefore, the data processing time should be very short in order to detect precisely the impact position. Generally, the pipeline is laid under ground or sea and the length is very long. So a wireless data communication method is recommendable and the sensing positions are limited by laid circumstance and setting cost of sensors. The calculation and monitoring software is developed by an algorithm using the propagation speed of acoustic wave and data base system based on wireless communication and DSP systems. The developed monitoring system is examined by field testing at Balan pilot plant, KOGAS being done in order to demonstrate its validity through reactive detection of third-party contact with pipelines. Furthermore, the development system was set at the practical pipelines such as an offshore pipeline between two islands Yul-Do and Youngjong-Do, and a land branch of Pyoungtaek, Korea and it has been operating in real time.

Study on the Influence of Stray current Between Sacrificial Anode Cathodic Protection and Impressed Current Cathodic Protection in Marine Environment

  • Jeong, Jin-A;Kim, Ki-Joon
    • Corrosion Science and Technology
    • /
    • v.11 no.3
    • /
    • pp.77-81
    • /
    • 2012
  • Cathodic protection(CP) is widely used as a means of protecting corrosion for not only marine structures like ship hulls and offshore drilling facilities, but also underground structures like buried pipelines and oil storage tanks. The principle of CP is that the anodic dissolution of metal can be protected by supplying electrons to the cathode metal. When unprotected structures are nearby to CP systems, interference problems between unprotected and protected structures may be happened. The stray current interference can accelerate the corrosion of nearby structures. So far many efforts have been made to reduce the interference in the electric railway systems adjacent to the underground metal structures like buried pipelines and gas/oil tanks. During recent few decades the protection technologies against stray current induced corrosion have been significantly improved and a number of techniques have been developed. However, there is very limited information an marine environments. Some complex harbor structures are protected by two cathodic protection systems, i.e. sacrificial anode cathodic protection(SACP) and impressed current cathodic protection(ICCP). In this case, when the protection current from sacrificial anodes returns to the cathode through electrolyte, it passes through nearby other low resistance metal structures. In many cases the stray current of ICCP systems influences the function of SACP. In this study, the risk of stray current from the SACP system to adjacent reinforced concrete structures has been verified through laboratory experiments. Concrete and steel pile structures modeled a part of bridge have been investigated in terms of CP potential and current between the two. The variation of stray current according to the magnitude of ICCP/SACP has been studied to mitigate it and to suggest the proper protection criteria.

An Analysis on Present State of the Oil and Gas Reserves and Development, Azerbaijan (아제르바이잔 석유가스 자원부존 및 개발 동향 분석)

  • Kil, Young-Woo;Park, Myong-Ho;Lee, Seong-Hun;Shin, Hong-Ja
    • Economic and Environmental Geology
    • /
    • v.41 no.5
    • /
    • pp.617-624
    • /
    • 2008
  • Azerbaijan, located on western part of Caspian Sea, has been developed oil and gas exploration and production business from about 200 years ago and once charged of 50% of world oil production in the early 20th century. After Azerbaijan was independent of Soviet Union in 1991, foreign oil companies, including Korean oil companies, have been investing in Azerbaijan oil business on offshore blocks. Productive capacity of downstream in the Azerbaijan is lower than productive capacity of upstream, whereas there are important pipelines, such as BTC, SCP, NREP, and WREP, provide opportunities of the oil and gas exporting to the world. Oil fields in onshore blocks in the Azerbaijan are almost mature oil fields, caused by high recovery rate. Offshore oil blocks are still high potential in oil exploration with high risk.

Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction

  • Kim, Min-Gyu;Kang, Hyungjoo;Lee, Mun-Jik;Cho, Gun Rae;Li, Ji-Hong;Yoon, Tae-Sagm;Ju, Jaeheung;Kwak, Han-Wan
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.5
    • /
    • pp.361-370
    • /
    • 2020
  • We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it's trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery system (LARS), A-frame, and winch in order to perform burial tasks because of its dimensions (6.5 m × 5.0 m × 4.5 m, 20 t) and the tough working environment. However, operating a DP vessel has disadvantages as it is expensive to rent and operate and it is difficult to adjust the working schedule for some domestic coast construction cases. In this paper, we propose a method using a barge instead of a DP vessel to avoid the above disadvantages. Although burying the cable and pipeline using a barge has lower working efficiency than a DP vessel, it can save construction expenses and does not require a large crew. The proposed method was applied over two months at the construction of the water supply in Yokji-do, and the results were verified.