A Hueristic Algorithm for Nonidentical Parallel Machines Scheduling (동일하지 않는 병렬기계 일정계획을 위한 휴리스틱 방법)

  • 전태웅;박해천
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.59
    • /
    • pp.37-42
    • /
    • 2000
  • The parallel machines scheduling problems is one of the combinatorial optimization problems that often occurs in the real world. This problem is classified into two cases, one of which is the case which processing time are identical and the other, nonidentical. Not so much researches have been made on the case that nonidentical parallel machines scheduling problem. This study proposes Tabu Search methods for solving parallel machines scheduling problems related to due dates: minimizing mean tardiness, minimizing the number of tardy jobs, minimizing the maximum tardiness.

  • PDF

A Study of New Production Input Control in an Agile Manufacturing Environment (신속제조환경에서의 새로운 생산입력통제방식에 관한 연구)

  • Kim, Hyun-Soo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.4
    • /
    • pp.699-708
    • /
    • 1997
  • Production control is usually composed of due-dote assignment, production input control, and priority dispatching rule. A production input control(PIC) is mainly to control the WIP level on the shop floor. On the other hand, a priority dispatching rule(PDR) is mainly to control the tardiness/earliness of on order and number of tardy jobs. Therefore, if we select a particular PIC which can control only a particular performance measure(i.e., tardiness), it may cause worsening other performance measure(i.e., WIP level, shopfloor time, etc.) This newly developed production input control, DRD(Dual Release-Dates), is mainly designed to control the WIP level on the shop floor by employing two different release-dates of an order(earliest release. date and latest release-date and the release condition (relationship between the current WIP level and the pre-defined maximum WIP level) while trying to meet the due-date of the order.

  • PDF

Dispatching Rule based Job-Shop Scheduling Algorithm with Delay Schedule for Minimizing Total Tardiness (지연 스케쥴을 허용하는 납기최소화 잡샵 스케쥴링 알고리즘)

  • Kim, Jae-Gon;Bang, June-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.1
    • /
    • pp.33-40
    • /
    • 2019
  • This study focuses on a job-shop scheduling problem with the objective of minimizing total tardiness for the job orders that have different due dates and different process flows. We suggest the dispatching rule based scheduling algorithm to generate fast and efficient schedule. First, we show the delay schedule can be optimal for total tardiness measure in some cases. Based on this observation, we expand search space for selecting the job operation to explore the delay schedules. That means, not only all job operations waiting for process but also job operations not arrived at the machine yet are considered to be scheduled when a machine is available and it is need decision for the next operation to be processed. Assuming each job operation is assigned to the available machine, the expected total tardiness is estimated, and the job operation with the minimum expected total tardiness is selected to be processed in the machine. If this job is being processed in the other machine, then machine should wait until the job arrives at the machine. Simulation experiments are carried out to test the suggested algorithm and compare with the results of other well-known dispatching rules such as EDD, ATC and COVERT, etc. Results show that the proposed algorithm, MET, works better in terms of total tardiness of orders than existing rules without increasing the number of tardy jobs.

Development of Agent-based Platform for Coordinated Scheduling in Global Supply Chain (글로벌 공급사슬에서 경쟁협력 스케줄링을 위한 에이전트 기반 플랫폼 구축)

  • Lee, Jung-Seung;Choi, Seong-Woo
    • Journal of Intelligence and Information Systems
    • /
    • v.17 no.4
    • /
    • pp.213-226
    • /
    • 2011
  • In global supply chain, the scheduling problems of large products such as ships, airplanes, space shuttles, assembled constructions, and/or automobiles are complicated by nature. New scheduling systems are often developed in order to reduce inherent computational complexity. As a result, a problem can be decomposed into small sub-problems, problems that contain independently small scheduling systems integrating into the initial problem. As one of the authors experienced, DAS (Daewoo Shipbuilding Scheduling System) has adopted a two-layered hierarchical architecture. In the hierarchical architecture, individual scheduling systems composed of a high-level dock scheduler, DAS-ERECT and low-level assembly plant schedulers, DAS-PBS, DAS-3DS, DAS-NPS, and DAS-A7 try to search the best schedules under their own constraints. Moreover, the steep growth of communication technology and logistics enables it to introduce distributed multi-nation production plants by which different parts are produced by designated plants. Therefore vertical and lateral coordination among decomposed scheduling systems is necessary. No standard coordination mechanism of multiple scheduling systems exists, even though there are various scheduling systems existing in the area of scheduling research. Previous research regarding the coordination mechanism has mainly focused on external conversation without capacity model. Prior research has heavily focuses on agent-based coordination in the area of agent research. Yet, no scheduling domain has been developed. Previous research regarding the agent-based scheduling has paid its ample attention to internal coordination of scheduling process, a process that has not been efficient. In this study, we suggest a general framework for agent-based coordination of multiple scheduling systems in global supply chain. The purpose of this study was to design a standard coordination mechanism. To do so, we first define an individual scheduling agent responsible for their own plants and a meta-level coordination agent involved with each individual scheduling agent. We then suggest variables and values describing the individual scheduling agent and meta-level coordination agent. These variables and values are represented by Backus-Naur Form. Second, we suggest scheduling agent communication protocols for each scheduling agent topology classified into the system architectures, existence or nonexistence of coordinator, and directions of coordination. If there was a coordinating agent, an individual scheduling agent could communicate with another individual agent indirectly through the coordinator. On the other hand, if there was not any coordinating agent existing, an individual scheduling agent should communicate with another individual agent directly. To apply agent communication language specifically to the scheduling coordination domain, we had to additionally define an inner language, a language that suitably expresses scheduling coordination. A scheduling agent communication language is devised for the communication among agents independent of domain. We adopt three message layers which are ACL layer, scheduling coordination layer, and industry-specific layer. The ACL layer is a domain independent outer language layer. The scheduling coordination layer has terms necessary for scheduling coordination. The industry-specific layer expresses the industry specification. Third, in order to improve the efficiency of communication among scheduling agents and avoid possible infinite loops, we suggest a look-ahead load balancing model which supports to monitor participating agents and to analyze the status of the agents. To build the look-ahead load balancing model, the status of participating agents should be monitored. Most of all, the amount of sharing information should be considered. If complete information is collected, updating and maintenance cost of sharing information will be increasing although the frequency of communication will be decreasing. Therefore the level of detail and updating period of sharing information should be decided contingently. By means of this standard coordination mechanism, we can easily model coordination processes of multiple scheduling systems into supply chain. Finally, we apply this mechanism to shipbuilding domain and develop a prototype system which consists of a dock-scheduling agent, four assembly- plant-scheduling agents, and a meta-level coordination agent. A series of experiments using the real world data are used to empirically examine this mechanism. The results of this study show that the effect of agent-based platform on coordinated scheduling is evident in terms of the number of tardy jobs, tardiness, and makespan.